Final Dpr

State: Odisha District: Angul Block: Banarpal Gram Panchayat: Budhapanka
Work Code: OD/344/3278/115611/404139/00017828 (Construction of Pandarbharania Gotha Sahi Culvert with CC Road)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Banarpal Bill Status: Final Bill
Proposal Date: - Date of Commencement: 22-07-2025
Date of Completion: 14-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Suraj Sekhar Palei
Administrative Approval Details
Approval No.: OD/344/3278/115611/404139/00017828/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3278/115611/404139/00017828/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 186532
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 25.10028 7284.68788866 182847.70571797
Total Amount (in Rs.): 182847.70571797
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.10028 Cubic Meter 4.6 115.461288 0.68 17.0681904
Total Qty 115.461288 17.0681904
Rate Per Man Day 462 562
Total Amount 53343.115056 9592.3230048
Total Labour Amount (in Rs.): 62935.4380608
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.10028 Cum 3.23 81.0739044 0.45 11.295126 0.9 22.590252
Total Qty 81.0739044 11.295126 22.590252
Rate Per Unit 532.527 743.49 2063.23
Total Amount 43174.043088419 8397.81322974 46608.88563396
Total Material Amount (in Rs.): 98180.741952119
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.10028 Cum 3.23 81.0739044 0.45 11.295126 0.9 22.590252
Total Qty 81.0739044 11.295126 22.590252
Rate Per Unit 0 156.25 293.5
Total Amount 0 1764.8634375 6630.238962
Total Royalty Amount (in Rs.): 8395.1023995
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 756.52 Rs. 756.52
2 Any Other Lumpsum @ Rs. 1062.45 Rs. 1062.45
3 Contingency @ Rs. 1865.32 Rs. 1865.32
Total Addition Component Amount (in Rs.): 3684.29
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 0.5% Rs. 932.65997858985
2 Royalty @ Rs. 3332.06217 Rs. 3332.06217
3 Additional Royalty @ Rs. 4563.230904 Rs. 4563.230904
4 EMF @ Rs. 166.6031085 Rs. 166.6031085
5 DMF @ Rs. 333.206217 Rs. 333.206217
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 163 x 3.945) @ 643.035 Rs. 643.035
7 Labour Cess @ 1% Rs. 1865.3199571797
Total Deduction Component Amount (in Rs.): 11836.11733527
Total Net Amount (in Rs.): 174695.87838271