Final Dpr

State: Odisha District: Dhenkanal Block: Odapada Gram Panchayat: Kotam
Work Code: OD/352/3355/117401/403337/00062389 (Construction of CC Road of Kottam Village)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Odapada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 02-12-2025
Date of Completion: 11-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Bibhuprasan Panda
Administrative Approval Details
Approval No.: OD/352/3355/117401/403337/00062389/AS
Technical Sanction Details
Technical Sanction No.: OD/352/3355/117401/403337/00062389/TS
Fund Sanction No.: 4423
Fund Sanction Amount (in Rs.): 250000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 20.271375 5878.24341586 119160.07662418
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 16.8928125 7331.60735382 123851.4683517
Total Amount (in Rs.): 243011.54497588
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled
Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.271375 Cubic Meter 3.9 79.0583625 0.18 3.6488475
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 16.8928125 Cubic Meter 4.6 77.7069375 0.68 11.4871125
Total Qty 15.13596 156.7653
Rate Per Man Day 562 462
Total Amount 8506.40952 72425.5686
Total Labour Amount (in Rs.): 80931.97812
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.271375 Cum 2.29 46.42144875 0.48 9.73026 0.96 19.46052 - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 16.8928125 Cum 3.23 54.563784375 0.45 7.601765625 - - 0.9 15.20353125
Total Qty 100.985233125 17.332025625 19.46052 15.20353125
Rate Per Unit 566.045 613.29 1297.3 1698.67
Total Amount 57162.186284241 10629.557995556 25246.132596 25825.782428437
Total Material Amount (in Rs.): 118863.65930423
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.271375 Cum 2.29 46.42144875 0.48 9.73026 0.96 19.46052 - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 16.8928125 Cum 3.23 54.563784375 0.45 7.601765625 - - 0.9 15.20353125
Total Qty 100.985233125 17.332025625 19.46052 15.20353125
Rate Per Unit 0 823.05 483.19 483.19
Total Amount 0 14265.123690656 9403.1286588 7346.1942646875
Total Royalty Amount (in Rs.): 31014.446614144
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 2000 Rs. 2000
2 Any Other Lumpsum @ Rs. 2488 Rs. 2488
3 Contingency @ Rs. 2500 Rs. 2500
Total Addition Component Amount (in Rs.): 6988
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2500 Rs. 2500
2 Royalty @ Rs. 5112.947559375 Rs. 5112.947559375
3 Additional Royalty @ Rs. 25134.556920862 Rs. 25134.556920862
4 EMF @ Rs. 255.64737796875 Rs. 255.64737796875
5 DMF @ Rs. 511.2947559375 Rs. 511.2947559375
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 110 x 3.945) @ 800.835 Rs. 800.835
7 Labour Cess @ Rs. 2500 Rs. 2500
Total Deduction Component Amount (in Rs.): 36815.281614143
Total Net Amount (in Rs.): 213184.26336174