Final Dpr

State: Odisha District: Kendrapara Block: Rajkanika Gram Panchayat: Baradia
Work Code: OD/360/3441/119206/395617/00061773 (REPAIR AND RESTORATION OF DEULI PRIMARY SCHOOL)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Rajkanika Bill Status: Final Bill
Proposal Date: - Date of Commencement: 29-10-2025
Date of Completion: 14-11-2025 Scheme Name: Severe Cyclonic Storm DANA 2024
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Sujay Kumar Mandal
Administrative Approval Details
Approval No.: OD/360/3441/119206/395617/00061773/AS
Technical Sanction Details
Technical Sanction No.: OD/360/3441/119206/395617/00061773/TS
Fund Sanction No.: 5574
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. Sqm 85.9594 100.34838709677 8625.8871458061
2 Flooring (AR0816) : Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. Sqm 85.9594 1207.1336252114 103764.482143
3 miscellaneous (ARM122) : Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. Sqm 259.41 5.12 1328.1792
4 Painting (AR0917hk) : Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside)(For repair and maintenance). - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). Sqm 162.48 131.7325591754 21403.906214819
5 Painting (AR0918bk) : Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work . (Inside)(For repair and maintenance). - Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Inside)(For repair and maintenance). Sqm 96.93 218.9204610322 21219.960287851
Total Amount (in Rs.): 156342.41499147
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 612 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 85.9594 Square Meter 0.21505376344086 18.485892473118 - - - - - -
2 Flooring (AR0816) : Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 85.9594 Square Meter 0.216 18.5672304 0.55 47.27767 - - 0.216 18.5672304
4 Painting (AR0917hk) : Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside)(For repair and maintenance). - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 162.48 Square Meter 0.098698709677419 16.036566348387 - - - - 0.091558709677419 14.876459148387
5 Painting (AR0918bk) : Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work . (Inside)(For repair and maintenance). - Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Inside)(For repair and maintenance). 96.93 Square Meter 0.14231741935484 13.794827458065 - - 0.082258064516129 7.9732741935484 0.02244 2.1751092
Total Qty 66.88451667957 35.618798748387 47.27767 7.9732741935484
Rate Per Man Day 462 612 512 562
Total Amount 30900.646705961 21798.704834013 24206.16704 4480.9800967742
Total Labour Amount (in Rs.): 81386.498676748
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0027 BRM130 BRM340 BRM028 BRMM122 BRM255 BRM253 BRM143
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 85.9594 Sqm - - - - - - - - - - - - - - - -
2 Flooring (AR0816) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 85.9594 Sqm 1 85.9594 1 85.9594 0.2737 23.52708778 0.013 1.1174722 - - - - - - - -
3 miscellaneous(ARM122) :.Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. 259.41 Sqm - - - - - - - - 1 259.41 - - - - - -
4 Painting(AR0917hk) :.Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside)(For repair and maintenance). - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 162.48 Sqm - - - - - - - - - - 0.075 12.186 0.090322580645161 14.675612903226 - -
5 Painting(AR0918bk) :.Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work . (Inside)(For repair and maintenance). - Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Inside)(For repair and maintenance). 96.93 Sqm - - - - 0.10763440860215 10.433003225806 - - - - - - - - 0.25 24.2325
Total Qty 85.9594 85.9594 33.960091005806 1.1174722 259.41 12.186 14.675612903226 24.2325
Rate Per Unit 8.5 466.2266671 611.272 608.22 5.12 191.83567 159.51567 48.31567
Total Amount 730.6549 40076.564567916 20758.852749301 679.668941484 1328.1792 2337.70947462 2340.9902249187 1170.809473275
Total Material Amount (in Rs.): 69423.429531515
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM130 BRM340 BRM028 BRM255 BRM253 BRM143
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 85.9594 Sqm - - - - - - - - - - - -
2 Flooring (AR0816) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 85.9594 Sqm 1 85.9594 0.2737 23.52708778 0.013 1.1174722 - - - - - -
3 miscellaneous(ARM122) :.Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. 259.41 Sqm - - - - - - - - - - - -
4 Painting(AR0917hk) :.Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside)(For repair and maintenance). - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 162.48 Sqm - - - - - - 0.075 12.186 0.090322580645161 14.675612903226 - -
5 Painting(AR0918bk) :.Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work . (Inside)(For repair and maintenance). - Finishing wall with two coat water proofing cement paint including one coat cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Inside)(For repair and maintenance). 96.93 Sqm - - 0.10763440860215 10.433003225806 - - - - - - 0.25 24.2325
Total Qty 85.9594 33.960091005806 1.1174722 12.186 14.675612903226 24.2325
Rate Per Unit 0 0 235.25 0 0 0
Total Amount 0 0 262.88533505 0 0 0
Total Royalty Amount (in Rs.): 262.88533505
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for PH Work @ Rs. 10000 Rs. 10000
2 Display Citizen Board @ Rs. 1000 Rs. 1000
3 Any Other Lumpsum @ Rs. 25900 Rs. 25900
4 Contingency @ 1% Rs. 1563.4241499147
Total Addition Component Amount (in Rs.): 38463.424149915
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 1998.0583914138
2 Royalty @ Rs. 39.111527 Rs. 39.111527
3 Additional Royalty @ Rs. 217.907079 Rs. 217.907079
4 EMF @ Rs. 1.95557635 Rs. 1.95557635
5 DMF @ Rs. 3.9111527 Rs. 3.9111527
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 21 x 3.945) @ 272.205 Rs. 272.205
7 Labour Cess @ 1% Rs. 1998.0583914138
Total Deduction Component Amount (in Rs.): 4531.2071178777
Total Net Amount (in Rs.): 190274.63202351