| State: Odisha |
District: Kalahandi |
Block: Kokasara |
Gram Panchayat: Temra |
Work Code: OD/358/3417/118787/424043/00044465 (Const. Of CC/ Gr-II Metalling Road From Panchayat Godown To Pujhari Bandh)
Project Category: Road
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Kokasara |
Bill Status:
Final Bill
|
| Proposal Date: - |
Date of Commencement: 19-09-2025 |
| Date of Completion: 22-10-2025 |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: Maintenance and improvement of Road infrastructure |
Project Sub-Category: Mettalling Road |
| Project Type: New Work |
Name of Executant: Sukanta Kumar Behera |
Administrative Approval Details
Approval No.: OD/358/3417/118787/424043/00044465/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3417/118787/424043/00044465/TS
Fund Sanction No.: 29359
Fund Sanction Amount (in Rs.): 500000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
Cum |
9.8 |
240.77592 |
2359.604016 |
| 2 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
45.57 |
5524.53118456 |
251752.8860804 |
| 3 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
28.616 |
7112.70479172 |
203537.16031986 |
| 4 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
Sqm |
58.8 |
216.39264180804 |
12723.887338313 |
| 5 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
35.77 |
585.045732 |
20927.08583364 |
Total Amount (in Rs.): 491300.62358821
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
| Rs. 462 |
Rs. 562 |
Rs. 512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
9.8 |
Cubic Meter |
0.516 |
5.0568 |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
45.57 |
Cubic Meter |
3.9 |
177.723 |
- |
- |
0.18 |
8.2026 |
| 3 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
28.616 |
Cubic Meter |
4.6 |
131.6336 |
- |
- |
0.68 |
19.45888 |
| 4 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
58.8 |
Square Meter |
- |
- |
0.05 |
2.94 |
0.05 |
2.94 |
| 5 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
35.77 |
Cubic Meter |
0.1236 |
4.421172 |
- |
- |
- |
- |
| Total Qty |
318.834572 |
30.60148 |
2.94 |
| Rate Per Man Day |
462 |
562 |
512 |
| Total Amount |
147301.572264 |
17198.03176 |
1505.28 |
Total Labour Amount (in Rs.): 166004.884024
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM104 |
BRM092 |
BRM029 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
9.8 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
45.57 |
Cum |
2.29 |
104.3553 |
0.48 |
21.8736 |
0.96 |
43.7472 |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
28.616 |
Cum |
3.23 |
92.42968 |
0.45 |
12.8772 |
- |
- |
0.9 |
25.7544 |
- |
- |
- |
- |
- |
- |
| 4 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
58.8 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.00267 |
0.156996 |
0.126 |
7.4088 |
- |
- |
| 5 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
35.77 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
35.77 |
| Total Qty |
196.78498 |
34.7508 |
43.7472 |
25.7544 |
0.156996 |
7.4088 |
35.77 |
| Rate Per Unit |
605.212 |
483.09 |
1466.56 |
1867.93 |
58620.646 |
276.666 |
478.15 |
| Total Amount |
119096.63131576 |
16787.763972 |
64157.893632 |
48107.416392 |
9203.206939416 |
2049.7630608 |
17103.4255 |
Total Material Amount (in Rs.): 276506.10081198
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM104 |
BRM092 |
BRM029 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
9.8 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
45.57 |
Cum |
2.29 |
104.3553 |
0.48 |
21.8736 |
0.96 |
43.7472 |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
28.616 |
Cum |
3.23 |
92.42968 |
0.45 |
12.8772 |
- |
- |
0.9 |
25.7544 |
- |
- |
- |
- |
- |
- |
| 4 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
58.8 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.00267 |
0.156996 |
0.000614 |
0.0361032 |
- |
- |
| 5 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
35.77 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
35.77 |
| Total Qty |
196.78498 |
34.7508 |
43.7472 |
25.7544 |
0.156996 |
0.0361032 |
35.77 |
| Rate Per Unit |
0 |
44 |
158 |
158 |
0 |
0 |
44 |
| Total Amount |
0 |
1529.0352 |
6912.0576 |
4069.1952 |
0 |
0 |
1573.88 |
Total Royalty Amount (in Rs.): 14084.168
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Display Citizen Board @
Rs. 3000
|
Rs. 3000 |
| 2 |
Any Other Lumpsum @
Rs. 699
|
Rs. 699 |
| 3 |
Contingency @
Rs. 5000
|
Rs. 5000 |
Total Addition Component Amount (in Rs.): 8699
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| 1 |
Contingency @
Rs. 5000
|
Rs. 5000 |
| 2 |
Royalty @
Rs. 11503.436
|
Rs. 11503.436 |
| 3 |
Additional Royalty @
Rs. 855.2166
|
Rs. 855.2166 |
| 4 |
EMF @
Rs. 575.1718
|
Rs. 575.1718 |
| 5 |
DMF @
Rs. 1150.3436
|
Rs. 1150.3436 |
| 6 |
Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 1554.33
|
Rs. 1554.33 |
| 7 |
Labour Cess @
Rs. 5000
|
Rs. 5000 |
Total Deduction Component Amount (in Rs.): 25638.498
Total Net Amount (in Rs.): 474361.12558821