Final Dpr

State: Odisha District: Nayagarh Block: Dasapalla Gram Panchayat: Banigochha
Work Code: OD/367/3524/120607/405630/00043106 (Imp. of road from Garasa to Ragudu)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Dasapalla Bill Status: Final Bill
Proposal Date: - Date of Commencement: 30-07-2025
Date of Completion: 16-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Ramesh Chandra Jani
Administrative Approval Details
Approval No.: OD/367/3524/120607/405630/00043106/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3524/120607/405630/00043106/TS
Fund Sanction No.: 9122
Fund Sanction Amount (in Rs.): 280000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. Sqm 198.440808 4.6662 925.9644982896
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 20.1414000384 701.882532 14136.896856977
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 20.1414000384 5259.8091483 105939.92018155
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 20.1414000384 7219.2081181 145404.95866712
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 33.073468 216.23489289764 7151.6378107335
Total Amount (in Rs.): 273559.37801466
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 198.440808 Square Meter 0.01 1.98440808 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cubic Meter 0.1236 2.4894770447462 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cubic Meter 3.9 78.55146014976 - - 0.18 3.625452006912
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.1414000384 Cubic Meter 4.6 92.65044017664 - - 0.68 13.696152026112
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 33.073468 Square Meter - - 0.05 1.6536734 0.05 1.6536734
Total Qty 175.67578545115 18.975277433024 1.6536734
Rate Per Man Day 462 562 512
Total Amount 81162.21287843 10664.105917359 846.6807808
Total Labour Amount (in Rs.): 92672.999576589
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 198.440808 Sqm - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cum 1 20.1414000384 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cum - - 2.29 46.123806087936 0.48 9.667872018432 0.96 19.335744036864 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.1414000384 Cum - - 3.23 65.056722124032 0.45 9.06363001728 - - 0.9 18.12726003456 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 33.073468 Sqm - - - - - - - - - - 0.00267 0.08830615956 0.126 4.167256968
Total Qty 20.1414000384 111.18052821197 18.731502035712 19.335744036864 18.12726003456 0.08830615956 4.167256968
Rate Per Unit 332.58 579.287 599.41 1038.44 1867.93 58573.086 229.106
Total Amount 6698.6268247711 64405.434646326 11227.849635226 20079.010037641 33860.452836356 5172.3642782376 954.74357491061
Total Material Amount (in Rs.): 142398.48183347
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 198.440808 Sqm - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cum 1 20.1414000384 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cum - - 2.29 46.123806087936 0.48 9.667872018432 0.96 19.335744036864 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.1414000384 Cum - - 3.23 65.056722124032 0.45 9.06363001728 - - 0.9 18.12726003456 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 33.073468 Sqm - - - - - - - - - - 0.00267 0.08830615956 0.000614 0.020307109352
Total Qty 20.1414000384 111.18052821197 18.731502035712 19.335744036864 18.12726003456 0.08830615956 0.020307109352
Rate Per Unit 305.25 0 305.25 199.5 199.5 0 0
Total Amount 6148.1623617216 0 5717.7909964011 3857.4809353544 3616.3883768947 0 0
Total Royalty Amount (in Rs.): 19339.822670372
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 2000 Rs. 2000
2 Any Other Lumpsum @ Rs. 1704.75 Rs. 1704.75
3 Contingency @ 1% Rs. 2735.5937801466
Total Addition Component Amount (in Rs.): 6440.3437801466
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 2799.9972179481
2 Royalty @ Rs. 6230.742101879 Rs. 6230.742101879
3 Additional Royalty @ Rs. 12174.469253211 Rs. 12174.469253211
4 EMF @ Rs. 311.53710509395 Rs. 311.53710509395
5 DMF @ Rs. 623.0742101879 Rs. 623.0742101879
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 883.68 Rs. 883.68
7 Labour Cess @ 1% Rs. 2799.9972179481
8 Any Other Lumpsum Bill @ Rs. 169.5 Rs. 169.5
Total Deduction Component Amount (in Rs.): 25992.997106268
Total Net Amount (in Rs.): 254006.72468854