Final Dpr

State: Odisha District: Ganjam Block: Polosara Gram Panchayat: Balichai
Work Code: OD/354/3380/117898/411379/00068312 (Completion of AWC-3 at ANM Center Site at Balichai)
Project Category: Building
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Polosara Bill Status: Final Bill
Proposal Date: 18-06-2021 Date of Commencement: 15-12-2025
Date of Completion: 17-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: AWC
Project Type: Completion Name of Executant: Sarat Kumar Malla
Administrative Approval Details
Approval No.: OD/354/3380/117898/411379/00068312/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3380/117898/411379/00068312/TS
Fund Sanction No.: 7726
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410d) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm Sqm 26.9044765425 1047.9038224181 28193.303809044
2 R.C.C. Work (AR0410a) : Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height Sqm 43.5158209418 663.29946175911 28864.020608702
3 R.C.C. Work (AR0402a) : Reinforced cement concrete (1:11/2:3) work with 12mm size black hard hand broken granite chips - 'Reinforced cement concrete (1:1.5:3) work with 12mm size black hard hand broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (To be used for minor repair work only) Cum 8.6419935732 7190.21660542 62137.805693956
4 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. Qntl 8.62 8436.0348576 72718.620472512
5 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. Sqm 24.89428788 188.5067570956 4692.7414784631
Total Amount (in Rs.): 196606.49206268
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled Highly-Skilled
Rs. 512 Rs. 562 Rs. 462 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410d) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 26.9044765425 Square Meter - - 0.6547619047619 17.616026307589 0.6547619047619 17.616026307589 - -
2 R.C.C. Work (AR0410a) : Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 43.5158209418 Square Meter - - 0.30555555555556 13.296500843328 0.30555555555556 13.296500843328 - -
3 R.C.C. Work (AR0402a) : Reinforced cement concrete (1:11/2:3) work with 12mm size black hard hand broken granite chips - 'Reinforced cement concrete (1:1.5:3) work with 12mm size black hard hand broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (To be used for minor repair work only) 8.6419935732 Cubic Meter 4.6 39.75317043672 - - 0.68 5.876555629776 - -
4 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 8.62 Quintal 0.8 6.896 0.044 0.37928 - - 0.3 2.586
5 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 24.89428788 Square Meter 0.17 4.2320289396 - - 0.14 3.4852003032 - -
Total Qty 31.291807150917 40.274283083893 50.88119937632 2.586
Rate Per Man Day 512 562 462 612
Total Amount 16021.40526127 22634.147093148 23507.11411186 1582.632
Total Labour Amount (in Rs.): 63745.298466277
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM084 BRM104 BRM057 BRM340 BRM028 BRM162 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 26.9044765425 Sqm 0.55238095238095 14.861520375857 0.0051904761904762 0.13964704491107 - - - - - - - - - -
2 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 43.5158209418 Sqm 0.62222222222222 27.076510808231 0.0050222222222222 0.21854612295215 - - - - - - - - - -
3 R.C.C. Work (AR0402a) :.Reinforced cement concrete (1:11/2:3) work with 12mm size black hard hand broken granite chips - 'Reinforced cement concrete (1:1.5:3) work with 12mm size black hard hand broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (To be used for minor repair work only) 8.6419935732 Cum - - - - 0.9 7.77779421588 4.29 37.074152429028 0.45 3.88889710794 - - - -
4 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 8.62 Qntl - - - - - - - - - - 0.8 6.896 1.05 9.051
5 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 24.89428788 Sqm - - - - - - 0.0372 0.926067509136 0.0075 0.1867071591 - - - -
Total Qty 41.938031184088 0.35819316786322 7.77779421588 38.000219938164 4.07560426704 6.896 9.051
Rate Per Unit 297.726 58620.646 1411.11 598.442 407.34 90.1 6223.172
Total Amount 12486.042272314 20997.514892929 10975.32319597 22740.927620235 1660.1566421361 621.3296 56325.929772
Total Material Amount (in Rs.): 125807.22399558
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM084 BRM104 BRM057 BRM340 BRM028 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 26.9044765425 Sqm 0.0056666666666667 0.1524587004075 0.0051904761904762 0.13964704491107 - - - - - - - -
2 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 43.5158209418 Sqm 0.0076666666666667 0.33362129388713 0.0050222222222222 0.21854612295215 - - - - - - - -
3 R.C.C. Work (AR0402a) :.Reinforced cement concrete (1:11/2:3) work with 12mm size black hard hand broken granite chips - 'Reinforced cement concrete (1:1.5:3) work with 12mm size black hard hand broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (To be used for minor repair work only) 8.6419935732 Cum - - - - 0.9 7.77779421588 4.29 37.074152429028 0.45 3.88889710794 - -
4 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 8.62 Qntl - - - - - - - - - - 1.05 9.051
5 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 24.89428788 Sqm - - - - - - 0.0372 0.926067509136 0.0075 0.1867071591 - -
Total Qty 0.48607999429463 0.35819316786322 7.77779421588 38.000219938164 4.07560426704 9.051
Rate Per Unit 0 0 149.5 0 40.25 0
Total Amount 0 0 1162.7802352741 0 164.04307174836 0
Total Royalty Amount (in Rs.): 1326.8233070224
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 393.5 Rs. 393.5
2 Any Other Lumpsum @ Rs. 2000 Rs. 2000
3 Contingency @ Rs. 1000 Rs. 1000
Total Addition Component Amount (in Rs.): 3393.5
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1000 Rs. 1000
2 Royalty @ Rs. 1153.7593974108 Rs. 1153.7593974108
3 EMF @ Rs. 57.68796987054 Rs. 57.68796987054
4 DMF @ Rs. 115.37593974108 Rs. 115.37593974108
5 Empty Gunny Bag (Cement x Gunny Bag Rate : 2 x 3.945) @ 303.765 Rs. 303.765
6 Labour Cess @ Rs. 2000 Rs. 2000
7 Any Other Lumpsum Bill @ Rs. 4000 Rs. 4000
Total Deduction Component Amount (in Rs.): 8630.5883070224
Total Net Amount (in Rs.): 191369.40375565