Final Dpr

State: Odisha District: Jajpur Block: Rasulpur Gram Panchayat: Routrapur
Work Code: OD/356/3402/118485/401141/00070121 (Improvement/Repair & maintenance of CC road from Dhaneswar Tripathy house to Tuka Singh house at Routarapur.)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Rasulpur Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 29-12-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: SUNARAM MARNDI
Administrative Approval Details
Approval No.: OD/356/3402/118485/401141/00070121/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3402/118485/401141/00070121/TS
Fund Sanction No.: 8054
Fund Sanction Amount (in Rs.): 165000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 22.218884 7327.33511442 162805.20893642
Total Amount (in Rs.): 162805.20893642
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.218884 Cubic Meter 4.6 102.2068664 0.68 15.10884112
Total Qty 102.2068664 15.10884112
Rate Per Man Day 462 562
Total Amount 47219.5722768 8491.16870944
Total Labour Amount (in Rs.): 55710.74098624
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.218884 Cum 3.23 71.76699532 0.45 9.9984978 0.9 19.9969956
Total Qty 71.76699532 9.9984978 19.9969956
Rate Per Unit 568.667 417.99 2092.07
Total Amount 40811.521927638 4179.272095422 41835.114584892
Total Material Amount (in Rs.): 86825.908607952
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.218884 Cum 3.23 71.76699532 0.45 9.9984978 0.9 19.9969956
Total Qty 71.76699532 9.9984978 19.9969956
Rate Per Unit 0 274.25 444.5
Total Amount 0 2742.08802165 8888.6645442
Total Royalty Amount (in Rs.): 11630.75256585
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 544.43 Rs. 544
2 Contingency @ Rs. 1650 Rs. 1650
Total Addition Component Amount (in Rs.): 2194
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1650 Rs. 1650
2 Royalty @ Rs. 2949.556851 Rs. 2950
3 Additional Royalty @ Rs. 8238.7621872 Rs. 8239
4 EMF @ Rs. 147.47784255 Rs. 147
5 DMF @ Rs. 294.9556851 Rs. 295
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 144 x 3.945) @ 568.08 Rs. 568.08
7 Labour Cess @ 1% Rs. 1650
Total Deduction Component Amount (in Rs.): 15499.08
Total Net Amount (in Rs.): 149500.12893642