Final Dpr

State: Odisha District: Koraput Block: Kotpad Gram Panchayat: Bobeya
Work Code: OD/363/3472/119814/428192/00054847 (Repair and Maintenance of AWC Mahantiput 2)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kotpad Bill Status: Final Bill
Proposal Date: 24-01-2025 Date of Commencement: 22-10-2025
Date of Completion: 24-10-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: Rajesh Kumar Dhir
Administrative Approval Details
Approval No.: OD/363/3472/119814/428192/00054847/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3472/119814/428192/00054847/TS
Fund Sanction No.: 394
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0920bk) : Finishing wall two coats with plastic emulsion paint of approved shades with one coat water bound Primer on new work (Inside)(For repair and maintenance) . - Finishing wall two coats with plastic emulsion paint of approved shades with one coat waterbound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). Sqm 125.99 169.01634821378 21294.369711454
2 Painting (AR0918hk) : Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work(Outside)(For repair and maintenance). - Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). Sqm 90.19 163.14652836363 14714.185393116
3 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. Sqm 25.92 230.01640012053 5962.0250911241
Total Amount (in Rs.): 41970.580195694
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled
Rs. 612 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0920bk) : Finishing wall two coats with plastic emulsion paint of approved shades with one coat water bound Primer on new work (Inside)(For repair and maintenance) . - Finishing wall two coats with plastic emulsion paint of approved shades with one coat waterbound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). 125.99 Square Meter 0.12011870967742 15.133756232258 0.10991870967742 13.848658232258
2 Painting (AR0918hk) : Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work(Outside)(For repair and maintenance). - Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 90.19 Square Meter 0.12011870967742 10.833506425806 0.10991870967742 9.9135684258065
3 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 25.92 Square Meter 0.17204301075269 4.4593548387097 0.18817204301075 4.8774193548387
Total Qty 28.639646012903 30.426617496774
Rate Per Man Day 612 462
Total Amount 17527.463359897 14057.09728351
Total Labour Amount (in Rs.): 31584.560643406
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM140 BRM253 BRM255 BRM137 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0920bk) :.Finishing wall two coats with plastic emulsion paint of approved shades with one coat water bound Primer on new work (Inside)(For repair and maintenance) . - Finishing wall two coats with plastic emulsion paint of approved shades with one coat waterbound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). 125.99 Sqm 0.125 15.74875 0.084 10.58316 - - - - - -
2 Painting(AR0918hk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work(Outside)(For repair and maintenance). - Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 90.19 Sqm - - 0.090322580645161 8.1461935483871 0.125 11.27375 - - - -
3 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 25.92 Sqm - - - - - - 0.054 1.39968 0.125 3.24
Total Qty 15.74875 18.729353548387 11.27375 1.39968 3.24
Rate Per Unit 249.58787 159.27787 195.03787 137.36787 205.40787
Total Amount 3930.6969676625 2983.171539664 2198.8081869125 192.2710602816 665.5214988
Total Material Amount (in Rs.): 9970.4692533206
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM140 BRM253 BRM255 BRM137 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0920bk) :.Finishing wall two coats with plastic emulsion paint of approved shades with one coat water bound Primer on new work (Inside)(For repair and maintenance) . - Finishing wall two coats with plastic emulsion paint of approved shades with one coat waterbound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). 125.99 Sqm 0.125 15.74875 0.084 10.58316 - - - - - -
2 Painting(AR0918hk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work(Outside)(For repair and maintenance). - Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 90.19 Sqm - - 0.090322580645161 8.1461935483871 0.125 11.27375 - - - -
3 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 25.92 Sqm - - - - - - 0.054 1.39968 0.125 3.24
Total Qty 15.74875 18.729353548387 11.27375 1.39968 3.24
Rate Per Unit 0 0 0 0 0
Total Amount 0 0 0 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1000 Rs. 1000
2 Contingency @ Rs. 500 Rs. 500
Total Addition Component Amount (in Rs.): 1500
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 43470.580195694