Final Dpr

State: Odisha District: Ganjam Block: Hinjilicut Gram Panchayat: Darubhadra
Work Code: OD/354/3374/117762/412322/00017495 (IMPROVEMENT OF UP SCHOOL AT DARUBHADRA )
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Hinjilicut Bill Status: Final Bill
Proposal Date: 15-09-2021 Date of Commencement: 28-11-2025
Date of Completion: 17-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Elementary School
Project Type: New Work Name of Executant: KALPANA PADHI
Administrative Approval Details
Approval No.: OD/354/3374/117762/412322/00017495/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3374/117762/412322/00017495/TS
Fund Sanction No.: 3488
Fund Sanction Amount (in Rs.): 100000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 17.698637128 843.939032 14936.570685524
2 miscellaneous (ARM287) : Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge. Sqm 120.5442530743 631.7544 76154.362274403
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 0.8706423779328 7172.03636504 6244.2787954789
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 4.9248995136 216.39264180804 1065.712016387
Total Amount (in Rs.): 98400.923771792
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.698637128 Cubic Meter 0.1236 2.1875515490208 - - - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.8706423779328 Cubic Meter 4.6 4.0049549384909 - - 0.68 0.5920368169943
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 4.9248995136 Square Meter - - 0.05 0.24624497568 0.05 0.24624497568
Total Qty 6.1925064875117 0.8382817926743 0.24624497568
Rate Per Man Day 462 562 512
Total Amount 2860.9379972304 471.11436748296 126.07742754816
Total Labour Amount (in Rs.): 3458.1297922615
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRMM287 BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.698637128 Cum 1 17.698637128 - - - - - - - - - - - -
2 miscellaneous(ARM287) :.Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge. 120.5442530743 Sqm 0.03 3.616327592229 1 120.5442530743 - - - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.8706423779328 Cum - - - - 3.23 2.8121748807229 0.45 0.39178907006976 0.9 0.78357814013952 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 4.9248995136 Sqm - - - - - - - - - - 0.00267 0.013149481701312 0.126 0.6205373387136
Total Qty 21.314964720229 120.5442530743 2.8121748807229 0.39178907006976 0.78357814013952 0.013149481701312 0.6205373387136
Rate Per Unit 573.23 608.4 604.387 576.6 1802.83 58620.646 276.666
Total Amount 12218.377226577 73339.123570404 1699.6419396355 225.90557780222 1412.6581783877 770.83111189609 171.68158335254
Total Material Amount (in Rs.): 89838.219188055
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.698637128 Cum 1 17.698637128 - - - - - - - - - -
2 miscellaneous(ARM287) :.Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge. 120.5442530743 Sqm 0.03 3.616327592229 - - - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.8706423779328 Cum - - 3.23 2.8121748807229 0.45 0.39178907006976 0.9 0.78357814013952 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 4.9248995136 Sqm - - - - - - - - 0.00267 0.013149481701312 0.000614 0.0030238883013504
Total Qty 21.314964720229 2.8121748807229 0.39178907006976 0.78357814013952 0.013149481701312 0.0030238883013504
Rate Per Unit 205.25 0 205.25 374.5 0 0
Total Amount 4374.896508827 0 80.414706631818 293.45001348225 0 0
Total Royalty Amount (in Rs.): 4748.7612289411
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 598 Rs. 598
2 Contingency @ Rs. 1000 Rs. 1000
Total Addition Component Amount (in Rs.): 1598
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1000 Rs. 1000
2 Royalty @ Rs. 861.60154087859 Rs. 861.60154087859
3 Additional Royalty @ Rs. 3757.9194569307 Rs. 3757.9194569307
4 EMF @ Rs. 43.08007704393 Rs. 43.08007704393
5 DMF @ Rs. 86.160154087859 Rs. 86.160154087859
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 23.67 Rs. 23.67
7 Labour Cess @ Rs. 1000 Rs. 1000
8 Any Other Lumpsum Bill @ Rs. 2000 Rs. 2000
Total Deduction Component Amount (in Rs.): 8772.4312289411
Total Net Amount (in Rs.): 91226.492542851