Final Dpr

State: Odisha District: Mayurbhanj Block: Bangriposi Gram Panchayat: Nafri
Work Code: OD/365/3489/120092/389520/00061233 (Repairing of CC Road from Andola School to Nirmal house at Kadadiha village)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Bangriposi Bill Status: Final Bill
Proposal Date: - Date of Commencement: 18-10-2025
Date of Completion: 18-10-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: Pravamayee Tarai
Administrative Approval Details
Approval No.: OD/365/3489/120092/389520/00061233/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3489/120092/389520/00061233/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 190000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 8.369361 216.23489289764 1809.7478794567
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 23.5253655 7806.7797086 183657.3460228
Total Amount (in Rs.): 185467.09390226
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
Rs. 512 Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.369361 Square Meter - - 0.05 0.41846805 0.05 0.41846805
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.5253655 Cubic Meter 4.6 108.2166813 - - 0.68 15.99724854
Total Qty 0.41846805 16.41571659 108.2166813
Rate Per Man Day 512 562 462
Total Amount 214.2556416 9225.63272358 49996.1067606
Total Labour Amount (in Rs.): 59435.99512578
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.369361 Sqm 0.00267 0.02234619387 0.126 1.054539486 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.5253655 Cum - - - - 3.23 75.986930565 0.45 10.586414475 0.9 21.17282895
Total Qty 0.02234619387 1.054539486 75.986930565 10.586414475 21.17282895
Rate Per Unit 58573.086 229.106 650.732 473.06 1763.77
Total Amount 1308.8855353202 241.60132347952 49447.127300424 5008.0092315435 37344.000517141
Total Material Amount (in Rs.): 93349.623907908
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.369361 Sqm 0.00267 0.02234619387 0.000614 0.005138787654 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.5253655 Cum - - - - 3.23 75.986930565 0.45 10.586414475 0.9 21.17282895
Total Qty 0.02234619387 0.005138787654 75.986930565 10.586414475 21.17282895
Rate Per Unit 0 0 0 556.25 565.5
Total Amount 0 0 0 5888.6930517188 11973.234771225
Total Royalty Amount (in Rs.): 17861.927822944
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 2632.5 Rs. 2632.5
2 Contingency @ Rs. 1900 Rs. 1900
Total Addition Component Amount (in Rs.): 4532.5
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1900 Rs. 1900
2 Royalty @ Rs. 3122.992270125 Rs. 3122.992270125
3 Additional Royalty @ Rs. 14270.4867123 Rs. 14270.4867123
4 EMF @ Rs. 156.14961350625 Rs. 156.14961350625
5 DMF @ Rs. 312.2992270125 Rs. 312.2992270125
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 152 x 3.945) @ 599.64 Rs. 599.64
Total Deduction Component Amount (in Rs.): 20361.567822944