Final Dpr

State: Odisha District: Kendrapara Block: Pattamundai Gram Panchayat: Sansarfal
Work Code: OD/360/3440/119196/396287/00061089 (Construction of CC road from Gunthi village to Matha, GP Sansarafal)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Pattamundai Bill Status: Final Bill
Proposal Date: 31-12-2024 Date of Commencement: 10-11-2025
Date of Completion: 11-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: BANDITA BEHURA
Administrative Approval Details
Approval No.: OD/360/3440/119196/396287/00061089/AS
Technical Sanction Details
Technical Sanction No.: OD/360/3440/119196/396287/00061089/TS
Fund Sanction No.: 200000
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 25.1453184 7788.80807766 195852.05906925
Total Amount (in Rs.): 195852.05906925
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.1453184 Cubic Meter 4.6 115.66846464 0.68 17.098816512
Total Qty 115.66846464 17.098816512
Rate Per Man Day 462 562
Total Amount 53438.83066368 9609.534879744
Total Labour Amount (in Rs.): 63048.365543424
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.1453184 Cum 3.23 81.219378432 0.45 11.31539328 0.9 22.63078656
Total Qty 81.219378432 11.31539328 22.63078656
Rate Per Unit 605.327 608.22 2608.13
Total Amount 49164.282688107 6882.2485007616 59024.033350733
Total Material Amount (in Rs.): 115070.5645396
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.1453184 Cum 3.23 81.219378432 0.45 11.31539328 0.9 22.63078656
Total Qty 81.219378432 11.31539328 22.63078656
Rate Per Unit 0 346.74 149.5
Total Amount 0 3923.4994659072 3383.30259072
Total Royalty Amount (in Rs.): 7306.8020566272
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 2000 Rs. 2000
2 Contingency @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 4000
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2000 Rs. 2000
2 Royalty @ Rs. 3338.0410176 Rs. 3338.0410176
3 Additional Royalty @ Rs. 3468.0548863872 Rs. 3468.0548863872
4 EMF @ Rs. 166.90205088 Rs. 166.90205088
5 DMF @ Rs. 333.80410176 Rs. 333.80410176
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 163 x 3.945) @ 643.035 Rs. 643.035
7 Labour Cess @ Rs. 2000 Rs. 2000
Total Deduction Component Amount (in Rs.): 11949.837056627
Total Net Amount (in Rs.): 187902.22201263