Final Dpr

State: Odisha District: Khordha Block: Khordha Gram Panchayat: Bajapur
Work Code: OD/362/3464/119663/407431/00032317 (Const Of Metal Morrum Road From Bajapur Adibasi Sahi To Jharia Sahoo House,Bajapur)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Khordha Bill Status: Final Bill
Proposal Date: - Date of Commencement: 15-09-2025
Date of Completion: 15-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Mettalling Road
Project Type: New Work Name of Executant: SUBHASMITA SAHOO
Administrative Approval Details
Approval No.: OD/362/3464/119663/407431/00032317/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3464/119663/407431/00032317/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 250000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). Cum 53.2639008 1885.9100178028 100450.92410597
2 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. Sqm 529.5471 4.6662 2470.97267802
3 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. Cum 80.70288 1414.1884233516 114129.07862713
4 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. Sqm 529.5471 6.9683158064516 3690.0514271906
Total Amount (in Rs.): 220741.02683832
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 53.2639008 Cubic Meter 0.69444444444444 36.98882 0.028 1.4913892224 0.0055555555555556 0.29591056
2 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 529.5471 Square Meter 0.01 5.295471 - - - -
3 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 80.70288 Cubic Meter 1.1333922261484 91.468016819788 - - - -
4 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 529.5471 Square Meter 0.0032258064516129 1.7082164516129 - - - -
Total Qty 135.4605242714 0.29591056 1.4913892224
Rate Per Man Day 462 562 512
Total Amount 62582.762213387 166.30173472 763.5912818688
Total Labour Amount (in Rs.): 63512.655229976
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0037 BRM076 BRM026 BRM025 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 53.2639008 Cum 0.4 21.30556032 1.21 64.449319968 0.34669444444444 18.4662984968 - - - -
2 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 529.5471 Sqm - - - - - - - - - -
3 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 80.70288 Cum - - - - - - 0.89578798586572 72.292670328763 0.384 30.98990592
4 Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 529.5471 Sqm - - - - - - - - 0.006 3.1772826
Total Qty 21.30556032 64.449319968 18.4662984968 72.292670328763 34.16718852
Rate Per Unit 10 867.3 933.14 532.56 853
Total Amount 213.0556032 55896.895208246 17231.641779304 38500.184510286 29144.61180756
Total Material Amount (in Rs.): 140986.3889086
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM026 BRM025 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 53.2639008 Cum 0.34669444444444 18.4662984968 - - - -
2 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 529.5471 Sqm - - - - - -
3 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 80.70288 Cum - - 0.89578798586572 72.292670328763 0.384 30.98990592
4 Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 529.5471 Sqm - - - - 0.006 3.1772826
Total Qty 18.4662984968 72.292670328763 34.16718852
Rate Per Unit 214.75 48.5 48.5
Total Amount 3965.6376021878 3506.194510945 1657.10864322
Total Royalty Amount (in Rs.): 9128.9407563528
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1462 Rs. 1462
2 Any Other Lumpsum @ Rs. 24875 Rs. 24875
3 Contingency @ 1% Rs. 2207.4102683832
Total Addition Component Amount (in Rs.): 28544.410268383
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 2492.854371067
2 Royalty @ Rs. 4372.4155070947 Rs. 4372.4155070947
3 Additional Royalty @ Rs. 4100.6629231939 Rs. 4100.6629231939
4 EMF @ Rs. 218.62077535474 Rs. 218.62077535474
5 DMF @ Rs. 437.24155070947 Rs. 437.24155070947
6 Labour Cess @ 1% Rs. 2492.854371067
7 Any Other Lumpsum Bill @ Rs. 18000 Rs. 18000
Total Deduction Component Amount (in Rs.): 32114.649498487
Total Net Amount (in Rs.): 217170.78760821