Final Dpr

State: Odisha District: Jagatsinghpur Block: Balikuda Gram Panchayat: Ambasala
Work Code: OD/355/3386/118044/398353/00064282 (Repair and maintenance of AWC building at Ambasala-A)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Balikuda Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-11-2025
Date of Completion: 14-11-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: MATRU PRASAD NAYAK
Administrative Approval Details
Approval No.: OD/355/3386/118044/398353/00064282/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3386/118044/398353/00064282/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0918gk) : Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). Sqm 104.382 159.28472551378 16626.458218579
2 Other Building Items. (AR1901B) : Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) Sqm 27.815 1011.4768163238 28134.227646046
Total Amount (in Rs.): 44760.685864626
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled
Rs. 462 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0918gk) : Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 104.382 Square Meter 0.12011870967742 12.538231153548 0.10991870967742 11.473534753548
2 Other Building Items. (AR1901B) : Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 27.815 Square Meter 0.216 6.00804 0.216 6.00804
Total Qty 18.546271153548 17.481574753548
Rate Per Man Day 462 612
Total Amount 8568.3772729394 10698.723749172
Total Labour Amount (in Rs.): 19267.101022111
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM255 BRM252 BRM174 BRM340 BRM028 BRM131
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0918gk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 104.382 Sqm 0.125 13.04775 0.084 8.768088 - - - - - - - -
2 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 27.815 Sqm - - - - 0.0076 0.211394 0.1074 2.987331 0.021 0.584115 1 27.815
Total Qty 13.04775 8.768088 0.211394 2.987331 0.584115 27.815
Rate Per Unit 195.03787 125.74787 2041.967 613.327 608.12 662.3175001
Total Amount 2544.8053682925 1102.5683899726 431.659571998 1832.210760237 355.2120138 18422.361265282
Total Material Amount (in Rs.): 24688.817369582
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM255 BRM252 BRM174 BRM340 BRM028 BRM131
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0918gk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 104.382 Sqm 0.125 13.04775 0.084 8.768088 - - - - - - - -
2 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 27.815 Sqm - - - - 0.0076 0.211394 0.1074 2.987331 0.021 0.584115 1 27.815
Total Qty 13.04775 8.768088 0.211394 2.987331 0.584115 27.815
Rate Per Unit 0 0 0 0 77.25 0
Total Amount 0 0 0 0 45.12288375 0
Total Royalty Amount (in Rs.): 45.12288375
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 39 Rs. 39
2 Contingency @ Rs. 200 Rs. 200
Total Addition Component Amount (in Rs.): 239
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 200 Rs. 200
2 Royalty @ Rs. 20.444025 Rs. 20.444025
3 Additional Royalty @ Rs. 21.612255 Rs. 21.612255
4 EMF @ Rs. 1.02220125 Rs. 1.02220125
5 DMF @ Rs. 2.0444025 Rs. 2.0444025
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 6 x 3.945) @ 23.67 Rs. 23.67
7 Labour Cess @ Rs. 50 Rs. 50
8 Any Other Lumpsum Bill @ Rs. 1000 Rs. 1000
Total Deduction Component Amount (in Rs.): 1318.79288375
Total Net Amount (in Rs.): 43680.892980876