Final Dpr

State: Odisha District: Puri Block: Pipili Gram Panchayat: Saraswatipur
Work Code: OD/369/3544/121056/408836/00046799 (Aseli Jena House To Budhanath House Cc Road)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Pipili Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-10-2025
Date of Completion: 14-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: HARAPRASAD JENA
Administrative Approval Details
Approval No.: OD/369/3544/121056/408836/00046799/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3544/121056/408836/00046799/TS
Fund Sanction No.: 2541
Fund Sanction Amount (in Rs.): 172711
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 14.063855 5901.7864795 83001.869288648
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 11.251084 7456.0608345 83888.76675807
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 16.59996 216.23489289764 3589.4905727051
Total Amount (in Rs.): 170480.12661942
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
Rs. 562 Rs. 462 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.063855 Cubic Meter 3.9 54.8490345 - - 0.18 2.5314939
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.251084 Cubic Meter 4.6 51.7549864 - - 0.68 7.65073712
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.59996 Square Meter - - 0.05 0.829998 0.05 0.829998
Total Qty 11.01222902 106.6040209 0.829998
Rate Per Man Day 562 462 512
Total Amount 6188.87270924 49251.0576558 424.958976
Total Labour Amount (in Rs.): 55864.88934104
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.063855 Cum 2.29 32.20622795 0.48 6.7506504 0.96 13.5013008 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.251084 Cum 3.23 36.34100132 0.45 5.0629878 - - 0.9 10.1259756 - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.59996 Sqm - - - - - - - - 0.00267 0.0443218932 0.126 2.09159496
Total Qty 68.54722927 11.8136382 13.5013008 10.1259756 0.0443218932 2.09159496
Rate Per Unit 589.887 520.27 1742.75 2154.37 58573.086 229.106
Total Amount 40435.119432392 6146.281546314 23529.3919692 21815.098053372 2596.0700620864 479.19695490576
Total Material Amount (in Rs.): 95001.158018271
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.063855 Cum 2.29 32.20622795 0.48 6.7506504 0.96 13.5013008 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.251084 Cum 3.23 36.34100132 0.45 5.0629878 - - 0.9 10.1259756 - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.59996 Sqm - - - - - - - - 0.00267 0.0443218932 0.000614 0.01019237544
Total Qty 68.54722927 11.8136382 13.5013008 10.1259756 0.0443218932 0.01019237544
Rate Per Unit 0 75.25 279.5 279.5 0 0
Total Amount 0 888.97627455 3773.6135736 2830.2101802 0 0
Total Royalty Amount (in Rs.): 7492.80002835
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 502 Rs. 502
2 Contingency @ Rs. 1727 Rs. 1727
Total Addition Component Amount (in Rs.): 2229
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1727 Rs. 1727
2 Royalty @ Rs. 3485.023269 Rs. 3485.023269
3 Additional Royalty @ Rs. 3485.023269 Rs. 3485.023269
4 EMF @ Rs. 174.25116345 Rs. 174.25116345
5 DMF @ Rs. 348.5023269 Rs. 348.5023269
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.92) @ 540.96 Rs. 540.96
7 Labour Cess @ Rs. 1727 Rs. 1727
8 Any Other Lumpsum Bill @ Rs. 3000 Rs. 3000
Total Deduction Component Amount (in Rs.): 14487.76002835
Total Net Amount (in Rs.): 158221.36659107