Final Dpr

State: Odisha District: Kendrapara Block: Derabish Gram Panchayat: Chhoti
Work Code: OD/360/3435/119057/396558/00064689 (Completion of incomplete community center near pathagara)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Derabish Bill Status: Final Bill
Proposal Date: - Date of Commencement: 17-11-2025
Date of Completion: 09-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Community Centre
Project Type: Completion Name of Executant: HIMANSU PATI
Administrative Approval Details
Approval No.: OD/360/3435/119057/396558/00064689/AS
Technical Sanction Details
Technical Sanction No.: OD/360/3435/119057/396558/00064689/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) Cum 1.956125 14741.40393965 28836.028781448
2 R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) Cum 7.5768 12774.50171672 96789.844607244
3 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. Qntl 10.5 9098.816391 95537.5721055
4 Iron Work (AR1704) : Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. Qntl 4.5 16409.703127087 73843.664071892
Total Amount (in Rs.): 295007.10956608
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 512 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 1.956125 Cubic Meter 1.3333 2.6081014625 5.29605 10.35973580625 5.33875 10.44326234375 - -
2 R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 7.5768 Cubic Meter 1.3333 10.10214744 3.11255 23.58316884 3.15525 23.9066982 - -
3 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 10.5 Quintal 0.8 8.4 0.044 0.462 - - 0.3 3.15
4 Iron Work (AR1704) : Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 4.5 Quintal 6.3976377952756 28.78937007874 1.9685039370079 8.8582677165354 3.9370078740157 17.716535433071 3.4448818897638 15.501968503937
Total Qty 49.89961898124 52.066495976821 43.263172362785 18.651968503937
Rate Per Man Day 462 562 512 612
Total Amount 23053.623969333 29261.370738973 22150.744249746 11415.004724409
Total Labour Amount (in Rs.): 85880.743682462
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM162 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 1.956125 Cum 3.4733 6.7942089625 0.45 0.88025625 0.36 0.704205 0.54 1.0563075 4.4196 8.64529005 0.041529 0.081235915125 - - - -
2 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 7.5768 Cum 3.4733 26.31649944 0.45 3.40956 0.36 2.727648 0.54 4.091472 6.2216 47.13981888 0.0502172 0.38048568096 - - - -
3 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 10.5 Qntl - - - - - - - - - - - - 0.8 8.4 1.05 11.025
4 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 4.5 Qntl - - - - - - - - - - - - - - 1 4.5
Total Qty 33.1107084025 4.28981625 3.431853 5.1477795 55.78510893 0.461721596085 8.4 15.525
Rate Per Unit 611.272 543.12 2270.02 2244.2 250.166 58573.086 90.1 6754.622
Total Amount 20239.648946613 2329.8850017 7790.37494706 11552.6467539 13955.537560582 27044.458755544 756.84 104865.50655
Total Material Amount (in Rs.): 188534.8985154
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 1.956125 Cum 3.4733 6.7942089625 0.45 0.88025625 0.36 0.704205 0.54 1.0563075 0.045339 0.088688751375 0.041529 0.081235915125 - -
2 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 7.5768 Cum 3.4733 26.31649944 0.45 3.40956 0.36 2.727648 0.54 4.091472 0.076659 0.5808299112 0.0502172 0.38048568096 - -
3 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 10.5 Qntl - - - - - - - - - - - - 1.05 11.025
4 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 4.5 Qntl - - - - - - - - - - - - 1 4.5
Total Qty 33.1107084025 4.28981625 3.431853 5.1477795 0.669518662575 0.461721596085 15.525
Rate Per Unit 0 145.25 444.5 444.5 0 0 0
Total Amount 0 623.0958103125 1525.4586585 2288.18798775 0 0 0
Total Royalty Amount (in Rs.): 4436.7424565625
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1991 Rs. 1991
2 Contingency @ Rs. 3000 Rs. 3000
Total Addition Component Amount (in Rs.): 4991
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 3000 Rs. 3000
2 Royalty @ Rs. 1265.49579375 Rs. 1265.49579375
3 Additional Royalty @ Rs. 2981.42229375 Rs. 2981.42229375
4 EMF @ Rs. 63.2747896875 Rs. 63.2747896875
5 DMF @ Rs. 126.549579375 Rs. 126.549579375
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 264.315 Rs. 264.315
7 Labour Cess @ Rs. 3000 Rs. 3000
Total Deduction Component Amount (in Rs.): 10701.057456562
Total Net Amount (in Rs.): 289297.05210952