Final Dpr

State: Odisha District: Ganjam Block: Polosara Gram Panchayat: Madhupalli
Work Code: OD/354/3380/117915/411583/00017498 (Repair & Maintenance of AWC Building at Hirapalli under Madhupalli GP)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Polosara Bill Status: Final Bill
Proposal Date: 20-07-2024 Date of Commencement: 13-05-2025
Date of Completion: 28-05-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: Sradhanta Prasad Sahu
Administrative Approval Details
Approval No.: OD/354/3380/117915/411583/00017498/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3380/117915/411583/00017498/TS
Fund Sanction No.: 45000
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0317) : 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) Sqm 40.32 351.297275446 14164.306145983
2 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 40.32 71.83248932951 2896.2859697658
3 Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. Sqm 171.3175 79.21834 13571.48796295
4 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 83.875 156.85349521701 13156.086911327
Total Amount (in Rs.): 43788.166990025
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Skilled
Rs. 462 Rs. 612 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0317) : 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 40.32 Square Meter 0.36 14.5152 - - 0.1 4.032
2 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 40.32 Square Meter 0.053763440860215 2.1677419354839 - - 0.053763440860215 2.1677419354839
3 Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 171.3175 Square Meter 0.057 9.7650975 0.05 8.565875 - -
4 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 83.875 Square Meter 0.11776344086022 9.8774086021505 - - 0.10776344086022 9.0386586021505
Total Qty 36.325448037634 15.238400537634 8.565875
Rate Per Man Day 462 612 562
Total Amount 16782.356993387 9325.9011290323 4814.02175
Total Labour Amount (in Rs.): 30922.279872419
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM064 BRM253 BRMMR0038 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 40.32 Sqm 0.1208 4.870656 0.0169 0.681408 0.0169 0.681408 - - - - - - - -
2 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 40.32 Sqm - - - - - - 0.084 3.38688 - - - - - -
3 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 171.3175 Sqm - - - - - - - - 0.8 137.054 - - - -
4 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 83.875 Sqm - - - - - - - - - - 0.125 10.484375 0.084 7.0455
Total Qty 4.870656 0.681408 0.681408 3.38688 137.054 10.484375 7.0455
Rate Per Unit 593.232 407.34 1155.02 159.27787 30 195.03787 125.74787
Total Amount 2889.429000192 277.56473472 787.03986816 539.4550323456 4111.62 2044.8501682813 885.956618085
Total Material Amount (in Rs.): 11535.915421784
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM064 BRM253 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 40.32 Sqm 0.1208 4.870656 0.0169 0.681408 0.0169 0.681408 - - - - - -
2 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 40.32 Sqm - - - - - - 0.084 3.38688 - - - -
3 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 171.3175 Sqm - - - - - - - - - - - -
4 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 83.875 Sqm - - - - - - - - 0.125 10.484375 0.084 7.0455
Total Qty 4.870656 0.681408 0.681408 3.38688 10.484375 7.0455
Rate Per Unit 0 40.25 149.5 0 0 0
Total Amount 0 27.426672 101.870496 0 0 0
Total Royalty Amount (in Rs.): 129.297168
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 240 Rs. 240
2 Any Other Lumpsum @ 1% Rs. 437.88166990025
3 Contingency @ 1% Rs. 437.88166990025
Total Addition Component Amount (in Rs.): 1115.7633398005
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 449.03930329825
2 Royalty @ Rs. 112.43232 Rs. 112.43232
3 EMF @ Rs. 5.621616 Rs. 5.621616
4 DMF @ Rs. 11.243232 Rs. 11.243232
5 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 39.45 Rs. 39.45
6 Labour Cess @ 1% Rs. 449.03930329825
7 Any Other Lumpsum Bill @ 2% Rs. 898.07860659651
Total Deduction Component Amount (in Rs.): 1964.904381193
Total Net Amount (in Rs.): 42939.025948633