Final Dpr

State: Odisha District: Jagatsinghpur Block: Tirtol Gram Panchayat: Gopalpur
Work Code: OD/355/3393/118215/397636/00056486 (CONSTRUCTION OF CC ROAD FROM RAMA CHANDRA PRADHAN HOUSE TO POLUA GADA, VILL- ARANA.)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tirtol Bill Status: Final Bill
Proposal Date: - Date of Commencement: 14-10-2025
Date of Completion: 10-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: KISHORE CHANDRA SAHOO
Administrative Approval Details
Approval No.: OD/355/3393/118215/397636/00056486/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3393/118215/397636/00056486/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 186532
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 7.2 6888.29284728 49595.708500416
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 38 216.39264180804 8222.9203887055
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 14.7825 8410.91906236 124334.41103934
Total Amount (in Rs.): 182153.03992846
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
Rs. 562 Rs. 462 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.2 Cubic Meter 3.9 28.08 - - 0.18 1.296
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 38 Square Meter - - 0.05 1.9 0.05 1.9
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.7825 Cubic Meter 4.6 67.9995 - - 0.68 10.0521
Total Qty 13.2481 96.0795 1.9
Rate Per Man Day 562 462 512
Total Amount 7445.4322 44388.729 972.8
Total Labour Amount (in Rs.): 52806.9612
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.2 Cum 2.29 16.488 0.48 3.456 0.96 6.912 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 38 Sqm - - - - - - 0.00267 0.10146 0.126 4.788 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.7825 Cum 3.23 47.747475 0.45 6.652125 - - - - - - 0.9 13.30425
Total Qty 64.235475 10.108125 6.912 0.10146 4.788 13.30425
Rate Per Unit 619.272 412.82 2501.16 58620.646 276.666 2902.53
Total Amount 39779.2310742 4172.8361625 17288.01792 5947.65074316 1324.676808 38615.9847525
Total Material Amount (in Rs.): 107128.39746036
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.2 Cum 2.29 16.488 0.48 3.456 0.96 6.912 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 38 Sqm - - - - - - 0.00267 0.10146 0.000614 0.023332 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.7825 Cum 3.23 47.747475 0.45 6.652125 - - - - - - 0.9 13.30425
Total Qty 64.235475 10.108125 6.912 0.10146 0.023332 13.30425
Rate Per Unit 0 199.25 444.5 0 0 444.5
Total Amount 0 2014.04390625 3072.384 0 0 5913.739125
Total Royalty Amount (in Rs.): 11000.16703125
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1500 Rs. 1500
2 Any Other Lumpsum @ Rs. 1057.42 Rs. 1057.42
3 Contingency @ 1% Rs. 1821.5303992846
Total Addition Component Amount (in Rs.): 4378.9503992846
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 1865.3199032774
2 Royalty @ Rs. 2981.896875 Rs. 2981.896875
3 Additional Royalty @ Rs. 7570.985625 Rs. 7570.985625
4 EMF @ Rs. 149.09484375 Rs. 149.09484375
5 DMF @ Rs. 298.1896875 Rs. 298.1896875
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 96 x 3.945) @ 508.905 Rs. 508.905
7 Labour Cess @ 1% Rs. 1865.3199032774
8 Any Other Lumpsum Bill @ 3% Rs. 5595.9597098323
Total Deduction Component Amount (in Rs.): 20835.671547637
Total Net Amount (in Rs.): 165696.31878011