Final Dpr

State: Odisha District: Jajpur Block: Bari Gram Panchayat: Bhanra
Work Code: OD/356/3395/118283/401914/00062992 (Repairing of CC road from Suchitra Jena house to Bikram Jena house)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bari Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-11-2025
Date of Completion: 06-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Rakesh Kumar Mallik
Administrative Approval Details
Approval No.: OD/356/3395/118283/401914/00062992/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3395/118283/401914/00062992/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 24.040184488 7820.63178992 188009.43104239
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 3.92515175 216.23489289764 848.75476826823
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 0.79092220416 6341.61245816 5015.7221033364
Total Amount (in Rs.): 193873.907914
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 24.040184488 Cubic Meter 4.6 110.5848486448 - - 0.68 16.34732545184
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 3.92515175 Square Meter - - 0.05 0.1962575875 0.05 0.1962575875
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.79092220416 Cubic Meter 3.9 3.084596596224 - - 0.18 0.1423659967488
Total Qty 113.66944524102 16.685949036089 0.1962575875
Rate Per Man Day 462 562 512
Total Amount 52515.283701353 9377.5033582819 100.4838848
Total Labour Amount (in Rs.): 61993.270944435
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 24.040184488 Cum 3.23 77.64979589624 0.45 10.8180830196 0.9 21.6361660392 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 3.92515175 Sqm - - - - - - 0.00267 0.0104801551725 0.126 0.4945691205 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.79092220416 Cum 2.29 1.8112118475264 0.48 0.3796426579968 - - - - - - 0.96 0.7592853159936
Total Qty 79.461007743766 11.197725677597 21.6361660392 0.0104801551725 0.4945691205 0.7592853159936
Rate Per Unit 577.612 938.79 2340.31 58573.086 229.106 1894.51
Total Amount 45897.631604892 10512.312888871 50635.3357432 613.85503021219 113.30875292127 1438.473624003
Total Material Amount (in Rs.): 109210.9176441
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 24.040184488 Cum 3.23 77.64979589624 0.45 10.8180830196 0.9 21.6361660392 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 3.92515175 Sqm - - - - - - 0.00267 0.0104801551725 0.000614 0.0024100431745 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.79092220416 Cum 2.29 1.8112118475264 0.48 0.3796426579968 - - - - - - 0.96 0.7592853159936
Total Qty 79.461007743766 11.197725677597 21.6361660392 0.0104801551725 0.0024100431745 0.7592853159936
Rate Per Unit 0 274.25 444.5 0 0 444.5
Total Amount 0 3070.9762670809 9617.2758044244 0 0 337.50232295916
Total Royalty Amount (in Rs.): 13025.754394464
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3000 Rs. 3000
2 Any Other Lumpsum @ Rs. 1119 Rs. 1119
3 Contingency @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 6119
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2000 Rs. 2000
2 Royalty @ Rs. 3303.3290748911 Rs. 3303.3290748911
3 Additional Royalty @ Rs. 9226.9259583398 Rs. 9226.9259583398
4 EMF @ Rs. 165.16645374455 Rs. 165.16645374455
5 DMF @ Rs. 330.33290748911 Rs. 330.33290748911
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 4 x 3.945) @ 631.2 Rs. 631.2
7 Labour Cess @ Rs. 2000 Rs. 2000
Total Deduction Component Amount (in Rs.): 17656.954394465
Total Net Amount (in Rs.): 182335.95351953