Final Dpr

State: Odisha District: Gajapati Block: Kasinagar Gram Panchayat: Hadubhangi
Work Code: OD/353/3359/117480/414556/00065228 (Improvement of road from PWD road to Kumuti Sahi to Hadubhangi village in convergence with MGNREGA)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Kasinagar Bill Status: Final Bill
Proposal Date: 12-03-2024 Date of Commencement: 04-12-2025
Date of Completion: 22-12-2025 Scheme Name: Kandhamal O Gajapati Bikas Yojana
Scheme Component Name: Self/Personal Deposit Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Rabindranath Gouda
Administrative Approval Details
Approval No.: OD/353/3359/117480/414556/00065228/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3359/117480/414556/00065228/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 400000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 171.3856 216.55039071844 37113.618643514
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 53.319184 5844.18594922 311607.22595668
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 5.268 792.489632 4174.835381376
4 Earth Work (AR0103a) : Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department Cum 127.749 312.915372 39974.625857628
Total Amount (in Rs.): 392870.30583919
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
Rs. 512 Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 171.3856 Square Meter - - 0.05 8.56928 0.05 8.56928
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 53.319184 Cubic Meter 3.9 207.9448176 - - 0.18 9.59745312
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.268 Cubic Meter 0.1236 0.6511248 - - - -
4 Earth Work (AR0103a) : Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 127.749 Cubic Meter 0.6706 85.6684794 - - - -
Total Qty 8.56928 18.16673312 294.2644218
Rate Per Man Day 512 562 462
Total Amount 4387.47136 10209.70401344 135950.1628716
Total Labour Amount (in Rs.): 150547.33824504
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM044 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 171.3856 Sqm 0.00267 0.457599552 0.126 21.5945856 - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 53.319184 Cum - - - - 2.29 122.10093136 0.48 25.59320832 0.96 51.18641664 - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.268 Cum - - - - - - - - - - 1 5.268
4 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 127.749 Cum - - - - - - - - - - - -
Total Qty 0.457599552 21.5945856 122.10093136 25.59320832 51.18641664 5.268
Rate Per Unit 58668.206 324.226 594.647 417.99 1596.76 413.05
Total Amount 26846.544782244 7001.5261107456 72606.95253043 10697.705145677 81732.422634086 2175.9474
Total Material Amount (in Rs.): 201061.09860318
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM044 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 171.3856 Sqm 0.00267 0.457599552 0.000614 0.1052307584 - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 53.319184 Cum - - - - 2.29 122.10093136 0.48 25.59320832 0.96 51.18641664 - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.268 Cum - - - - - - - - - - 1 5.268
4 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 127.749 Cum - - - - - - - - - - - -
Total Qty 0.457599552 0.1052307584 122.10093136 25.59320832 51.18641664 5.268
Rate Per Unit 0 0 0 314.5 419 314.49
Total Amount 0 0 0 8049.06401664 21447.10857216 1656.73332
Total Royalty Amount (in Rs.): 31152.9059088
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3000 Rs. 3000
2 Contingency @ 1% Rs. 3928.7030583919
Total Addition Component Amount (in Rs.): 6928.7030583919
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 3997.9900889758
2 Royalty @ Rs. 7734.3764544 Rs. 7734.3764544
3 Additional Royalty @ Rs. 22258.37298624 Rs. 22258.37298624
4 EMF @ Rs. 386.71882272 Rs. 386.71882272
5 DMF @ Rs. 773.43764544 Rs. 773.43764544
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 966.525 Rs. 966.525
7 Labour Cess @ 1% Rs. 3997.9900889758
Total Deduction Component Amount (in Rs.): 40115.411086752
Total Net Amount (in Rs.): 359683.59781083