Final Dpr

State: Odisha District: Khordha Block: Balianta Gram Panchayat: Jhinti Sasan
Work Code: OD/362/3456/119542/407665/00061609 (PRESERVATION & DEVELOPMENT OF BRAMHANSUANLO POKHARI ,JHITISASAN GP)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Balianta Bill Status: Final Bill
Proposal Date: 22-11-2022 Date of Commencement: 06-11-2025
Date of Completion: 02-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Preservation and Development of Water Bodies Project Sub-Category: Tank
Project Type: New Work Name of Executant: RANJIT BALABANTARAY
Administrative Approval Details
Approval No.: OD/362/3456/119542/407665/00061609/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3456/119542/407665/00061609/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 663375
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Special items for irrigation works (AR0201) : Excavation of any approved type of soil in an approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within an initial lead of 1km - Excavation of any approved type of soil in an approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within an initial lead of 1km on a properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area, etc. complete as per the direction of Engineer-in charge. (measurement of the fill to be taken on the finished compacted section under OMC condition). Cum 9920.925 56.56 561127.518
2 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge Cum 10.62675 240.77592 2558.66550786
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 3.996 685.560932 2739.501484272
4 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 12.24725 6014.4315775 73660.247137537
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 1.49825 7442.3319045 11150.473775917
6 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 15.772 216.23489289764 3410.4567307816
Total Amount (in Rs.): 654646.86263637
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
2 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.62675 Cubic Meter 0.516 5.483403 - - - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.996 Cubic Meter 0.1236 0.4939056 - - - -
4 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.24725 Cubic Meter 3.9 47.764275 - - 0.18 2.204505
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.49825 Cubic Meter 4.6 6.89195 - - 0.68 1.01881
6 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 15.772 Square Meter - - 0.05 0.7886 0.05 0.7886
Total Qty 60.6335336 4.011915 0.7886
Rate Per Man Day 462 562 512
Total Amount 28012.6925232 2254.69623 403.7632
Total Labour Amount (in Rs.): 30671.1519532
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0101 BRMMR0103 BRMMR0060 BRMMR0106 BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Special items for irrigation works(AR0201) :.Excavation of any approved type of soil in an approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within an initial lead of 1km - Excavation of any approved type of soil in an approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within an initial lead of 1km on a properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area, etc. complete as per the direction of Engineer-in charge. (measurement of the fill to be taken on the finished compacted section under OMC condition). 9920.925 Cum 1 9920.925 1 9920.925 1 9920.925 1 9920.925 - - - - - - - - - - - - - -
2 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.62675 Cum - - - - - - - - - - - - - - - - - - - - - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.996 Cum - - - - - - - - 1 3.996 - - - - - - - - - - - -
4 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.24725 Cum - - - - - - - - - - 2.29 28.0462025 0.48 5.87868 0.96 11.75736 - - - - - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.49825 Cum - - - - - - - - - - 3.23 4.8393475 0.45 0.6742125 - - 0.9 1.348425 - - - -
6 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 15.772 Sqm - - - - - - - - - - - - - - - - - - 0.00267 0.04211124 0.126 1.987272
Total Qty 9920.925 9920.925 9920.925 9920.925 3.996 32.88555 6.5528925 11.75736 1.348425 0.04211124 1.987272
Rate Per Unit 21.51 28.99 1.5 4 475.42 569.387 481.81 1995.16 2372.62 58573.086 229.106
Total Amount 213399.09675 287607.61575 14881.3875 39683.7 1899.77832 18724.60465785 3157.249135425 23457.8143776 3199.3001235 2466.5852820866 455.295938832
Total Material Amount (in Rs.): 608932.42783529
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Special items for irrigation works(AR0201) :.Excavation of any approved type of soil in an approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within an initial lead of 1km - Excavation of any approved type of soil in an approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within an initial lead of 1km on a properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area, etc. complete as per the direction of Engineer-in charge. (measurement of the fill to be taken on the finished compacted section under OMC condition). 9920.925 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.62675 Cum - - - - - - - - - - - - - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.996 Cum 1 3.996 - - - - - - - - - - - -
4 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.24725 Cum - - 2.29 28.0462025 0.48 5.87868 0.96 11.75736 - - - - - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.49825 Cum - - 3.23 4.8393475 0.45 0.6742125 - - 0.9 1.348425 - - - -
6 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 15.772 Sqm - - - - - - - - - - 0.00267 0.04211124 0.000614 0.009684008
Total Qty 3.996 32.88555 6.5528925 11.75736 1.348425 0.04211124 0.009684008
Rate Per Unit 146.25 0 146.25 319.5 319.5 0 0
Total Amount 584.415 0 958.360528125 3756.47652 430.8217875 0 0
Total Royalty Amount (in Rs.): 5730.073835625
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 2171 Rs. 2171
2 Contingency @ Rs. 6546.46 Rs. 6546.46
Total Addition Component Amount (in Rs.): 8717.46
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 6546.47 Rs. 6546.47
2 Royalty @ Rs. 2072.9632875 Rs. 2072.9632875
3 Additional Royalty @ Rs. 3346.166055 Rs. 3346.166055
4 EMF @ Rs. 103.648164375 Rs. 103.648164375
5 DMF @ Rs. 207.29632875 Rs. 207.29632875
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 264.315 Rs. 264.315
7 Labour Cess @ Rs. 6546.47 Rs. 6546.47
8 Any Other Lumpsum Bill @ Rs. 13093 Rs. 13093
Total Deduction Component Amount (in Rs.): 32180.328835625
Total Net Amount (in Rs.): 631183.99380074