Final Dpr

State: Odisha District: Ganjam Block: Chikiti Gram Panchayat: Katuru
Work Code: OD/354/3370/117697/412720/00038833 (Repair & Maintenance of Multipurpose cyclone shelter at Aladipur)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Chikiti Bill Status: 1st Bill
Proposal Date: 01-02-2025 Date of Commencement: 19-09-2025
Date of Completion: - Scheme Name: Infrastructure Development Fund
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Cyclone Centre
Project Type: Repair and Maintenance Name of Executant: NARAYAN BEHERUK
Administrative Approval Details
Approval No.: OD/354/3370/117697/412720/00038833/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3370/117697/412720/00038833/TS
Fund Sanction No.: 595
Fund Sanction Amount (in Rs.): 580000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 167.8545 252.351281742 42358.298221163
2 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 1028.812 70.10525567621 72125.128302753
3 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 1028.812 61.2430758375 63007.61133853
4 Painting (AR0901di) : Fourth Floor - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 354.465 85.441655289516 30286.076342198
5 Painting (AR0918Ai) : Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. Sqm 354.465 57.1109133375 20243.819896177
Total Amount (in Rs.): 228020.93410082
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 167.8545 Square Meter 0.24 40.28508 0.16 26.85672 - -
2 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 1028.812 Square Meter 0.053763440860215 55.31247311828 - - 0.053763440860215 55.31247311828
3 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 1028.812 Square Meter 0.043 44.238916 - - 0.036 37.037232
4 Painting (AR0901di) : Fourth Floor - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 354.465 Square Meter 0.065349798387097 23.164216285282 - - 0.065349798387097 23.164216285282
5 Painting (AR0918Ai) : Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 354.465 Square Meter 0.043 15.241995 - - 0.036 12.76074
Total Qty 178.24268040356 26.85672 128.27466140356
Rate Per Man Day 462 562 612
Total Amount 82348.118346446 15093.47664 78504.09277898
Total Labour Amount (in Rs.): 175945.68776543
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM138 BRM140 BRM253 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 167.8545 Sqm 0.043 7.2177435 0.018 3.021381 - - - - - - - -
2 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 1028.812 Sqm - - - - 0.075 77.1609 - - - - - -
3 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 1028.812 Sqm - - - - - - 0.075 77.1609 - - - -
4 Painting(AR0901di) :.Fourth Floor - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 354.465 Sqm - - - - - - - - 0.090322580645161 32.016193548387 - -
5 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 354.465 Sqm - - - - - - - - - - 0.075 26.584875
Total Qty 7.2177435 3.021381 77.1609 77.1609 32.016193548387 26.584875
Rate Per Unit 619.175 628.68 155.58945 249.84945 159.53945 195.29945
Total Amount 4469.0463316125 1899.48180708 12005.421992505 19278.608426505 5107.8459098032 5192.0114658187
Total Material Amount (in Rs.): 47952.415933324
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM138 BRM140 BRM253 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 167.8545 Sqm 0.043 7.2177435 0.018 3.021381 - - - - - - - -
2 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 1028.812 Sqm - - - - 0.075 77.1609 - - - - - -
3 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 1028.812 Sqm - - - - - - 0.075 77.1609 - - - -
4 Painting(AR0901di) :.Fourth Floor - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 354.465 Sqm - - - - - - - - 0.090322580645161 32.016193548387 - -
5 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 354.465 Sqm - - - - - - - - - - 0.075 26.584875
Total Qty 7.2177435 3.021381 77.1609 77.1609 32.016193548387 26.584875
Rate Per Unit 0 237.25 0 0 0 0
Total Amount 0 716.82264225 0 0 0 0
Total Royalty Amount (in Rs.): 716.82264225
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for PH Work @ Rs. 153169 Rs. 153169
2 Display Citizen Board @ Rs. 3000 Rs. 3000
3 Any Other Lumpsum @ Rs. 4012 Rs. 4012
4 Contingency @ Rs. 4012 Rs. 4012
Total Addition Component Amount (in Rs.): 164193
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 4012 Rs. 4012
2 Royalty @ Rs. 105.748335 Rs. 105.748335
3 Additional Royalty @ Rs. 595.212057 Rs. 595.212057
4 EMF @ Rs. 5.28741675 Rs. 5.28741675
5 DMF @ Rs. 10.5748335 Rs. 10.5748335
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 59.175 Rs. 59.175
7 Labour Cess @ Rs. 4012 Rs. 4012
8 Any Other Lumpsum Bill @ Rs. 12036 Rs. 12036
Total Deduction Component Amount (in Rs.): 20835.99764225
Total Net Amount (in Rs.): 371377.93645857