Final Dpr

State: Odisha District: Dhenkanal Block: Dhenkanal Sadar Gram Panchayat: Chaulia
Work Code: OD/352/3350/117263/403192/00016732 (Construction of CC road with drain from Sabar Sahi to Mohanty Sahi)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Dhenkanal Sadar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-03-2025
Date of Completion: 26-03-2025 Scheme Name: Infrastructure Development Fund
Scheme Component Name: Self/Personal Deposit Project Sub-Category: CC Road
Project Type: New Work Name of Executant: RASMITA MANJARI PRADHAN
Administrative Approval Details
Approval No.: OD/352/3350/117263/403192/00016732/AS
Technical Sanction Details
Technical Sanction No.: OD/352/3350/117263/403192/00016732/TS
Fund Sanction No.: 2425
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 13.1772795136 822.056372 10832.46658978
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 13.52899115968 5992.53651874 81072.973586093
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 13.3067439232 7577.27688138 100828.88309571
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 8.43745046 215.22489289764 1815.9493715826
Total Amount (in Rs.): 194550.27264316
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.1772795136 Cubic Meter 0.1236 1.628711747881 - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 13.52899115968 Cubic Meter 3.9 52.763065522752 - - 0.18 2.4352184087424
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.3067439232 Cubic Meter 4.6 61.21102204672 - - 0.68 9.048585867776
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.43745046 Square Meter - - 0.05 0.421872523 0.05 0.421872523
Total Qty 115.60279931735 11.905676799518 0.421872523
Rate Per Man Day 452 552 502
Total Amount 52252.465291444 6571.9335933342 211.780006546
Total Labour Amount (in Rs.): 59036.178891324
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.1772795136 Cum 1 13.1772795136 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 13.52899115968 Cum - - 2.29 30.981389755667 0.48 6.4939157566464 0.96 12.987831513293 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.3067439232 Cum - - 3.23 42.980782871936 0.45 5.98803476544 - - 0.9 11.97606953088 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.43745046 Sqm - - - - - - - - - - 0.00267 0.0225279927282 0.126 1.06311875796
Total Qty 13.1772795136 73.962172627603 12.481950522086 12.987831513293 11.97606953088 0.0225279927282 1.06311875796
Rate Per Unit 413.05 663.047 417.99 1362.4 1763.77 58573.086 229.106
Total Amount 5442.8753030925 49040.396674214 5217.3304987269 17694.62165371 21123.03215648 1319.5340554762 243.56688616118
Total Material Amount (in Rs.): 100081.35722786
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.1772795136 Cum 1 13.1772795136 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 13.52899115968 Cum - - 2.29 30.981389755667 0.48 6.4939157566464 0.96 12.987831513293 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.3067439232 Cum - - 3.23 42.980782871936 0.45 5.98803476544 - - 0.9 11.97606953088 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.43745046 Sqm - - - - - - - - - - 0.00267 0.0225279927282 0.000614 0.00518059458244
Total Qty 13.1772795136 73.962172627603 12.481950522086 12.987831513293 11.97606953088 0.0225279927282 0.00518059458244
Rate Per Unit 345 0 345 496.77 454.25 0 0
Total Amount 4546.161432192 0 4306.2729301198 6451.9650608585 5440.1295844022 0 0
Total Royalty Amount (in Rs.): 20744.529007573
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3183 Rs. 3183
2 Contingency @ 1% Rs. 1945.5027264316
Total Addition Component Amount (in Rs.): 5128.5027264316
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 1996.7877536959
2 Royalty @ Rs. 4143.3801869915 Rs. 4143.3801869915
3 Additional Royalty @ Rs. 15979.641792532 Rs. 15979.641792532
4 EMF @ Rs. 207.16900934957 Rs. 207.16900934957
5 DMF @ Rs. 414.33801869915 Rs. 414.33801869915
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 583.86 Rs. 583.86
7 Labour Cess @ 1% Rs. 1996.7877536959
Total Deduction Component Amount (in Rs.): 25321.964514964
Total Net Amount (in Rs.): 174356.81085463