Final Dpr

State: Odisha District: Ganjam Block: Hinjilicut Gram Panchayat: Darubhadra
Work Code: OD/354/3374/117762/412321/00039394 (REPAIR AND MANTAINANCE OF AWC-IV AT nIMIGAM)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Hinjilicut Bill Status: Final Bill
Proposal Date: 04-11-2024 Date of Commencement: 24-07-2025
Date of Completion: 17-09-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: KALPANA PADHI
Administrative Approval Details
Approval No.: OD/354/3374/117762/412321/00039394/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3374/117762/412321/00039394/TS
Fund Sanction No.: 11574
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 259.0509574575 71.84257680551 18610.888307681
2 Painting (AR0920k) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) Sqm 258.9394738575 96.0324829125 24866.600598592
Total Amount (in Rs.): 43477.488906273
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled
Rs. 612 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 259.0509574575 Square Meter 0.053763440860215 13.927470831048 0.053763440860215 13.927470831048
2 Painting (AR0920k) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) 258.9394738575 Square Meter 0.06528 16.903568853418 0.05508 14.262386220071
Total Qty 28.189857051119 30.831039684466
Rate Per Man Day 612 462
Total Amount 17252.192515285 14243.940334223
Total Labour Amount (in Rs.): 31496.132849508
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 259.0509574575 Sqm 0.084 21.76028042643 - -
2 Painting(AR0920k) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) 258.9394738575 Sqm - - 0.125 32.367434232187
Total Qty 21.76028042643 32.367434232187
Rate Per Unit 159.39677 249.70677
Total Amount 3468.5184142672 8082.367455307
Total Material Amount (in Rs.): 11550.885869574
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 259.0509574575 Sqm 0.084 21.76028042643 - -
2 Painting(AR0920k) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) 258.9394738575 Sqm - - 0.125 32.367434232187
Total Qty 21.76028042643 32.367434232187
Rate Per Unit 0 0
Total Amount 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1000 Rs. 1000
2 Any Other Lumpsum @ Rs. 305 Rs. 305
3 Contingency @ Rs. 217 Rs. 217
Total Addition Component Amount (in Rs.): 1522
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 217 Rs. 217
2 Labour Cess @ Rs. 450 Rs. 450
3 Any Other Lumpsum Bill @ Rs. 900 Rs. 900
Total Deduction Component Amount (in Rs.): 1567
Total Net Amount (in Rs.): 43432.488906273