Final Dpr

State: Odisha District: Khordha Block: Bolagarh Gram Panchayat: Kalanga
Work Code: OD/362/3461/119629/407012/00056253 (KALANGA TO PANDA SAHI ROAD )
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Bolagarh Bill Status: 1st Bill
Proposal Date: 22-04-2021 Date of Commencement: 09-10-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SANGEETA MAHARANA
Administrative Approval Details
Approval No.: OD/362/3461/119629/407012/00056253/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3461/119629/407012/00056253/TS
Fund Sanction No.: 8652
Fund Sanction Amount (in Rs.): 230376
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 12.42 5687.3465115 70636.84367283
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 20.825 7384.2385225 153776.76723106
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 5.77695 1028.637732 5942.3887458774
Total Amount (in Rs.): 230355.99964977
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.42 Cubic Meter 3.9 48.438 0.18 2.2356
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.825 Cubic Meter 4.6 95.795 0.68 14.161
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.77695 Cubic Meter 0.1236 0.71403102 - -
Total Qty 144.94703102 16.3966
Rate Per Man Day 462 562
Total Amount 66965.52833124 9214.8892
Total Labour Amount (in Rs.): 76180.41753124
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.42 Cum 2.29 28.4418 0.48 5.9616 0.96 11.9232 - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.825 Cum 3.23 67.26475 0.45 9.37125 - - 0.9 18.7425 - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.77695 Cum - - - - - - - - 1 5.77695
Total Qty 95.70655 15.33285 11.9232 18.7425 5.77695
Rate Per Unit 569.387 924.49 1519.07 2104.42 918.1
Total Amount 54494.06538485 14175.0664965 18112.175424 39442.09185 5303.817795
Total Material Amount (in Rs.): 131527.21695035
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.42 Cum 2.29 28.4418 0.48 5.9616 0.96 11.9232 - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.825 Cum 3.23 67.26475 0.45 9.37125 - - 0.9 18.7425 - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.77695 Cum - - - - - - - - 1 5.77695
Total Qty 95.70655 15.33285 11.9232 18.7425 5.77695
Rate Per Unit 0 43.25 158.5 158.5 43.25
Total Amount 0 663.1457625 1889.8272 2970.68625 249.8530875
Total Royalty Amount (in Rs.): 5773.5123
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
Total Addition Component Amount (in Rs.): 0
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2330 Rs. 2330
2 Royalty @ Rs. 4725.384 Rs. 4725.384
3 Additional Royalty @ Rs. 339.3207 Rs. 339.3207
4 EMF @ Rs. 236.2692 Rs. 236.2692
5 DMF @ Rs. 472.5384 Rs. 472.5384
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 757.44 Rs. 757.44
7 Labour Cess @ Rs. 2330 Rs. 2330
8 Any Other Lumpsum Bill @ Rs. 28 Rs. 28
Total Deduction Component Amount (in Rs.): 11218.9523
Total Net Amount (in Rs.): 219137.04734977