Final Dpr

State: Odisha District: Jagatsinghpur Block: Erasama Gram Panchayat: Nuadihi
Work Code: OD/355/3388/118109/397334/00064987 (Improvement of road from 13th C Canal Mahimadeipur Chhak to Madhuaganda Bridge)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Erasama Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 20-11-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Susanta Kumar Nanda
Administrative Approval Details
Approval No.: OD/355/3388/118109/397334/00064987/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3388/118109/397334/00064987/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 137025
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 10.4237166 216.23489289764 2253.9712425964
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 15.1636464 8206.60639466 124442.0775126
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 1.0831176 6745.97242418 7306.681461744
Total Amount (in Rs.): 134002.73021694
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
Rs. 512 Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 10.4237166 Square Meter - - 0.05 0.52118583 0.05 0.52118583
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.1636464 Cubic Meter 4.6 69.75277344 - - 0.68 10.311279552
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.0831176 Cubic Meter 3.9 4.22415864 - - 0.18 0.194961168
Total Qty 0.52118583 11.02742655 73.97693208
Rate Per Man Day 512 562 462
Total Amount 266.84714496 6197.4137211 34177.34262096
Total Labour Amount (in Rs.): 40641.60348702
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 10.4237166 Sqm 0.00267 0.027831323322 0.126 1.3133882916 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.1636464 Cum - - - - 3.23 48.978577872 0.45 6.82364088 0.9 13.64728176 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.0831176 Cum - - - - 2.29 2.480339304 0.48 0.519896448 - - 0.96 1.039792896
Total Qty 0.027831323322 1.3133882916 51.458917176 7.343537328 13.64728176 1.039792896
Rate Per Unit 58573.086 229.106 613.327 790.4 2948.53 2547.16
Total Amount 1630.1664944333 300.90513793531 31561.143294805 5804.3319040512 40239.419687813 2648.5188729754
Total Material Amount (in Rs.): 82184.485392013
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 10.4237166 Sqm 0.00267 0.027831323322 0.000614 0.0064001619924 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.1636464 Cum - - - - 3.23 48.978577872 0.45 6.82364088 0.9 13.64728176 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.0831176 Cum - - - - 2.29 2.480339304 0.48 0.519896448 - - 0.96 1.039792896
Total Qty 0.027831323322 0.0064001619924 51.458917176 7.343537328 13.64728176 1.039792896
Rate Per Unit 0 0 0 75.25 279.5 279.5
Total Amount 0 0 0 552.601183932 3814.41525192 290.622114432
Total Royalty Amount (in Rs.): 4657.638550284
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1500 Rs. 1500
2 Any Other Lumpsum @ Rs. 150 Rs. 150
3 Contingency @ Rs. 1370 Rs. 1370
Total Addition Component Amount (in Rs.): 3020
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1370 Rs. 1370
2 Royalty @ Rs. 2166.34351176 Rs. 2166.34351176
3 Additional Royalty @ Rs. 2166.34351176 Rs. 2166.34351176
4 EMF @ Rs. 108.317175588 Rs. 108.317175588
5 DMF @ Rs. 216.634351176 Rs. 216.634351176
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 5 x 3.945) @ 406.335 Rs. 406.335
7 Labour Cess @ Rs. 1370 Rs. 1370
8 Any Other Lumpsum Bill @ Rs. 2740 Rs. 2740
Total Deduction Component Amount (in Rs.): 10543.973550284
Total Net Amount (in Rs.): 126478.75666666