| State: Odisha |
District: Puri |
Block: Sadar |
Gram Panchayat: Ganganarayanpur |
Work Code: OD/369/3545/275344/409735/00013580 (Imp of road from Barabodia Bhagabat Ghar to Mohanty Sahi Ganganarayanpur GP)
Project Category: Road
| Financial Year: 2022-23 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Sadar |
Bill Status:
Final Bill
|
| Proposal Date: 15-07-2021 |
Date of Commencement: 19-08-2025 |
| Date of Completion: 29-10-2025 |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: Maintenance and improvement of Road infrastructure |
Project Sub-Category: CC Road |
| Project Type: Upgradation or Improvement |
Name of Executant: Tapabanta Sahoo |
Administrative Approval Details
Approval No.: OD/369/3545/275344/409735/00013580/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3545/275344/409735/00013580/TS
Fund Sanction No.: 11088
Fund Sanction Amount (in Rs.): 100000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
6.6 |
6220.24207318 |
41053.597682988 |
| 2 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
6.6 |
7747.48675566 |
51133.412587356 |
| 3 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
6.6 |
697.058772 |
4600.5878952 |
Total Amount (in Rs.): 96787.598165544
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Skilled
|
Un-Skilled
|
| Rs. 552 |
Rs. 452 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
6.6 |
Cubic Meter |
3.9 |
25.74 |
0.18 |
1.188 |
| 2 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
6.6 |
Cubic Meter |
4.6 |
30.36 |
0.68 |
4.488 |
| 3 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
6.6 |
Cubic Meter |
0.1236 |
0.81576 |
- |
- |
| Total Qty |
5.676 |
56.91576 |
| Rate Per Man Day |
552 |
452 |
| Total Amount |
3133.152 |
25725.92352 |
Total Labour Amount (in Rs.): 28859.07552
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM029 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
6.6 |
Cum |
2.29 |
15.114 |
0.48 |
3.168 |
0.96 |
6.336 |
- |
- |
- |
- |
| 2 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
6.6 |
Cum |
3.23 |
21.318 |
0.45 |
2.97 |
- |
- |
0.9 |
5.94 |
- |
- |
| 3 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
6.6 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
6.6 |
| Total Qty |
36.432 |
6.138 |
6.336 |
5.94 |
6.6 |
| Rate Per Unit |
596.333 |
715.57 |
1938.91 |
2350.53 |
518.79 |
| Total Amount |
21725.603856 |
4392.16866 |
12284.93376 |
13962.1482 |
3424.014 |
Total Material Amount (in Rs.): 55788.868476
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM029 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
6.6 |
Cum |
2.29 |
15.114 |
0.48 |
3.168 |
0.96 |
6.336 |
- |
- |
- |
- |
| 2 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
6.6 |
Cum |
3.23 |
21.318 |
0.45 |
2.97 |
- |
- |
0.9 |
5.94 |
- |
- |
| 3 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
6.6 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
6.6 |
| Total Qty |
36.432 |
6.138 |
6.336 |
5.94 |
6.6 |
| Rate Per Unit |
0 |
115.5 |
320 |
320 |
115.5 |
| Total Amount |
0 |
708.939 |
2027.52 |
1900.8 |
762.3 |
Total Royalty Amount (in Rs.): 5399.559
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Display Citizen Board @
Rs. 2000
|
Rs. 2000 |
| 2 |
Contingency @
Rs. 1000
|
Rs. 1000 |
Total Addition Component Amount (in Rs.): 3000
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| 1 |
Contingency @
Rs. 1000
|
Rs. 1000 |
| 2 |
Royalty @
Rs. 2041.71
|
Rs. 2041.71 |
| 3 |
Additional Royalty @
Rs. 3051.5925
|
Rs. 3051.5925 |
| 4 |
EMF @
Rs. 102.0855
|
Rs. 102.0855 |
| 5 |
DMF @
Rs. 204.171
|
Rs. 204.171 |
| 6 |
Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.92) @ 290.08
|
Rs. 290.08 |
| 7 |
Labour Cess @
Rs. 1000
|
Rs. 1000 |
| 8 |
Any Other Lumpsum Bill @
Rs. 3000
|
Rs. 3000 |
Total Deduction Component Amount (in Rs.): 10689.639
Total Net Amount (in Rs.): 89097.959165544