Final Dpr

State: Odisha District: Khordha Block: Khordha Gram Panchayat: Bajapur
Work Code: OD/362/3464/119663/407431/00060475 (Construction of Grade II Metal road from Dihapur Sukuta Ranasingh house to Nuapokhari)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Khordha Bill Status: Final Bill
Proposal Date: - Date of Commencement: 25-10-2025
Date of Completion: 19-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Mettalling Road
Project Type: New Work Name of Executant: BHASKAR CHANDRA RATH
Administrative Approval Details
Approval No.: OD/362/3464/119663/407431/00060475/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3464/119663/407431/00060475/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Road Work (AR1306) : Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. Cum 84.9504 116.655 9909.888912
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. Cum 84.9504 1473.0873792102 125139.36209886
3 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. Sqm 557.418 6.9683158064516 3884.2646602006
4 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). Cum 56.067264 1796.4787990806 100723.65109845
5 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. Sqm 557.418 4.6662 2601.0238716
Total Amount (in Rs.): 242258.19064111
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Road Work (AR1306) : Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 84.9504 Cubic Meter 0.25 21.2376 - - - -
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 84.9504 Cubic Meter 1.1333922261484 96.282122968198 - - - -
3 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 557.418 Square Meter 0.0032258064516129 1.7981225806452 - - - -
4 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 56.067264 Cubic Meter 0.69444444444444 38.9356 0.028 1.569883392 0.0055555555555556 0.3114848
5 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 557.418 Square Meter 0.01 5.57418 - - - -
Total Qty 163.82762554884 0.3114848 1.569883392
Rate Per Man Day 462 562 512
Total Amount 75688.363003565 175.0544576 803.780296704
Total Labour Amount (in Rs.): 76667.197757869
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM029 BRMMR0037 BRM076 BRM026
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1306) :.Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 84.9504 Cum - - - - - - - - - -
2 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 84.9504 Cum 0.89578798586572 76.097547714488 0.384 32.6209536 - - - - - -
3 Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 557.418 Sqm - - 0.006 3.344508 - - - - - -
4 Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 56.067264 Cum - - - - 0.4 22.4269056 1.21 67.84138944 0.34669444444444 19.438208944
5 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 557.418 Sqm - - - - - - - - - -
Total Qty 76.097547714488 35.9654616 22.4269056 67.84138944 19.438208944
Rate Per Unit 597.66 853 10 867.3 672.74
Total Amount 45480.460367041 30678.5387448 224.269056 58838.837061312 13076.860684987
Total Material Amount (in Rs.): 148298.96591414
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM029 BRM026
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1306) :.Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 84.9504 Cum - - - - - -
2 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 84.9504 Cum 0.89578798586572 76.097547714488 0.384 32.6209536 - -
3 Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 557.418 Sqm - - 0.006 3.344508 - -
4 Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 56.067264 Cum - - - - 0.34669444444444 19.438208944
5 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 557.418 Sqm - - - - - -
Total Qty 76.097547714488 35.9654616 19.438208944
Rate Per Unit 48.5 48.5 219.75
Total Amount 3690.7310641527 1744.3248876 4271.546415444
Total Royalty Amount (in Rs.): 9706.6023671967
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1800 Rs. 1800
2 Any Other Lumpsum @ Rs. 21765 Rs. 21765
3 Contingency @ 1% Rs. 2422.5819064111
Total Addition Component Amount (in Rs.): 25987.581906411
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 2682.4577254752
2 Royalty @ Rs. 4602.5426390471 Rs. 4602.5426390471
3 Additional Royalty @ Rs. 4413.6783322925 Rs. 4413.6783322925
4 EMF @ Rs. 230.12713195235 Rs. 230.12713195235
5 DMF @ Rs. 460.25426390471 Rs. 460.25426390471
6 Labour Cess @ 1% Rs. 2682.4577254752
7 Any Other Lumpsum Bill @ Rs. 21765 Rs. 21765
Total Deduction Component Amount (in Rs.): 36836.517818147
Total Net Amount (in Rs.): 231409.25472938