Final Dpr

State: Odisha District: Cuttack Block: Tigiria Gram Panchayat: Bhiruda
Work Code: OD/350/3345/117170/398980/00043064 (Const of CC Road from Sabhapati Parida House to Post Office , Bhiruda ,, W.N-07)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Tigiria Bill Status: Final Bill
Proposal Date: 20-07-2023 Date of Commencement: 29-07-2025
Date of Completion: 01-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Mihir Kumar Sethy
Administrative Approval Details
Approval No.: OD/350/3345/117170/398980/00043064/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3345/117170/398980/00043064/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 300000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 2.194665 5944.87737806 13047.01431092
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 37.816787675 7475.31847622 282692.53161822
Total Amount (in Rs.): 295739.54592914
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled
Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 2.194665 Cubic Meter 3.9 8.5591935 0.18 0.3950397
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 37.816787675 Cubic Meter 4.6 173.957223305 0.68 25.715415619
Total Qty 26.110455319 182.516416805
Rate Per Man Day 562 462
Total Amount 14674.075889278 84322.58456391
Total Labour Amount (in Rs.): 98996.660453188
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 2.194665 Cum 2.29 5.02578285 0.48 1.0534392 0.96 2.1068784 - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 37.816787675 Cum 3.23 122.14822419025 0.45 17.01755445375 - - 0.9 34.0351089075
Total Qty 127.17400704025 18.07099365375 2.1068784 34.0351089075
Rate Per Unit 563.767 808.59 1417.71 1846.31
Total Amount 71696.508427061 14612.024758486 2986.942576464 62839.361927006
Total Material Amount (in Rs.): 152134.83768902
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 2.194665 Cum 2.29 5.02578285 0.48 1.0534392 0.96 2.1068784 - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 37.816787675 Cum 3.23 122.14822419025 0.45 17.01755445375 - - 0.9 34.0351089075
Total Qty 127.17400704025 18.07099365375 2.1068784 34.0351089075
Rate Per Unit 0 426.4 409 409
Total Amount 0 7705.471693959 861.7132656 13920.359543168
Total Royalty Amount (in Rs.): 22487.544502727
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1214 Rs. 1214
2 Contingency @ Rs. 3000 Rs. 3000
Total Addition Component Amount (in Rs.): 4214
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 3000 Rs. 3000
2 Royalty @ Rs. 5330.9431278563 Rs. 5330.9431278563
3 Additional Royalty @ Rs. 16356.959905692 Rs. 16356.959905692
4 EMF @ Rs. 266.54715639281 Rs. 266.54715639281
5 DMF @ Rs. 533.09431278562 Rs. 533.09431278562
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 245 x 3.945) @ 1009.92 Rs. 1009.92
7 Labour Cess @ Rs. 3000 Rs. 3000
8 Any Other Lumpsum Bill @ Rs. 5000 Rs. 5000
Total Deduction Component Amount (in Rs.): 34497.464502727