State: Odisha District: Gajapati Block: Gumma Gram Panchayat: Tarangada
Work Code: OD/353/3358/117473/414597/00041138 (Const of Drain at Tarangada)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Gumma Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-08-2025
Date of Completion: 20-09-2025 Scheme Name: Kandhamal O Gajapati Bikas Yojana
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Drainage Work
Project Type: New Work Name of Executant: SOURAV PATTNAIK
Administrative Approval Details
Approval No.: OD/353/3358/117473/414597/00041138/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3358/117473/414597/00041138/TS
Fund Sanction No.: 2022
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 25.041 6234.0395438 156106.5842163
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 1.666875 8525.7026576 14211.280617387
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 57.15 216.70813962884 12384.870179788
4 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge Cum 45 240.77592 10834.9164
Total Amount (in Rs.): 193537.65141347
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 25.041 Cubic Meter 3.9 97.6599 - - 0.18 4.50738
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.666875 Cubic Meter 4.6 7.667625 - - 0.68 1.133475
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 57.15 Square Meter - - 0.05 2.8575 0.05 2.8575
4 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 45 Cubic Meter 0.516 23.22 - - - -
Total Qty 128.547525 8.498355 2.8575
Rate Per Man Day 462 562 512
Total Amount 59388.95655 4776.07551 1463.04
Total Labour Amount (in Rs.): 65628.07206
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 25.041 Cum 2.29 57.34389 0.48 12.01968 0.96 24.03936 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.666875 Cum 3.23 5.38400625 0.45 0.75009375 - - 0.9 1.5001875 - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 57.15 Sqm - - - - - - - - 0.00267 0.1525905 0.126 7.2009
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 45 Cum - - - - - - - - - - - -
Total Qty 62.72789625 12.76977375 24.03936 1.5001875 0.1525905 7.2009
Rate Per Unit 795.622 678.39 1128.47 2063.23 58715.766 371.786
Total Amount 49907.694270218 8662.8868142625 27127.6965792 3095.231855625 8959.468091823 2677.1938074
Total Material Amount (in Rs.): 100430.17141853
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 25.041 Cum 2.29 57.34389 0.48 12.01968 0.96 24.03936 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.666875 Cum 3.23 5.38400625 0.45 0.75009375 - - 0.9 1.5001875 - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 57.15 Sqm - - - - - - - - 0.00267 0.1525905 0.000614 0.0350901
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 45 Cum - - - - - - - - - - - -
Total Qty 62.72789625 12.76977375 24.03936 1.5001875 0.1525905 0.0350901
Rate Per Unit 0 319.5 419 419 0 0
Total Amount 0 4079.942713125 10072.49184 628.5785625 0 0
Total Royalty Amount (in Rs.): 14781.013115625
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3000 Rs. 3000
2 Contingency @ 1% Rs. 1935.3765141347
Total Addition Component Amount (in Rs.): 4935.3765141347
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 1984.730279276
2 Royalty @ Rs. 3767.08325625 Rs. 3767.08325625
3 Additional Royalty @ Rs. 10448.867370937 Rs. 10448.867370937
4 EMF @ Rs. 188.3541628125 Rs. 188.3541628125
5 DMF @ Rs. 376.708325625 Rs. 376.708325625
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 497.07 Rs. 497.07
7 Labour Cess @ 1% Rs. 1984.730279276
8 Any Other Lumpsum Bill @ 3% Rs. 5954.1908378281
Total Deduction Component Amount (in Rs.): 25201.734512005
Total Net Amount (in Rs.): 173271.2934156