Final Dpr

State: Odisha District: Sambalpur Block: Bamra Gram Panchayat: Kutarimal
Work Code: OD/371/3558/121285/381307/00035210 (Construction of CC Road of Dalki Bahal Transformer Pada)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bamra Bill Status: Final Bill
Proposal Date: 20-03-2025 Date of Commencement: 20-08-2025
Date of Completion: 18-10-2025 Scheme Name: Chief Minister Special Assistant
Scheme Component Name: Special Problem Fund (SPF) 16 th Phase Project Sub-Category: CC Road
Project Type: New Work Name of Executant: sanjaydehurybamra
Administrative Approval Details
Approval No.: OD/371/3558/121285/381307/00035210/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3558/121285/381307/00035210/TS
Fund Sanction No.: 957
Fund Sanction Amount (in Rs.): 500000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 35.372 216.39264180804 7654.240526034
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 38.3535 6008.9197853 230463.1049855
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 38.3535 555.068932 21288.836283462
4 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge Cum 40.26307 240.77592 9694.3777212744
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 29.63295 7563.3732941 224125.0626554
Total Amount (in Rs.): 493225.62217167
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
Rs. 512 Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 35.372 Square Meter - - 0.05 1.7686 0.05 1.7686
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 38.3535 Cubic Meter 3.9 149.57865 - - 0.18 6.90363
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 38.3535 Cubic Meter 0.1236 4.7404926 - - - -
4 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 40.26307 Cubic Meter 0.516 20.77574412 - - - -
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 29.63295 Cubic Meter 4.6 136.31157 - - 0.68 20.150406
Total Qty 1.7686 28.822636 311.40645672
Rate Per Man Day 512 562 462
Total Amount 905.5232 16198.321432 143869.78300464
Total Labour Amount (in Rs.): 160973.62763664
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM044 BRM029 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 35.372 Sqm 0.00267 0.09444324 0.126 4.456872 - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 38.3535 Cum - - - - 2.29 87.829515 0.48 18.40968 0.96 36.81936 - - - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 38.3535 Cum - - - - - - - - - - 1 38.3535 - -
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 40.26307 Cum - - - - - - - - - - - - - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 29.63295 Cum - - - - 3.23 95.7144285 0.45 13.3348275 - - - - 0.9 26.669655
Total Qty 0.09444324 4.456872 183.5439435 31.7445075 36.81936 38.3535 26.669655
Rate Per Unit 58620.646 276.666 574.677 417.99 1995.91 411.11 2442.53
Total Amount 5536.323739133 1233.064948752 105478.48281875 13268.886689925 73488.1288176 15767.507385 65141.43242715
Total Material Amount (in Rs.): 279913.82682631
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM044 BRM029 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 35.372 Sqm 0.00267 0.09444324 0.000614 0.021718408 - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 38.3535 Cum - - - - 2.29 87.829515 0.48 18.40968 0.96 36.81936 - - - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 38.3535 Cum - - - - - - - - - - 1 38.3535 - -
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 40.26307 Cum - - - - - - - - - - - - - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 29.63295 Cum - - - - 3.23 95.7144285 0.45 13.3348275 - - - - 0.9 26.669655
Total Qty 0.09444324 0.021718408 183.5439435 31.7445075 36.81936 38.3535 26.669655
Rate Per Unit 0 0 0 81.36 239.3 81.36 239.3
Total Amount 0 0 0 2582.7331302 8810.872848 3120.44076 6382.0484415
Total Royalty Amount (in Rs.): 20896.0951797
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3000 Rs. 3000
2 Contingency @ Rs. 3774 Rs. 3774
Total Addition Component Amount (in Rs.): 6774
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 3774 Rs. 3774
2 Royalty @ Rs. 10707.0022125 Rs. 10707.0022125
3 Additional Royalty @ Rs. 8583.042635325 Rs. 8583.042635325
4 EMF @ Rs. 535.350110625 Rs. 535.350110625
5 DMF @ Rs. 1070.70022125 Rs. 1070.70022125
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 192 x 3.945) @ 1451.76 Rs. 1451.76
7 Labour Cess @ Rs. 5000 Rs. 5000
Total Deduction Component Amount (in Rs.): 31121.8551797