Final Dpr

State: Odisha District: Cuttack Block: Cuttacksadar Gram Panchayat: Jasapada
Work Code: OD/350/3337/116961/399948/00064484 (Construction of CC road Kosida Sahara Sahi Gada ,Jasapada GP.)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Cuttacksadar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 15-11-2025
Date of Completion: 19-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Samata Debata
Administrative Approval Details
Approval No.: OD/350/3337/116961/399948/00064484/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3337/116961/399948/00064484/TS
Fund Sanction No.: 22117
Fund Sanction Amount (in Rs.): 137000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 1.0692 588.227232 628.9325564544
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 3.332 6060.21693386 20192.642823622
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 13.908 7524.48725582 104650.56875394
4 R.C.C. Work (AR0410d) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm Sqm 9.12 1047.3822930467 9552.1265125859
Total Amount (in Rs.): 135024.27064661
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.0692 Cubic Meter 0.1236 0.13215312 - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.332 Cubic Meter 3.9 12.9948 - - 0.18 0.59976
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.908 Cubic Meter 4.6 63.9768 - - 0.68 9.45744
4 R.C.C. Work (AR0410d) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 9.12 Square Meter - - 0.6547619047619 5.9714285714286 0.6547619047619 5.9714285714286
Total Qty 77.10375312 16.028628571429 5.9714285714286
Rate Per Man Day 462 562 512
Total Amount 35621.93394144 9008.0892571429 3057.3714285714
Total Labour Amount (in Rs.): 47687.394627154
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM084 BRM104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.0692 Cum 1 1.0692 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.332 Cum - - 2.29 7.63028 0.48 1.59936 0.96 3.19872 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.908 Cum - - 3.23 44.92284 0.45 6.2586 - - 0.9 12.5172 - - - -
4 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 9.12 Sqm - - - - - - - - - - 0.55238095238095 5.0377142857143 0.0051904761904762 0.047337142857143
Total Qty 1.0692 52.55312 7.85796 3.19872 12.5172 5.0377142857143 0.047337142857143
Rate Per Unit 413.05 563.767 417.99 2167.11 2595.71 250.166 58573.086
Total Amount 441.63306 29627.71480304 3284.5487004 6931.9780992 32491.021212 1260.264832 2772.6825395657
Total Material Amount (in Rs.): 76809.843246206
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM084 BRM104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.0692 Cum 1 1.0692 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.332 Cum - - 2.29 7.63028 0.48 1.59936 0.96 3.19872 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.908 Cum - - 3.23 44.92284 0.45 6.2586 - - 0.9 12.5172 - - - -
4 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 9.12 Sqm - - - - - - - - - - 0.0056666666666667 0.05168 0.0051904761904762 0.047337142857143
Total Qty 1.0692 52.55312 7.85796 3.19872 12.5172 0.05168 0.047337142857143
Rate Per Unit 112.25 0 112.25 259.5 259.5 0 0
Total Amount 120.0177 0 882.05601 830.06784 3248.2134 0 0
Total Royalty Amount (in Rs.): 5080.35495
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 550 Rs. 550
2 Contingency @ Rs. 1370 Rs. 1370
Total Addition Component Amount (in Rs.): 1920
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1370 Rs. 1370
2 Royalty @ Rs. 2355.5202 Rs. 2355.5202
3 Additional Royalty @ Rs. 2371.50672 Rs. 2371.50672
4 EMF @ Rs. 117.77601 Rs. 117.77601
5 DMF @ Rs. 235.55202 Rs. 235.55202
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 418.17 Rs. 418.17
7 Labour Cess @ 1% Rs. 1369.4427064661
8 Any Other Lumpsum Bill @ 5% Rs. 6847.2135323305
Total Deduction Component Amount (in Rs.): 15085.181188797
Total Net Amount (in Rs.): 121859.08945781