| State: Odisha |
District: Khordha |
Block: Bolagarh |
Gram Panchayat: Sagaragaon |
Work Code: OD/362/3461/119634/406980/00036350 (Repair & Maintenance Of Balasinghpatna Pry School)
Project Category: Building
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Bolagarh |
Bill Status:
Final Bill
|
| Proposal Date: - |
Date of Commencement: 04-11-2025 |
| Date of Completion: 27-11-2025 |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: Maintenance of Primary School Building |
Project Sub-Category: Elementary School |
| Project Type: Repair and Maintenance |
Name of Executant: JYOTIRMAYEE SAHOO |
Administrative Approval Details
Approval No.: OD/362/3461/119634/406980/00036350/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3461/119634/406980/00036350/TS
Fund Sanction No.: 15220
Fund Sanction Amount (in Rs.): 250000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Dismantling (AR1603) : Dismantling brick or stone masonry under 3m. - Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead and as per direction of Engineer-in-Charge.
|
Cum |
4.05 |
1401.5088339223 |
5676.1107773853 |
| 2 |
Dismantling (AR1613) : Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
Sqm |
22.5 |
50.174193548387 |
1128.9193548387 |
| 3 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
Cum |
9.675 |
240.77592 |
2329.507026 |
| 4 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
0.9675 |
1121.557732 |
1085.10710571 |
| 5 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
1.935 |
5947.268446 |
11507.96444301 |
| 6 |
Masonry Stone Work (AR0717) : Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge.
|
Cum |
2.660625 |
5646.3248464 |
15022.753044453 |
| 7 |
Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge.
|
Cum |
23.3475 |
5352.1109374 |
124958.41011095 |
| 8 |
Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge.
|
Sqm |
233.605 |
177.83277656 |
41542.625768299 |
| 9 |
Plastering (AR1041) : Finishing wall cement washing one coat on the inner surface - Finishing wall cement washing one coat on the inner surface of on new work including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge.
|
Sqm |
233.605 |
17.507186002151 |
4089.7661860325 |
| 10 |
Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
Sqm |
234.14 |
160.04654216484 |
37473.297382476 |
Total Amount (in Rs.): 244814.46119915
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Highly-Skilled
|
Semi-Skilled
|
| Rs. 462 |
Rs. 562 |
Rs. 612 |
Rs. 512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1603) : Dismantling brick or stone masonry under 3m. - Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead and as per direction of Engineer-in-Charge.
|
4.05 |
Cubic Meter |
3.0035335689046 |
12.164310954064 |
- |
- |
- |
- |
- |
- |
| 2 |
Dismantling (AR1613) : Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
22.5 |
Square Meter |
0.10752688172043 |
2.4193548387097 |
- |
- |
- |
- |
- |
- |
| 3 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
9.675 |
Cubic Meter |
0.516 |
4.9923 |
- |
- |
- |
- |
- |
- |
| 4 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
0.9675 |
Cubic Meter |
0.1236 |
0.119583 |
- |
- |
- |
- |
- |
- |
| 5 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
1.935 |
Cubic Meter |
3.9 |
7.5465 |
- |
- |
0.18 |
0.3483 |
- |
- |
| 6 |
Masonry Stone Work (AR0717) : Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge.
|
2.660625 |
Cubic Meter |
1.21 |
3.21935625 |
1.41 |
3.75148125 |
1.05 |
2.79365625 |
2.295 |
6.106134375 |
| 7 |
Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge.
|
23.3475 |
Cubic Meter |
2.96 |
69.1086 |
- |
- |
1.05 |
24.514875 |
0.35 |
8.171625 |
| 8 |
Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge.
|
233.605 |
Square Meter |
0.12 |
28.0326 |
- |
- |
0.14 |
32.7047 |
- |
- |
| 9 |
Plastering (AR1041) : Finishing wall cement washing one coat on the inner surface - Finishing wall cement washing one coat on the inner surface of on new work including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge.
|
233.605 |
Square Meter |
0.010752688172043 |
2.5118817204301 |
- |
- |
0.0080645161290323 |
1.8839112903226 |
- |
- |
| 10 |
Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
234.14 |
Square Meter |
0.11776344086022 |
27.573132043011 |
- |
- |
- |
- |
0.10776344086022 |
25.231732043011 |
| Total Qty |
157.68761880621 |
62.245442540323 |
39.509491418011 |
3.75148125 |
| Rate Per Man Day |
462 |
562 |
612 |
512 |
| Total Amount |
72851.679888471 |
34981.938707661 |
24179.808747823 |
1920.7584 |
Total Labour Amount (in Rs.): 133934.18574395
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM079 |
BRMMR0025 |
BRM005 |
BRM255 |
BRM253 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1603) :.Dismantling brick or stone masonry under 3m. - Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead and as per direction of Engineer-in-Charge. |
4.05 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Dismantling (AR1613) :.Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
22.5 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
9.675 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
0.9675 |
Cum |
1 |
0.9675 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.935 |
Cum |
- |
- |
2.29 |
4.43115 |
0.48 |
0.9288 |
0.96 |
1.8576 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 6 |
Masonry Stone Work (AR0717) :.Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. |
2.660625 |
Cum |
- |
- |
0.572 |
1.5218775 |
0.24 |
0.63855 |
- |
- |
1 |
2.660625 |
- |
- |
- |
- |
- |
- |
- |
- |
| 7 |
Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
23.3475 |
Cum |
- |
- |
0.672 |
15.68952 |
0.28 |
6.5373 |
- |
- |
- |
- |
1 |
23.3475 |
350 |
8171.625 |
- |
- |
- |
- |
| 8 |
Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. |
233.605 |
Sqm |
- |
- |
0.0358 |
8.363059 |
0.015 |
3.504075 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 9 |
Plastering (AR1041) :.Finishing wall cement washing one coat on the inner surface - Finishing wall cement washing one coat on the inner surface of on new work including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge. |
233.605 |
Sqm |
- |
- |
0.010763440860215 |
2.5143936021505 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 10 |
Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
234.14 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
29.2675 |
0.090322580645161 |
21.148129032258 |
| Total Qty |
0.9675 |
32.520000102151 |
11.608725 |
1.8576 |
2.660625 |
23.3475 |
8171.625 |
29.2675 |
21.148129032258 |
| Rate Per Unit |
1010.1 |
575.332 |
1016.49 |
1726.96 |
1461.69 |
33 |
6.59565 |
193.13732 |
154.57732 |
| Total Amount |
977.27175 |
18709.79669877 |
11800.15287525 |
3208.000896 |
3889.00895625 |
770.4675 |
53897.17843125 |
5652.6465131 |
3269.0211088206 |
Total Material Amount (in Rs.): 102173.54472944
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM079 |
BRM005 |
BRM255 |
BRM253 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1603) :.Dismantling brick or stone masonry under 3m. - Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead and as per direction of Engineer-in-Charge. |
4.05 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Dismantling (AR1613) :.Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
22.5 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
9.675 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
0.9675 |
Cum |
1 |
0.9675 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.935 |
Cum |
- |
- |
2.29 |
4.43115 |
0.48 |
0.9288 |
0.96 |
1.8576 |
- |
- |
- |
- |
- |
- |
- |
- |
| 6 |
Masonry Stone Work (AR0717) :.Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. |
2.660625 |
Cum |
- |
- |
0.572 |
1.5218775 |
0.24 |
0.63855 |
- |
- |
1 |
2.660625 |
- |
- |
- |
- |
- |
- |
| 7 |
Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
23.3475 |
Cum |
- |
- |
0.672 |
15.68952 |
0.28 |
6.5373 |
- |
- |
- |
- |
350 |
8171.625 |
- |
- |
- |
- |
| 8 |
Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. |
233.605 |
Sqm |
- |
- |
0.0358 |
8.363059 |
0.015 |
3.504075 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 9 |
Plastering (AR1041) :.Finishing wall cement washing one coat on the inner surface - Finishing wall cement washing one coat on the inner surface of on new work including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge. |
233.605 |
Sqm |
- |
- |
0.010763440860215 |
2.5143936021505 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 10 |
Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
234.14 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
29.2675 |
0.090322580645161 |
21.148129032258 |
| Total Qty |
0.9675 |
32.520000102151 |
11.608725 |
1.8576 |
2.660625 |
8171.625 |
29.2675 |
21.148129032258 |
| Rate Per Unit |
43.25 |
0 |
43.25 |
158.5 |
182.5 |
0 |
0 |
0 |
| Total Amount |
41.844375 |
0 |
502.07735625 |
294.4296 |
485.5640625 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 1323.91539375
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Display Citizen Board @
Rs. 2685
|
Rs. 2685 |
| 2 |
Contingency @
1%
|
Rs. 2448.1446119915 |
Total Addition Component Amount (in Rs.): 5133.1446119915
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| 1 |
Contingency @
Rs. 2440.51
|
Rs. 2440.51 |
| 2 |
Royalty @
Rs. 1027.537125
|
Rs. 1027.537125 |
| 3 |
Additional Royalty @
Rs. 142.2477
|
Rs. 142.2477 |
| 4 |
EMF @
Rs. 51.37685625
|
Rs. 51.37685625 |
| 5 |
DMF @
Rs. 102.7537125
|
Rs. 102.7537125 |
| 6 |
Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 268.26
|
Rs. 268.26 |
| 7 |
Labour Cess @
1%
|
Rs. 2499.4760581114 |
Total Deduction Component Amount (in Rs.): 6532.1614518614
Total Net Amount (in Rs.): 243415.44435928