Final Dpr

State: Odisha District: Nayagarh Block: Bhapur Gram Panchayat: Bijipur
Work Code: OD/367/3523/120594/406113/00055961 (Major Repairing of Door of Girls & Boys Toilet , Smart Class Roof grading, electrification of RCS High School, Bijipur)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhapur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 27-10-2025
Date of Completion: 11-01-2026 Scheme Name: Asset Management School and Mass Education Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Secondary School
Project Type: Repair and Maintenance Name of Executant: Gayatri Khatua
Administrative Approval Details
Approval No.: OD/367/3523/120594/406113/00055961/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3523/120594/406113/00055961/TS
Fund Sanction No.: 8559
Fund Sanction Amount (in Rs.): 150000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Dismantling (AR1621) : First floor - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. Sqm 197.87 81.6585 16157.767395
2 Iron Work (AR1704) : Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. Qntl 2.205 15756.901343087 34743.967461507
3 Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) Sqm 197.87 385.7239222956 76323.19250463
Total Amount (in Rs.): 127224.92736114
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled Highly-Skilled
Rs. 462 Rs. 512 Rs. 562 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Dismantling (AR1621) : First floor - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 197.87 Square Meter 0.175 34.62725 - - - - - -
2 Iron Work (AR1704) : Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.205 Quintal 6.3976377952756 14.106791338583 1.9685039370079 4.3405511811024 3.9370078740157 8.6811023622047 3.4448818897638 7.5959645669291
3 Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 197.87 Square Meter 0.414 81.91818 - - - - 0.115 22.75505
Total Qty 130.65222133858 4.3405511811024 8.6811023622047 30.351014566929
Rate Per Man Day 462 512 562 612
Total Amount 60361.326258425 2222.3622047244 4878.7795275591 18574.820914961
Total Labour Amount (in Rs.): 86037.288905669
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM341 BRM340 BRM028 BRM064
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1621) :.First floor - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 197.87 Sqm - - - - - - - -
2 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.205 Qntl 1 2.205 - - - - - -
3 Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 197.87 Sqm - - 0.1208 23.902696 0.0169 3.344003 0.0169 3.344003
Total Qty 2.205 23.902696 3.344003 3.344003
Rate Per Unit 6204.157 587.627 430.15 1256.41
Total Amount 13680.166185 14045.869542392 1438.42289045 4201.43880923
Total Material Amount (in Rs.): 33365.897427072
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM341 BRM340 BRM028 BRM064
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1621) :.First floor - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 197.87 Sqm - - - - - - - -
2 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.205 Qntl 1 2.205 - - - - - -
3 Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 197.87 Sqm - - 0.1208 23.902696 0.0169 3.344003 0.0169 3.344003
Total Qty 2.205 23.902696 3.344003 3.344003
Rate Per Unit 0 0 305.25 199.5
Total Amount 0 0 1020.75691575 667.1285985
Total Royalty Amount (in Rs.): 1687.88551425
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for PH Work @ Rs. 10700 Rs. 10700
2 Display Citizen Board @ Rs. 100 Rs. 100
3 Contingency @ Rs. 1500 Rs. 1500
Total Addition Component Amount (in Rs.): 12300
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1500 Rs. 1500
2 Royalty @ Rs. 551.760495 Rs. 552
3 Additional Royalty @ Rs. 1053.360945 Rs. 1053
4 EMF @ Rs. 27.58802475 Rs. 28
5 DMF @ Rs. 55.1760495 Rs. 55
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 48 x 3.945) @ 189.36 Rs. 189.36
7 Labour Cess @ Rs. 1500 Rs. 1500
Total Deduction Component Amount (in Rs.): 4877.36
Total Net Amount (in Rs.): 134647.56736114