Final Dpr

State: Odisha District: Puri Block: Kakat Pur Gram Panchayat: Jaleswarpada
Work Code: OD/369/3540/120957/409171/00068055 (CONSTRUCTION AND REPAIR OF CHHELIBERUAN UP SCHOOL AT CHHELIBERUAN)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kakat Pur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 11-12-2025
Date of Completion: 22-12-2025 Scheme Name: Bikashita Gaon Bikashita Odisha
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) Project Sub-Category: Elementary School
Project Type: Upgradation or Improvement Name of Executant: PRACHI PRANGYA SAHOO AE
Administrative Approval Details
Approval No.: OD/369/3540/120957/409171/00068055/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3540/120957/409171/00068055/TS
Fund Sanction No.: 6151
Fund Sanction Amount (in Rs.): 300000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 591.3268 160.71529806685 95035.262916917
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 11.96985 7664.61131878 91744.247794099
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 7.9799 438.201832 3496.8067991768
4 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 15.9598 6182.58046194 98672.74765647
Total Amount (in Rs.): 288949.06516666
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Skilled
Rs. 462 Rs. 612 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 591.3268 Square Meter 0.11776344086022 69.63667864086 - - 0.10776344086022 63.72341064086
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.96985 Cubic Meter 4.6 55.06131 0.68 8.139498 - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.9799 Cubic Meter 0.1236 0.98631564 - - - -
4 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.9598 Cubic Meter 3.9 62.24322 0.18 2.872764 - -
Total Qty 187.92752428086 63.72341064086 11.012262
Rate Per Man Day 462 612 562
Total Amount 86822.516217757 38998.727312206 6188.891244
Total Labour Amount (in Rs.): 132010.13477396
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM255 BRM253 BRM340 BRM028 BRM056 BRM029 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 591.3268 Sqm 0.125 73.91585 0.090322580645161 53.410162580645 - - - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.96985 Cum - - - - 3.23 38.6626155 0.45 5.3864325 0.9 10.772865 - - - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.9799 Cum - - - - - - - - - - 1 7.9799 - -
4 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.9598 Cum - - - - 2.29 36.547942 0.48 7.660704 - - - - 0.96 15.321408
Total Qty 73.91585 53.410162580645 75.2105575 13.0471365 10.772865 7.9799 15.321408
Rate Per Unit 195.03787 159.27787 595.407 780.67 2580.53 336.51 2168.91
Total Amount 14416.38994324 8507.0569321989 44780.892409402 10185.508051455 27799.70131845 2685.316149 33230.75502528
Total Material Amount (in Rs.): 141605.61982903
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM255 BRM253 BRM340 BRM028 BRM056 BRM029 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 591.3268 Sqm 0.125 73.91585 0.090322580645161 53.410162580645 - - - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.96985 Cum - - - - 3.23 38.6626155 0.45 5.3864325 0.9 10.772865 - - - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.9799 Cum - - - - - - - - - - 1 7.9799 - -
4 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.9598 Cum - - - - 2.29 36.547942 0.48 7.660704 - - - - 0.96 15.321408
Total Qty 73.91585 53.410162580645 75.2105575 13.0471365 10.772865 7.9799 15.321408
Rate Per Unit 0 0 0 40.25 149.5 40.25 149.5
Total Amount 0 0 0 525.147244125 1610.5433175 321.190975 2290.550496
Total Royalty Amount (in Rs.): 4747.432032625
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 5000 Rs. 5000
2 Any Other Lumpsum @ Rs. 3050.93 Rs. 3051
3 Contingency @ Rs. 2995 Rs. 2995
Total Addition Component Amount (in Rs.): 11046
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2995 Rs. 2995
2 Royalty @ Rs. 4128.2017675 Rs. 4128
3 EMF @ Rs. 206.410088375 Rs. 206
4 DMF @ Rs. 412.82017675 Rs. 413
5 Empty Gunny Bag (Cement x Gunny Bag Rate : 74 x 3.92) @ 595.84 Rs. 595.84
6 Labour Cess @ Rs. 3000 Rs. 3000
7 Any Other Lumpsum Bill @ Rs. 4817 Rs. 4817
Total Deduction Component Amount (in Rs.): 16154.84
Total Net Amount (in Rs.): 283840.22516666