Final Dpr

State: Odisha District: Koraput Block: Boipariguda Gram Panchayat: P Endapada
Work Code: OD/363/3467/275137/429235/00065845 (Repair & Maintenance of AWC building at Pendapada)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Boipariguda Bill Status: Final Bill
Proposal Date: - Date of Commencement: 11-12-2025
Date of Completion: 07-01-2026 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: Debabrat Sarkar
Administrative Approval Details
Approval No.: OD/363/3467/275137/429235/00065845/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3467/275137/429235/00065845/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Roofing (AR1132) : Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge Sqm 33.22 522.15164641032 17345.877693751
2 Masonry Brick Work (AR0602i) : K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immerging the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 1.9436 5886.1929885 11440.404692449
3 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. Sqm 50.7916 172.224613796 8747.5636940809
4 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 41.7916 70.10795767871 2929.9237241256
5 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 41.7916 61.24577784 2559.5590491781
Total Amount (in Rs.): 43023.328853584
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Skilled
Rs. 462 Rs. 612 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Roofing (AR1132) : Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 33.22 Square Meter 0.21505376344086 7.1440860215054 - - 0.16129032258065 5.358064516129
2 Masonry Brick Work (AR0602i) : K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immerging the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 1.9436 Cubic Meter 2.96 5.753056 1.05 2.04078 0.35 0.68026
3 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 50.7916 Square Meter 0.12 6.094992 0.14 7.110824 - -
4 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 41.7916 Square Meter 0.053763440860215 2.2468602150538 - - 0.053763440860215 2.2468602150538
5 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 41.7916 Square Meter 0.043 1.7970388 - - 0.036 1.5044976
Total Qty 23.036033036559 9.7896823311828 9.151604
Rate Per Man Day 462 612 562
Total Amount 10642.64726289 5991.2855866839 5143.201448
Total Labour Amount (in Rs.): 21777.134297574
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM149 BRM003 BRMMR0025 BRM340 BRM028 BRM138 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Roofing (AR1132) :.Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 33.22 Sqm 1 33.22 - - - - - - - - - - - -
2 Masonry Brick Work (AR0602i) :.K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immerging the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 1.9436 Cum - - 350 680.26 1 1.9436 1 1.9436 0.28 0.544208 - - - -
3 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 50.7916 Sqm - - - - - - 0.0358 1.81833928 0.015 0.761874 - - - -
4 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 41.7916 Sqm - - - - - - - - - - 0.075 3.13437 - -
5 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 41.7916 Sqm - - - - - - - - - - - - 0.075 3.13437
Total Qty 33.22 680.26 1.9436 3.76193928 1.306082 3.13437 3.13437
Rate Per Unit 318.917312 7.706145 33 602.012 677.37 155.62512 249.88512
Total Amount 10594.43310464 5242.1821977 64.1388 2264.7325898314 884.70076434 487.7867073744 783.2324235744
Total Material Amount (in Rs.): 20321.20658746
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM149 BRM003 BRM340 BRM028 BRM138 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Roofing (AR1132) :.Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 33.22 Sqm 1 33.22 - - - - - - - - - -
2 Masonry Brick Work (AR0602i) :.K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immerging the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 1.9436 Cum - - 350 680.26 1 1.9436 0.28 0.544208 - - - -
3 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 50.7916 Sqm - - - - 0.0358 1.81833928 0.015 0.761874 - - - -
4 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 41.7916 Sqm - - - - - - - - 0.075 3.13437 - -
5 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 41.7916 Sqm - - - - - - - - - - 0.075 3.13437
Total Qty 33.22 680.26 3.76193928 1.306082 3.13437 3.13437
Rate Per Unit 0 0.04025 0 77.25 0 0
Total Amount 0 27.380465 0 100.8948345 0 0
Total Royalty Amount (in Rs.): 128.2752995
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1000 Rs. 1000
2 Any Other Lumpsum @ Rs. 546 Rs. 546
3 Contingency @ Rs. 430 Rs. 430
Total Addition Component Amount (in Rs.): 1976
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 430 Rs. 430
2 Royalty @ Rs. 69.52197 Rs. 70
3 Additional Royalty @ Rs. 48.325034 Rs. 48
4 EMF @ Rs. 3.4760985 Rs. 3
5 DMF @ Rs. 6.952197 Rs. 7
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 31.56 Rs. 31.56
7 Labour Cess @ Rs. 430 Rs. 430
Total Deduction Component Amount (in Rs.): 1019.56
Total Net Amount (in Rs.): 43979.768853584