Final Dpr

State: Odisha District: Jagatsinghpur Block: Tirtol Gram Panchayat: Kostimallikapur
Work Code: OD/355/3393/118224/397696/00056736 (CONSTRUCTION OF CC ROAD FROM NARUA MULISINGH RD ROAD TO CHINAPADA VILLAGE ROAD.)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Tirtol Bill Status: Final Bill
Proposal Date: - Date of Commencement: 17-10-2025
Date of Completion: 11-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: RAMACHANDRA SARANGI
Administrative Approval Details
Approval No.: OD/355/3393/118224/397696/00056736/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3393/118224/397696/00056736/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 14.5522583712 6884.67497678 100187.56906384
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 9.769538391808 8441.41060886 82468.685024273
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 28.747346902 216.23489289764 6216.1794784453
4 Earth Work (AR0101aa) : Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum Cum 1.1387176368 179.18208 204.03779469451
5 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 10.026235564 798.771832 8008.6745495198
Total Amount (in Rs.): 197085.14591077
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
Rs. 562 Rs. 462 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.5522583712 Cubic Meter 3.9 56.75380764768 - - 0.18 2.619406506816
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.769538391808 Cubic Meter 4.6 44.939876602317 - - 0.68 6.6432861064294
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 28.747346902 Square Meter - - 0.05 1.4373673451 0.05 1.4373673451
4 Earth Work (AR0101aa) : Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 1.1387176368 Cubic Meter 0.384 0.4372675725312 - - - -
5 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.026235564 Cubic Meter 0.1236 1.2392427157104 - - - -
Total Qty 10.700059958345 103.37019453824 1.4373673451
Rate Per Man Day 562 462 512
Total Amount 6013.4336965901 47757.029876666 735.9320806912
Total Labour Amount (in Rs.): 54506.395653947
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.5522583712 Cum 2.29 33.324671670048 0.48 6.985084018176 0.96 13.970168036352 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.769538391808 Cum 3.23 31.55560900554 0.45 4.3962922763136 - - 0.9 8.7925845526272 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 28.747346902 Sqm - - - - - - - - 0.00267 0.07675541622834 0.126 3.622165709652 - -
4 Earth Work (AR0101aa) :.Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 1.1387176368 Cum - - - - - - - - - - - - - -
5 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.026235564 Cum - - - - - - - - - - - - 1 10.026235564
Total Qty 64.880280675588 11.38137629449 13.970168036352 8.7925845526272 0.07675541622834 3.622165709652 10.026235564
Rate Per Unit 613.327 543.02 2446.51 2892.31 58573.086 229.106 534.51
Total Amount 39792.827905916 6180.3149554337 34178.155802616 25430.880227409 4495.8015957084 829.85989707553 5359.1231713136
Total Material Amount (in Rs.): 116266.96355547
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.5522583712 Cum 2.29 33.324671670048 0.48 6.985084018176 0.96 13.970168036352 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.769538391808 Cum 3.23 31.55560900554 0.45 4.3962922763136 - - 0.9 8.7925845526272 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 28.747346902 Sqm - - - - - - - - 0.00267 0.07675541622834 0.000614 0.017650870997828 - -
4 Earth Work (AR0101aa) :.Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 1.1387176368 Cum - - - - - - - - - - - - - -
5 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.026235564 Cum - - - - - - - - - - - - 1 10.026235564
Total Qty 64.880280675588 11.38137629449 13.970168036352 8.7925845526272 0.07675541622834 0.017650870997828 10.026235564
Rate Per Unit 0 199.25 444.5 444.5 0 0 199.25
Total Amount 0 2267.7392266771 6209.7396921585 3908.3038336428 0 0 1997.727436127
Total Royalty Amount (in Rs.): 14383.510188605
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 956.86 Rs. 956.86
2 Contingency @ Rs. 1957 Rs. 1957
Total Addition Component Amount (in Rs.): 2913.86
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1957 Rs. 1957
2 Royalty @ Rs. 3708.4242516144 Rs. 3708.4242516144
3 Additional Royalty @ Rs. 10118.822299249 Rs. 10118.822299249
4 EMF @ Rs. 185.42121258072 Rs. 185.42121258072
5 DMF @ Rs. 370.84242516144 Rs. 370.84242516144
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 516.795 Rs. 516.795
7 Labour Cess @ Rs. 1957 Rs. 1957
8 Any Other Lumpsum Bill @ 5% Rs. 9999.9502955385
Total Deduction Component Amount (in Rs.): 28814.255484144
Total Net Amount (in Rs.): 171184.75042663