Final Dpr

State: Odisha District: Kandhamal Block: K.Nuagan Gram Panchayat: Chanchedi
Work Code: OD/359/3426/118925/416199/00039742 (IMP OF TAPOBANA PAISAMUNDA TANK )
Project Category: Water Body
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, K.Nuagan Bill Status: 1st Bill
Proposal Date: 06-02-2023 Date of Commencement: 13-09-2025
Date of Completion: - Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: Tank
Project Type: Renovation or Rejuvenation Name of Executant: SAROJ KUMAR PRADHAN
Administrative Approval Details
Approval No.: OD/359/3426/118925/416199/00039742/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3426/118925/416199/00039742/TS
Fund Sanction No.: 4506
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Special items for irrigation works (AR0216) : Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. Cum 2883.742945 67.165 193686.59490093
Total Amount (in Rs.): 193686.59490093
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0065 BRMMR0102 BRMMR0104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Special items for irrigation works(AR0216) :.Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. 2883.742945 Cum 1 2883.742945 1 2883.742945 1 2883.742945
Total Qty 2883.742945 2883.742945 2883.742945
Rate Per Unit 1 25.01 40.49
Total Amount 2883.742945 72122.41105445 116762.75184305
Total Material Amount (in Rs.): 191768.9058425
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 4300 Rs. 4300
2 Contingency @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 6300
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2000 Rs. 2000
2 Labour Cess @ 1% Rs. 1999.8659490093
Total Deduction Component Amount (in Rs.): 3999.8659490093
Total Net Amount (in Rs.): 195986.72895192