Final Dpr

State: Odisha District: Bargarh Block: Bhatli Gram Panchayat: Kelendapali
Work Code: OD/347/3314/116425/380680/00066293 (IMP OF ROAD WITH GR-II METAL FROM KENDUGUDIA TO RD ROAD)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhatli Bill Status: Final Bill
Proposal Date: - Date of Commencement: 03-12-2025
Date of Completion: 24-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: Mettalling Road
Project Type: Repair and Maintenance Name of Executant: Krushna Chandra Kisan
Administrative Approval Details
Approval No.: OD/347/3314/116425/380680/00066293/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3314/116425/380680/00066293/TS
Fund Sanction No.: 9114
Fund Sanction Amount (in Rs.): 457216
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Road Work (AR1341a) : Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam - Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). Cum 113.4 2737.2960971111 310409.3774124
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. Cum 113.4 1241.8853504244 140829.79873813
Total Amount (in Rs.): 451239.17615053
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Road Work (AR1341a) : Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam - Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 113.4 Cubic Meter 0.69444444444444 78.75 0.028 3.1752 0.0055555555555556 0.63
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 113.4 Cubic Meter 1.1333922261484 128.52667844523 - - - -
Total Qty 207.27667844523 0.63 3.1752
Rate Per Man Day 462 562 512
Total Amount 95761.825441696 354.06 1625.7024
Total Labour Amount (in Rs.): 97741.587841696
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0037 BRM025 BRM075 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1341a) :.Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam - Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 113.4 Cum 0.4 45.36 0.3 34.02 1.21 137.214 - -
2 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 113.4 Cum - - 0.89578798586572 101.58235759717 - - 0.384 43.5456
Total Qty 45.36 135.60235759717 137.214 43.5456
Rate Per Unit 10 338.09 1524.76 531.61
Total Amount 453.6 45845.801080028 209218.41864 23149.276416
Total Material Amount (in Rs.): 278667.09613603
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM075 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1341a) :.Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam - Providing, laying, spreading and compacting Grading-I stone aggregates of specific sizes using moorum or gravel to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 113.4 Cum 0.3 34.02 1.21 137.214 - -
2 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 113.4 Cum 0.89578798586572 101.58235759717 - - 0.384 43.5456
Total Qty 135.60235759717 137.214 43.5456
Rate Per Unit 140.25 249.5 165.25
Total Amount 19018.230653004 34234.893 7195.9104
Total Royalty Amount (in Rs.): 60449.034053004
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3000 Rs. 3000
2 Contingency @ Rs. 2976 Rs. 2976
Total Addition Component Amount (in Rs.): 5976
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 0.5% Rs. 2286
2 Royalty @ Rs. 24107.998515901 Rs. 24108
3 Additional Royalty @ Rs. 32724.835759717 Rs. 32725
4 EMF @ Rs. 1205.3999257951 Rs. 1205
5 DMF @ Rs. 2410.7998515901 Rs. 2411
6 Labour Cess @ 1% Rs. 4572
Total Deduction Component Amount (in Rs.): 67307
Total Net Amount (in Rs.): 389908.17615053