Final Dpr

State: Odisha District: Jajpur Block: Rasulpur Gram Panchayat: Rahamba
Work Code: OD/356/3402/118484/401550/00066539 (Construction of CC Road from RD road to Chamara Sahi Culvert)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Rasulpur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 29-11-2025
Date of Completion: 01-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SUSHIL HEMBRAM
Administrative Approval Details
Approval No.: OD/356/3402/118484/401550/00066539/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3402/118484/401550/00066539/TS
Fund Sanction No.: 8053
Fund Sanction Amount (in Rs.): 400000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 22.53875 216.23489289764 4873.6641922967
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 52.267 7374.67583442 385452.18183763
Total Amount (in Rs.): 390325.84602993
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
Rs. 512 Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 22.53875 Square Meter - - 0.05 1.1269375 0.05 1.1269375
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 52.267 Cubic Meter 4.6 240.4282 - - 0.68 35.54156
Total Qty 1.1269375 36.6684975 240.4282
Rate Per Man Day 512 562 462
Total Amount 576.992 20607.695595 111077.8284
Total Labour Amount (in Rs.): 132262.515995
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 22.53875 Sqm 0.00267 0.0601784625 0.126 2.8398825 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 52.267 Cum - - - - 3.23 168.82241 0.45 23.52015 0.9 47.0403
Total Qty 0.0601784625 2.8398825 168.82241 23.52015 47.0403
Rate Per Unit 58573.086 229.106 568.667 417.99 2144.15
Total Amount 3524.8382593603 650.634120045 96003.73342747 9831.1874985 100861.459245
Total Material Amount (in Rs.): 210871.85255038
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 22.53875 Sqm 0.00267 0.0601784625 0.000614 0.0138387925 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 52.267 Cum - - - - 3.23 168.82241 0.45 23.52015 0.9 47.0403
Total Qty 0.0601784625 0.0138387925 168.82241 23.52015 47.0403
Rate Per Unit 0 0 0 274.25 444.5
Total Amount 0 0 0 6450.4011375 20909.41335
Total Royalty Amount (in Rs.): 27359.8144875
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 5000 Rs. 5000
2 Any Other Lumpsum @ Rs. 769 Rs. 769
3 Contingency @ 1% Rs. 3903.2584602993
Total Addition Component Amount (in Rs.): 9672.2584602993
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 3999.9810449023
2 Royalty @ Rs. 6938.44425 Rs. 6938.44425
3 Additional Royalty @ Rs. 19380.6036 Rs. 19380.6036
4 EMF @ Rs. 346.9222125 Rs. 346.9222125
5 DMF @ Rs. 693.844425 Rs. 693.844425
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 338 x 3.945) @ 1333.41 Rs. 1333.41
7 Labour Cess @ 1% Rs. 3999.9810449023
Total Deduction Component Amount (in Rs.): 36693.186577305
Total Net Amount (in Rs.): 363304.91791292