Final Dpr

State: Odisha District: Puri Block: Gop Gram Panchayat: Jangalbori
Work Code: OD/369/3539/120944/409400/00061234 (COnst. of CC road from Chhabindra Sahoo house to Akhandalmani Pitha)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Bill Status: 1st Bill
Proposal Date: 03-06-2023 Date of Commencement: 22-10-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Kamalakanta Baskey
Administrative Approval Details
Approval No.: OD/369/3539/120944/409400/00061234/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120944/409400/00061234/TS
Fund Sanction No.: 304836
Fund Sanction Amount (in Rs.): 304836
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 30.8369952 8038.471628 247882.31100797
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 21.36769 216.23489289764 4620.44015862
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 6.95743776 6516.087518 45335.273345198
Total Amount (in Rs.): 297838.02451179
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 30.8369952 Cubic Meter 4.6 141.85017792 - - 0.68 20.969156736
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 21.36769 Square Meter - - 0.05 1.0683845 0.05 1.0683845
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.95743776 Cubic Meter 3.9 27.134007264 - - 0.18 1.2523387968
Total Qty 168.984185184 23.2898800328 1.0683845
Rate Per Man Day 462 562 512
Total Amount 78070.693555008 13088.912578434 547.012864
Total Labour Amount (in Rs.): 91706.618997442
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 30.8369952 Cum 3.23 99.603494496 0.45 13.87664784 0.9 27.75329568 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 21.36769 Sqm - - - - - - 0.00267 0.0570517323 0.126 2.69232894 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.95743776 Cum 2.29 15.9325324704 0.48 3.3395701248 - - - - - - 0.96 6.6791402496
Total Qty 115.5360269664 17.2162179648 27.75329568 0.0570517323 2.69232894 6.6791402496
Rate Per Unit 595.832 806.71 2580.53 58573.086 229.106 2168.91
Total Amount 68840.062019444 13888.495194384 71618.21210111 3341.6960224569 616.82871412764 14486.45407876
Total Material Amount (in Rs.): 172791.74813028
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 30.8369952 Cum 3.23 99.603494496 0.45 13.87664784 0.9 27.75329568 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 21.36769 Sqm - - - - - - 0.00267 0.0570517323 0.000614 0.01311976166 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.95743776 Cum 2.29 15.9325324704 0.48 3.3395701248 - - - - - - 0.96 6.6791402496
Total Qty 115.5360269664 17.2162179648 27.75329568 0.0570517323 0.01311976166 6.6791402496
Rate Per Unit 0 115.25 309.5 0 0 309.5
Total Amount 0 1984.1691204432 8589.64501296 0 0 2067.1939072512
Total Royalty Amount (in Rs.): 12641.008040654
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 4019 Rs. 4019
2 Contingency @ 1% Rs. 2978.3802451179
Total Addition Component Amount (in Rs.): 6997.3802451179
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2978.38 Rs. 2978.38
2 Royalty @ Rs. 5078.784299616 Rs. 5078.784299616
3 Additional Royalty @ Rs. 6800.406096096 Rs. 6800.406096096
4 EMF @ Rs. 253.9392149808 Rs. 253.9392149808
5 DMF @ Rs. 507.8784299616 Rs. 507.8784299616
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 32 x 3.92) @ 909.44 Rs. 909.44
7 Labour Cess @ 1% Rs. 3048.3540475691
Total Deduction Component Amount (in Rs.): 19577.182088223
Total Net Amount (in Rs.): 285258.22266868