| State: Odisha | District: Koraput | Block: Koraput | Gram Panchayat: Mahadeiput |
| Financial Year: 2023-24 | Execution Level: ps |
| Executing Agency: Panchayat Samiti, Koraput | Bill Status: Final Bill |
| Proposal Date: - | Date of Commencement: 13-02-2025 |
| Date of Completion: 05-09-2025 | Scheme Name: Construction of Vana Suraksha Samiti Building |
| Scheme Component Name: Construction of Buildings for Vana Suraksha Samiti | Project Sub-Category: Vana Suraksha Samiti Building |
| Project Type: New Work | Name of Executant: Sarmistha Behera |
| Sl.No. | Activity taken | Unit | Quantity | Unit Price (in Rs.) | Total (in Rs.) |
|---|---|---|---|---|---|
| 1 | Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | Cum | 28.660132 | 235.56432 | 6751.3045056902 |
| 2 | Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | Cum | 9.98634 | 1534.156872 | 15320.612137128 |
| 3 | Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | Cum | 7.0266 | 6188.75985404 | 43485.939990397 |
| 4 | Masonry Stone Work (AR0703) : Random rubble H.G. stone of masonry. - Random rubble H.G. stone of size not less than 0.0025 cum stacked masonry in cement mortar (1:6) in foundation and plinth including watering, curing for seven days with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | Cum | 13.707315 | 4776.6518373076 | 65475.071379304 |
| 5 | R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) | Cum | 4.052988 | 6817.6231189091 | 27631.744689461 |
| 6 | R.C.C. Work (AR0404Ab) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) | Cum | 1.59758 | 7571.6832137118 | 12096.369668562 |
| 7 | R.C.C. Work (AR0404Ad) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) | Cum | 1.032585 | 13446.084482315 | 13884.225145171 |
| 8 | R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) | Cum | 4.205021 | 14774.579342618 | 62127.416401875 |
| 9 | R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) | Cum | 5.7108225 | 13067.507604737 | 74626.216448053 |
| 10 | R.C.C. Work (AR0404Ae) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Stairs excluding landing but including railing) | Cum | 1.368672 | 14663.736029725 | 20069.844919276 |
| 11 | Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | Sqm | 100.0085 | 182.6349186008 | 18265.044256888 |
| 12 | Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | Sqm | 116.9645 | 258.558471668 | 30242.162359412 |
| 13 | Plastering (AR1008) : 20mm thick cement Plaster in CM (1:6) over brick work in inside. - 20mm thick cement Plaster in CM (1:6) for stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | Sqm | 11.07 | 273.786813732 | 3030.8200280132 |
| 14 | Concrete (AR0317) : 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) | Sqm | 49.686 | 373.0253715908 | 18534.13861286 |
| 15 | Flooring (AR0817aa) : Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. | Sqm | 36.654 | 1655.996303707 | 60698.888516076 |
| 16 | Flooring (AR0817b) : Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. | Sqm | 20.955 | 969.036319707 | 20306.15607946 |
| 17 | Painting (AR0901di) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. | Sqm | 265.23 | 71.771178197849 | 19035.869593415 |
| 18 | Painting (AR0918f) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | Sqm | 111.08 | 86.684398875 | 9628.903027035 |
| 19 | Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) | Sqm | 154.17 | 63.831416725 | 9840.8895164932 |
| 20 | Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) | Sqm | 23.79375 | 166.32561990188 | 3957.5102185404 |
| 21 | miscellaneous (ARM105) : Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. | Sqm | 9.855 | 16.22 | 159.8481 |
| 22 | R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. | Qntl | 16.8 | 8712.0314269 | 146362.12797192 |
| 23 | Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | Cum | 19.897438 | 5397.180336272 | 107390.06111579 |
| Sl.No. | Activity Name | Quantity (A) | Unit | Un-Skilled | Skilled | Highly-Skilled | Semi-Skilled | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Rs. 452 | Rs. 552 | Rs. 602 | Rs. 502 | ||||||||
| Qty/Unit (B) | Total Qty (A*B) | Qty/Unit (B) | Total Qty (A*B) | Qty/Unit (B) | Total Qty (A*B) | Qty/Unit (B) | Total Qty (A*B) | ||||
| 1 | Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 28.660132 | Cubic Meter | 0.516 | 14.788628112 | - | - | - | - | - | - |
| 2 | Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 9.98634 | Cubic Meter | 0.1236 | 1.234311624 | - | - | - | - | - | - |
| 3 | Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 7.0266 | Cubic Meter | 3.9 | 27.40374 | - | - | 0.18 | 1.264788 | - | - |
| 4 | Masonry Stone Work (AR0703) : Random rubble H.G. stone of masonry. - Random rubble H.G. stone of size not less than 0.0025 cum stacked masonry in cement mortar (1:6) in foundation and plinth including watering, curing for seven days with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 13.707315 | Cubic Meter | 3.17 | 43.45218855 | - | - | 1.41 | 19.32731415 | 0.35 | 4.79756025 |
| 5 | R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) | 4.052988 | Cubic Meter | 1.3333 | 5.4038489004 | 0.1323 | 0.5362103124 | 0.175 | 0.7092729 | - | - |
| 6 | R.C.C. Work (AR0404Ab) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) | 1.59758 | Cubic Meter | 1.3333 | 2.130053414 | 0.3073 | 0.490936334 | 0.35 | 0.559153 | - | - |
| 7 | R.C.C. Work (AR0404Ad) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) | 1.032585 | Cubic Meter | 1.3333 | 1.3767455805 | 2.30105 | 2.37602971425 | 2.34375 | 2.42012109375 | - | - |
| 8 | R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) | 4.205021 | Cubic Meter | 1.3333 | 5.6065544993 | 5.29605 | 22.27000146705 | 5.33875 | 22.44955586375 | - | - |
| 9 | R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) | 5.7108225 | Cubic Meter | 1.3333 | 7.61423963925 | 3.11255 | 17.775220572375 | 3.15525 | 18.019072693125 | - | - |
| 10 | R.C.C. Work (AR0404Ae) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Stairs excluding landing but including railing) | 1.368672 | Cubic Meter | 1.3333 | 1.8248503776 | 5.0073 | 6.8533513056 | 5.05 | 6.9117936 | - | - |
| 11 | Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | 100.0085 | Square Meter | 0.12 | 12.00102 | - | - | 0.14 | 14.00119 | - | - |
| 12 | Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 116.9645 | Square Meter | 0.24 | 28.07148 | - | - | 0.16 | 18.71432 | - | - |
| 13 | Plastering (AR1008) : 20mm thick cement Plaster in CM (1:6) over brick work in inside. - 20mm thick cement Plaster in CM (1:6) for stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 11.07 | Square Meter | 0.24 | 2.6568 | - | - | 0.16 | 1.7712 | - | - |
| 14 | Concrete (AR0317) : 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) | 49.686 | Square Meter | 0.36 | 17.88696 | - | - | - | - | 0.1 | 4.9686 |
| 15 | Flooring (AR0817aa) : Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. | 36.654 | Square Meter | 0.325 | 11.91255 | 0.76 | 27.85704 | - | - | 0.325 | 11.91255 |
| 16 | Flooring (AR0817b) : Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. | 20.955 | Square Meter | 0.325 | 6.810375 | - | - | - | - | 0.325 | 6.810375 |
| 17 | Painting (AR0901di) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. | 265.23 | Square Meter | 0.053763440860215 | 14.259677419355 | - | - | - | - | 0.053763440860215 | 14.259677419355 |
| 18 | Painting (AR0918f) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | 111.08 | Square Meter | 0.064 | 7.10912 | - | - | - | - | 0.054 | 5.99832 |
| 19 | Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) | 154.17 | Square Meter | 0.043 | 6.62931 | - | - | - | - | 0.036 | 5.55012 |
| 20 | Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) | 23.79375 | Square Meter | 0.11827956989247 | 2.814314516129 | - | - | - | - | 0.13440860215054 | 3.1980846774194 |
| 22 | R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. | 16.8 | Quintal | 0.8 | 13.44 | 0.044 | 0.7392 | - | - | 0.3 | 5.04 |
| 23 | Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 19.897438 | Cubic Meter | 2.82 | 56.11077516 | - | - | 1.05 | 20.8923099 | 0.35 | 6.9641033 |
| Total Qty | 290.53754279253 | 127.04009120062 | 69.499390646774 | 78.897989705675 | |||||||
| Rate Per Man Day | 452 | 552 | 602 | 502 | |||||||
| Total Amount | 131322.96934223 | 70126.130342745 | 41838.633169358 | 39606.790832249 | |||||||
| Sl.No. | Activity Name | Quantity (A) | Unit | BRM029 | BRM340 | BRM028 | BRM044 | BRM034 | BRM060 | BRM052 | BRM104 | BRM092 | BRM094 | BRM084 | BRM064 | BRM131 | BRMMR0027 | BRM129 | BRM253 | BRM255 | BRM140 | BRM141 | BRMM105 | BRM162 | BRM341 | BRMMR0025 | BRM005 | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | ||||
| 1 | Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 28.660132 | Cum | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 2 | Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 9.98634 | Cum | 1 | 9.98634 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 3 | Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 7.0266 | Cum | - | - | 2.29 | 16.090914 | 0.48 | 3.372768 | 0.96 | 6.745536 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 4 | Masonry Stone Work (AR0703) :.Random rubble H.G. stone of masonry. - Random rubble H.G. stone of size not less than 0.0025 cum stacked masonry in cement mortar (1:6) in foundation and plinth including watering, curing for seven days with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 13.707315 | Cum | - | - | 0.8151 | 11.1728324565 | 0.34 | 4.6604871 | - | - | 1 | 13.707315 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 5 | R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) | 4.052988 | Cum | - | - | 3.4733 | 14.0772432204 | 0.45 | 1.8238446 | - | - | - | - | 0.36 | 1.45907568 | 0.54 | 2.18861352 | 0.004005 | 0.01623221694 | 0.189 | 0.766014732 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 6 | R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) | 1.59758 | Cum | - | - | 3.4733 | 5.548874614 | 0.45 | 0.718911 | - | - | - | - | 0.36 | 0.5751288 | 0.54 | 0.8626932 | 0.01335 | 0.021327693 | 0.63 | 1.0064754 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 7 | R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) | 1.032585 | Cum | - | - | 3.4733 | 3.5864774805 | 0.45 | 0.46466325 | - | - | - | - | 0.36 | 0.3717306 | 0.54 | 0.5575959 | 0.0741335 | 0.0765491400975 | - | - | 3.7695 | 3.8923291575 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 8 | R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) | 4.205021 | Cum | - | - | 3.4733 | 14.6052994393 | 0.45 | 1.89225945 | - | - | - | - | 0.36 | 1.51380756 | 0.54 | 2.27071134 | 0.041529 | 0.174630317109 | - | - | - | - | 4.4196 | 18.5845108116 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 9 | R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) | 5.7108225 | Cum | - | - | 3.4733 | 19.83539978925 | 0.45 | 2.569870125 | - | - | - | - | 0.36 | 2.0558961 | 0.54 | 3.08384415 | 0.0502172 | 0.286781515647 | - | - | - | - | 6.2216 | 35.530453266 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 10 | R.C.C. Work (AR0404Ae) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Stairs excluding landing but including railing) | 1.368672 | Cum | - | - | 3.4733 | 4.7538084576 | 0.45 | 0.6159024 | - | - | - | - | 0.36 | 0.49272192 | 0.54 | 0.73908288 | 0.04806 | 0.06577837632 | - | - | 1.17 | 1.60134624 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 11 | Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | 100.0085 | Sqm | - | - | 0.0358 | 3.5803043 | 0.015 | 1.5001275 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 12 | Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 116.9645 | Sqm | - | - | 0.043 | 5.0294735 | 0.018 | 2.105361 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 13 | Plastering (AR1008) :.20mm thick cement Plaster in CM (1:6) over brick work in inside. - 20mm thick cement Plaster in CM (1:6) for stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 11.07 | Sqm | - | - | 0.057 | 0.63099 | 0.021 | 0.23247 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 14 | Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) | 49.686 | Sqm | - | - | 0.1208 | 6.0020688 | 0.0169 | 0.8396934 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.0169 | 0.8396934 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 15 | Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. | 36.654 | Sqm | - | - | 0.1375 | 5.039925 | 0.015 | 0.54981 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1 | 36.654 | 1 | 36.654 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 16 | Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. | 20.955 | Sqm | - | - | 0.1375 | 2.8813125 | 0.015 | 0.314325 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1 | 20.955 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 17 | Painting(AR0901di) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. | 265.23 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.090322580645161 | 23.956258064516 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 18 | Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | 111.08 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.125 | 13.885 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 19 | Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) | 154.17 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.075 | 11.56275 | - | - | - | - | - | - | - | - | - | - | - | - |
| 20 | Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) | 23.79375 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.125 | 2.97421875 | - | - | - | - | - | - | - | - | - | - |
| 21 | miscellaneous(ARM105) :.Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. | 9.855 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1 | 9.855 | - | - | - | - | - | - | - | - |
| 22 | R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. | 16.8 | Qntl | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.8 | 13.44 | 1.05 | 17.64 | - | - | - | - |
| 23 | Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 19.897438 | Cum | - | - | 0.672 | 13.371078336 | 0.28 | 5.57128264 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1 | 19.897438 | 350 | 6964.1033 |
| Total Qty | 9.98634 | 126.20600189355 | 27.231775465 | 6.745536 | 13.707315 | 6.46836066 | 9.70254099 | 0.6412992591135 | 1.772490132 | 5.4936753975 | 54.1149640776 | 0.8396934 | 36.654 | 36.654 | 20.955 | 23.956258064516 | 13.885 | 11.56275 | 2.97421875 | 9.855 | 13.44 | 17.64 | 19.897438 | 6964.1033 | |||||||||||||||||||||||||||
| Rate Per Unit | 1255.85 | 603.03 | 1259.77 | 1687.9 | 984.61 | 2111.32 | 2074.94 | 58639.67 | 295.69 | 306.69 | 316.75 | 1542.85 | 662.9720557 | 8.5 | 417.0920557 | 159.3611 | 195.1211 | 249.6711 | 205.4911 | 16.22 | 90.1 | 6453.32 | 33 | 6.59565 | |||||||||||||||||||||||||||
| Total Amount | 12541.345089 | 76106.005321867 | 34305.773777543 | 11385.7902144 | 13496.35942215 | 13656.779228671 | 20132.190401791 | 37605.57692566 | 524.10760713108 | 1684.8553076593 | 17140.91487158 | 1295.52096219 | 24300.577729628 | 311.559 | 8740.1640271935 | 3817.6956370452 | 2709.2564735 | 2886.884511525 | 611.17548257812 | 159.8481 | 1210.944 | 113836.5648 | 656.615454 | 45932.787930645 | |||||||||||||||||||||||||||
| Sl.No. | Activity Name | Quantity (A) | Unit | BRM029 | BRM340 | BRM028 | BRM044 | BRM034 | BRM060 | BRM052 | BRM104 | BRM092 | BRM094 | BRM084 | BRM064 | BRM131 | BRM129 | BRM253 | BRM255 | BRM140 | BRM141 | BRM341 | BRM005 | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | ||||
| 1 | Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 28.660132 | Cum | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 2 | Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 9.98634 | Cum | 1 | 9.98634 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 3 | Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 7.0266 | Cum | - | - | 2.29 | 16.090914 | 0.48 | 3.372768 | 0.96 | 6.745536 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 4 | Masonry Stone Work (AR0703) :.Random rubble H.G. stone of masonry. - Random rubble H.G. stone of size not less than 0.0025 cum stacked masonry in cement mortar (1:6) in foundation and plinth including watering, curing for seven days with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 13.707315 | Cum | - | - | 0.8151 | 11.1728324565 | 0.34 | 4.6604871 | - | - | 1 | 13.707315 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 5 | R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) | 4.052988 | Cum | - | - | 3.4733 | 14.0772432204 | 0.45 | 1.8238446 | - | - | - | - | 0.36 | 1.45907568 | 0.54 | 2.18861352 | 0.004005 | 0.01623221694 | 0.000921 | 0.003732801948 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 6 | R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) | 1.59758 | Cum | - | - | 3.4733 | 5.548874614 | 0.45 | 0.718911 | - | - | - | - | 0.36 | 0.5751288 | 0.54 | 0.8626932 | 0.01335 | 0.021327693 | 0.00307 | 0.0049045706 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 7 | R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) | 1.032585 | Cum | - | - | 3.4733 | 3.5864774805 | 0.45 | 0.46466325 | - | - | - | - | 0.36 | 0.3717306 | 0.54 | 0.5575959 | 0.0741335 | 0.0765491400975 | - | - | 0.049542 | 0.05115632607 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 8 | R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) | 4.205021 | Cum | - | - | 3.4733 | 14.6052994393 | 0.45 | 1.89225945 | - | - | - | - | 0.36 | 1.51380756 | 0.54 | 2.27071134 | 0.041529 | 0.174630317109 | - | - | - | - | 0.045339 | 0.190651447119 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 9 | R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) | 5.7108225 | Cum | - | - | 3.4733 | 19.83539978925 | 0.45 | 2.569870125 | - | - | - | - | 0.36 | 2.0558961 | 0.54 | 3.08384415 | 0.0502172 | 0.286781515647 | - | - | - | - | 0.076659 | 0.4377859420275 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 10 | R.C.C. Work (AR0404Ae) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Stairs excluding landing but including railing) | 1.368672 | Cum | - | - | 3.4733 | 4.7538084576 | 0.45 | 0.6159024 | - | - | - | - | 0.36 | 0.49272192 | 0.54 | 0.73908288 | 0.04806 | 0.06577837632 | - | - | 0.01494 | 0.02044795968 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 11 | Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | 100.0085 | Sqm | - | - | 0.0358 | 3.5803043 | 0.015 | 1.5001275 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 12 | Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 116.9645 | Sqm | - | - | 0.043 | 5.0294735 | 0.018 | 2.105361 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 13 | Plastering (AR1008) :.20mm thick cement Plaster in CM (1:6) over brick work in inside. - 20mm thick cement Plaster in CM (1:6) for stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 11.07 | Sqm | - | - | 0.057 | 0.63099 | 0.021 | 0.23247 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 14 | Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) | 49.686 | Sqm | - | - | 0.1208 | 6.0020688 | 0.0169 | 0.8396934 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.0169 | 0.8396934 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 15 | Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. | 36.654 | Sqm | - | - | 0.1375 | 5.039925 | 0.015 | 0.54981 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1 | 36.654 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 16 | Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. | 20.955 | Sqm | - | - | 0.1375 | 2.8813125 | 0.015 | 0.314325 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1 | 20.955 | - | - | - | - | - | - | - | - | - | - | - | - |
| 17 | Painting(AR0901di) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. | 265.23 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.090322580645161 | 23.956258064516 | - | - | - | - | - | - | - | - | - | - |
| 18 | Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | 111.08 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.125 | 13.885 | - | - | - | - | - | - | - | - |
| 19 | Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) | 154.17 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.075 | 11.56275 | - | - | - | - | - | - |
| 20 | Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) | 23.79375 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.125 | 2.97421875 | - | - | - | - |
| 21 | miscellaneous(ARM105) :.Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. | 9.855 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 22 | R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. | 16.8 | Qntl | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.05 | 17.64 | - | - |
| 23 | Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 19.897438 | Cum | - | - | 0.672 | 13.371078336 | 0.28 | 5.57128264 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 350 | 6964.1033 |
| Total Qty | 9.98634 | 126.20600189355 | 27.231775465 | 6.745536 | 13.707315 | 6.46836066 | 9.70254099 | 0.6412992591135 | 0.008637372548 | 0.07160428575 | 0.6284373891465 | 0.8396934 | 36.654 | 20.955 | 23.956258064516 | 13.885 | 11.56275 | 2.97421875 | 17.64 | 6964.1033 | |||||||||||||||||||||||
| Rate Per Unit | 207.25 | 0 | 207.25 | 202.5 | 202.5 | 202.5 | 202.5 | 0 | 0 | 0 | 0 | 202.5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.04025 | |||||||||||||||||||||||
| Total Amount | 2069.668965 | 0 | 5643.7854651213 | 1365.97104 | 2775.7312875 | 1309.84303365 | 1964.764550475 | 0 | 0 | 0 | 0 | 170.0379135 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 280.305157825 | |||||||||||||||||||||||
| S/N | Item Name | Amount (in Rs.) |
|---|---|---|
| 1 | Provision for PH Work @ Rs. 10000 | Rs. 10000 |
| 2 | Display Citizen Board @ Rs. 5000 | Rs. 5000 |
| 3 | Any Other Lumpsum @ Rs. 8500 | Rs. 8500 |
| 4 | Contingency @ Rs. 8500 | Rs. 8500 |
| 5 | Provision for survey investigation and quality control @ Rs. 21078 | Rs. 21078 |
| Sl.No. | Item Name | Amount (in Rs.) |
|---|---|---|
| 1 | Contingency @ Rs. 8500 | Rs. 8500 |
| 2 | Royalty @ Rs. 6416.625643275 | Rs. 6416.625643275 |
| 3 | Additional Royalty @ Rs. 8200.987923305 | Rs. 8200.987923305 |
| 4 | EMF @ Rs. 320.83128216375 | Rs. 320.83128216375 |
| 5 | DMF @ Rs. 641.6625643275 | Rs. 641.6625643275 |
| 6 | Empty Gunny Bag (Cement x Gunny Bag Rate : 27 x 3.945) @ 1037.535 | Rs. 1037.535 |
| 7 | Labour Cess @ Rs. 8500 | Rs. 8500 |
| 8 | Any Other Lumpsum Bill @ Rs. 8500 | Rs. 8500 |