State: Odisha District: Khordha Block: Bhubaneswar Gram Panchayat: Daruthenga
Work Code: OD/362/3460/119603/407462/00013194 (Krushna Nagar main road to Bhutanath Mandira CC road)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhubaneswar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 31-05-2025
Date of Completion: 14-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Suchismita Mohanty
Administrative Approval Details
Approval No.: OD/362/3460/119603/407462/00013194/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3460/119603/407462/00013194/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 145000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 9.86557312 502.629732 4958.730373332
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 10.477216 7343.9698225 76944.358127814
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 10.477216 5845.9633755 61249.421013203
Total Amount (in Rs.): 143152.50951435
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.86557312 Cubic Meter 0.1236 1.219384837632 - -
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.477216 Cubic Meter 4.6 48.1951936 0.68 7.12450688
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.477216 Cubic Meter 3.9 40.8611424 0.18 1.88589888
Total Qty 90.275720837632 9.01040576
Rate Per Man Day 462 562
Total Amount 41707.383026986 5063.84803712
Total Labour Amount (in Rs.): 46771.231064106
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM056 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.86557312 Cum 1 9.86557312 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.477216 Cum - - 3.23 33.84140768 0.45 4.7147472 0.9 9.4294944 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.477216 Cum - - 2.29 23.99282464 0.48 5.02906368 - - 0.96 10.05812736
Total Qty 9.86557312 57.83423232 9.74381088 9.4294944 10.05812736
Rate Per Unit 397.3 569.387 403.69 2169.52 1792.06
Total Amount 3919.592200576 32930.060037988 3933.4790141472 20457.476690688 18024.767716762
Total Material Amount (in Rs.): 79265.375660161
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM056 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.86557312 Cum 1 9.86557312 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.477216 Cum - - 3.23 33.84140768 0.45 4.7147472 0.9 9.4294944 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.477216 Cum - - 2.29 23.99282464 0.48 5.02906368 - - 0.96 10.05812736
Total Qty 9.86557312 57.83423232 9.74381088 9.4294944 10.05812736
Rate Per Unit 43.25 0 43.25 309.5 309.5
Total Amount 426.68603744 0 421.41982056 2918.4285168 3112.99041792
Total Royalty Amount (in Rs.): 6879.52479272
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 397 Rs. 397
2 Contingency @ Rs. 1450 Rs. 1450
Total Addition Component Amount (in Rs.): 1847
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1450 Rs. 1450
2 Royalty @ Rs. 3219.7192688 Rs. 3219.7192688
3 Additional Royalty @ Rs. 3176.8476336 Rs. 3176.8476336
4 EMF @ Rs. 160.98596344 Rs. 160.98596344
5 DMF @ Rs. 321.97192688 Rs. 321.97192688
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 48 x 3.945) @ 457.62 Rs. 457.62
7 Labour Cess @ Rs. 1450 Rs. 1450
8 Any Other Lumpsum Bill @ Rs. 136.38 Rs. 136.38
Total Deduction Component Amount (in Rs.): 10373.52479272