| State: Odisha |
District: Sundargarh |
Block: Lahunipara |
Gram Panchayat: Lahunipara |
Work Code: OD/373/3582/121669/384869/00063254 (REPAIR AND MAINTENANCE OF VETERINARY DISPENSARY LAHUNIPARA)
Project Category: Building
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Lahunipara |
Bill Status:
Final Bill
|
| Proposal Date: 22-09-2025 |
Date of Commencement: 21-11-2025 |
| Date of Completion: 26-11-2025 |
Scheme Name: Asset Management Fishery and Animal Resources Development Department |
| Scheme Component Name: Self/Personal Deposit |
Project Sub-Category: Veterinary Dispensary |
| Project Type: Repair and Maintenance |
Name of Executant: LALIT BISWAL |
Administrative Approval Details
Approval No.: OD/373/3582/121669/384869/00063254/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3582/121669/384869/00063254/TS
Fund Sanction No.: 4209
Fund Sanction Amount (in Rs.): 150000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
Cum |
8.25 |
240.77592 |
1986.40134 |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
7.1775 |
455.816232 |
3271.62100518 |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
7.8925 |
5976.74414662 |
47171.453177198 |
| 4 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
5.456 |
7437.71857194 |
40580.192528505 |
| 5 |
R.C.C. Work (AR0410f) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor in ground floor R.C.C. walls and fins including attached pilasters
|
Sqm |
10.01 |
934.29150984209 |
9352.2580135193 |
| 6 |
Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
Sqm |
185.535 |
156.85349521701 |
29101.813235088 |
| 7 |
Painting (AR0901d) : Fourth Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
Sqm |
185.535 |
79.152082155284 |
14685.481562681 |
Total Amount (in Rs.): 146149.22086217
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
Highly-Skilled
|
| Rs. 462 |
Rs. 562 |
Rs. 512 |
Rs. 612 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
8.25 |
Cubic Meter |
0.516 |
4.257 |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
7.1775 |
Cubic Meter |
0.1236 |
0.887139 |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
7.8925 |
Cubic Meter |
3.9 |
30.78075 |
- |
- |
0.18 |
1.42065 |
- |
- |
| 4 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
5.456 |
Cubic Meter |
4.6 |
25.0976 |
- |
- |
0.68 |
3.71008 |
- |
- |
| 5 |
R.C.C. Work (AR0410f) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor in ground floor R.C.C. walls and fins including attached pilasters
|
10.01 |
Square Meter |
- |
- |
0.56485355648536 |
5.6541841004184 |
0.56485355648536 |
5.6541841004184 |
- |
- |
| 6 |
Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
185.535 |
Square Meter |
0.11776344086022 |
21.84924 |
- |
- |
- |
- |
0.10776344086022 |
19.99389 |
| 7 |
Painting (AR0901d) : Fourth Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
185.535 |
Square Meter |
0.060511226344086 |
11.22695037975 |
- |
- |
- |
- |
0.060511226344086 |
11.22695037975 |
| Total Qty |
94.09867937975 |
10.784914100418 |
5.6541841004184 |
31.22084037975 |
| Rate Per Man Day |
462 |
562 |
512 |
612 |
| Total Amount |
43473.589873444 |
6061.1217244351 |
2894.9422594142 |
19107.154312407 |
Total Labour Amount (in Rs.): 71536.808169701
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM094 |
BRM104 |
BRM255 |
BRM252 |
BRM253 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
8.25 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
7.1775 |
Cum |
1 |
7.1775 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
7.8925 |
Cum |
- |
- |
2.29 |
18.073825 |
0.48 |
3.7884 |
0.96 |
7.5768 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
5.456 |
Cum |
- |
- |
3.23 |
17.62288 |
0.45 |
2.4552 |
- |
- |
0.9 |
4.9104 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0410f) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor in ground floor R.C.C. walls and fins including attached pilasters |
10.01 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.42175732217573 |
4.2217907949791 |
0.0051171548117155 |
0.051222719665272 |
- |
- |
- |
- |
- |
- |
| 6 |
Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
185.535 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
23.191875 |
0.084 |
15.58494 |
- |
- |
| 7 |
Painting(AR0901d) :.Fourth Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
185.535 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.084 |
15.58494 |
| Total Qty |
7.1775 |
35.696705 |
6.2436 |
7.5768 |
4.9104 |
4.2217907949791 |
0.051222719665272 |
23.191875 |
15.58494 |
15.58494 |
| Rate Per Unit |
347.95 |
576.347 |
352.89 |
2041.16 |
2442.53 |
240.106 |
58573.086 |
195.03787 |
125.74787 |
159.27787 |
| Total Amount |
2497.411125 |
20573.688836635 |
2203.304004 |
15465.461088 |
11993.799312 |
1013.6773006192 |
3000.2727641079 |
4523.2939013062 |
1959.7730090778 |
2482.3360472778 |
Total Material Amount (in Rs.): 65713.017388024
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM094 |
BRM104 |
BRM255 |
BRM252 |
BRM253 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
8.25 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
7.1775 |
Cum |
1 |
7.1775 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
7.8925 |
Cum |
- |
- |
2.29 |
18.073825 |
0.48 |
3.7884 |
0.96 |
7.5768 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
5.456 |
Cum |
- |
- |
3.23 |
17.62288 |
0.45 |
2.4552 |
- |
- |
0.9 |
4.9104 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0410f) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor in ground floor R.C.C. walls and fins including attached pilasters |
10.01 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.0051799163179916 |
0.051850962343096 |
0.0051171548117155 |
0.051222719665272 |
- |
- |
- |
- |
- |
- |
| 6 |
Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
185.535 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
23.191875 |
0.084 |
15.58494 |
- |
- |
| 7 |
Painting(AR0901d) :.Fourth Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
185.535 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.084 |
15.58494 |
| Total Qty |
7.1775 |
35.696705 |
6.2436 |
7.5768 |
4.9104 |
0.051850962343096 |
0.051222719665272 |
23.191875 |
15.58494 |
15.58494 |
| Rate Per Unit |
46.25 |
0 |
46.25 |
329.5 |
329.5 |
0 |
0 |
0 |
0 |
0 |
| Total Amount |
331.959375 |
0 |
288.7665 |
2496.5556 |
1617.9768 |
0 |
0 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 4735.258275
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Display Citizen Board @
Rs. 2000
|
Rs. 2000 |
| 2 |
Contingency @
Rs. 1850
|
Rs. 1850 |
Total Addition Component Amount (in Rs.): 3850
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| 1 |
Royalty @
Rs. 2093.0745
|
Rs. 2093.0745 |
| 2 |
Additional Royalty @
Rs. 2328.2226
|
Rs. 2328.2226 |
| 3 |
EMF @
Rs. 104.653725
|
Rs. 104.653725 |
| 4 |
DMF @
Rs. 209.30745
|
Rs. 209.30745 |
| 5 |
Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 287.985
|
Rs. 287.985 |
| 6 |
Labour Cess @
1%
|
Rs. 1499.9922086217 |
Total Deduction Component Amount (in Rs.): 6523.2354836217
Total Net Amount (in Rs.): 143475.98537855