Final Dpr

State: Odisha District: Balasore Block: Soro Gram Panchayat: Dahisade
Work Code: OD/346/3309/116313/393793/00071792 (Construction of Market complex near Hanuman Mandir Dahisada)
Project Category: Building
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Soro Bill Status: Final Bill
Proposal Date: - Date of Commencement: 03-01-2026
Date of Completion: 12-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Creation of Capital Asset for Revenue Generation Project Sub-Category: Market Complex
Project Type: New Work Name of Executant: Sanjib Kumar Mohapatra
Administrative Approval Details
Approval No.: OD/346/3309/116313/393793/00071792/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3309/116313/393793/00071792/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge Cum 52.4552579424 240.77592 12629.962989919
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 4.4165224212032 1493.995232 6598.2634392987
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 0.897076224 6031.8461187 5411.0257399125
4 Earth Work (AR0114a) : Filling of foundation with escalated earth - Filling in foundation and plinth with excavated materials in Hard soil / Gravelly soil including watering and ramming as directed by the Engineer-in-charge. Cum 52.4552579424 133.76408892 7016.6297877287
5 Masonry Brick Work (AR0603b) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 4.2612153636864 5323.67583776 22685.329271149
6 Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 11.78531623936 5357.00583776 63134.007894099
7 Masonry Brick Work (AR0603bi) : First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 10.7126418752 5686.03656776 60912.473439704
8 R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) Cum 6.27487828608 6508.8961098855 40842.530866271
9 R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) Cum 4.0012069948032 14564.649497205 58276.177445074
10 R.C.C. Work (AR0404Ad) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) Cum 0.88911637152 13173.180338416 11712.490303871
11 R.C.C. Work (AR0404A) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) Cum 1.93553539872 6184.543770539 11970.403392811
12 R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) Cum 4.14798078464 12810.780514276 53138.871409457
13 R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) Cum 3.2818993936832 16346.951255839 53649.049415107
14 R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) Cum 0.75985017952 14677.188265292 11152.464138231
15 R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) Cum 4.14798078464 14242.308476323 59076.821888703
16 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. Qntl 26.34 8421.6029474 221825.02163452
17 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 73.1655532634 257.35818989 18829.754350169
18 Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 56.1241515868 263.44242989 14785.482869541
19 Plastering (AR1004i) : 12mm thick cement plaster (1:6) over Brick work in outside. - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. Sqm 56.8508574334 180.897515914 10284.178887283
20 Plastering (AR1004i) : First Floor - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. Sqm 59.3295094734 187.670575914 11134.403211568
21 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. Sqm 25.18786136 194.350065676 4895.262509554
22 Plastering (AR1027) : First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. Sqm 26.03606575 199.113831676 5184.1408132508
23 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 93.1508466234 94.7526285875 8826.2875727182
24 Painting (AR0920) : First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 79.4363013768 96.6498933875 7677.510059165
25 Painting (AR0918g) : Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work .(Outside) - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) Sqm 56.8508574334 156.85349521701 8917.2556945127
26 Painting (AR0918g) : First Floor - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) Sqm 59.3295094734 113.93785087145 6759.8768026565
27 Other Building Items. (AR1901B) : First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) Sqm 25.6991901817 1030.698591045 26488.119111276
28 Other Building Items. (AR1911) : Stainless steel of 304 grade in hand railing using 50mm dia of 2mm - Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with cost,conveyance, taxes of all materials, labour,T&P etc. required for the complete in all respect. and as per direction of Engineer in Charge Rmt 8.3301837334341 3129.0244276074 26065.348388373
29 Plastering (AR1017) : First Floor - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 33.19238384 288.655833752 9581.1752315516
30 Painting (AR0901bi) : Priming one coat in outer surface with primer of approved quality over iron work - Priming one coat in outer surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 10.405136 66.11573166851 687.94317975035
31 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. Sqm 10.405136 230.34345832053 2396.7550105354
32 Wood Work (AR1201) : Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) - Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) in burgahs, rafters and posts in dressed seasoned sal wood including cost of materials, labour, conveyance, taxes of all materials, T&P, etc . complete and as per direction of Engineer in charge Cum 0.26567954432 65955.643602857 17523.065337739
Total Amount (in Rs.): 880068.0820855
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 612 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 52.4552579424 Cubic Meter 0.516 27.066913098278 - - - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 4.4165224212032 Cubic Meter 0.1236 0.54588217126072 - - - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.897076224 Cubic Meter 3.9 3.4985972736 - - 0.18 0.16147372032 - -
4 Earth Work (AR0114a) : Filling of foundation with escalated earth - Filling in foundation and plinth with excavated materials in Hard soil / Gravelly soil including watering and ramming as directed by the Engineer-in-charge. 52.4552579424 Cubic Meter 0.286666 15.037138973316 - - - - - -
5 Masonry Brick Work (AR0603b) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 4.2612153636864 Cubic Meter 2.96 12.613197476512 - - 1.05 4.4742761318707 0.35 1.4914253772902
6 Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 11.78531623936 Cubic Meter 2.96 34.884536068506 - - 1.05 12.374582051328 0.35 4.124860683776
7 Masonry Brick Work (AR0603bi) : First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 10.7126418752 Cubic Meter 3.404 36.465832943181 - - 1.2075 12.935515064304 0.4025 4.311838354768
8 R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 6.27487828608 Cubic Meter 1.3333 8.3662952188305 0.1323 0.83016639724838 0.175 1.098103700064 - -
9 R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.0012069948032 Cubic Meter 1.3333 5.3348092861711 5.29605 21.190592304827 5.33875 21.361443843506 - -
10 R.C.C. Work (AR0404Ad) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.88911637152 Cubic Meter 1.3333 1.1854588581476 2.30105 2.0459012266861 2.34375 2.08386649575 - -
11 R.C.C. Work (AR0404A) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 1.93553539872 Cubic Meter 1.3333 2.5806493471134 0.0573 0.11090617834666 0.1 0.193553539872 - -
12 R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.14798078464 Cubic Meter 1.3333 5.5305027801605 3.11255 12.910797591231 3.15525 13.087916370735 - -
13 R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 3.2818993936832 Cubic Meter 1.533295 5.0321199308375 6.352395 20.847921298936 6.4015 21.009078968663 - -
14 R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.75985017952 Cubic Meter 1.533295 1.1650744810071 2.758395 2.0959669359371 2.8075 2.1332793790024 - -
15 R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.14798078464 Cubic Meter 1.533295 6.3600781971846 3.732195 15.481073144529 3.7813 15.684759740959 - -
16 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 26.34 Quintal 0.8 21.072 0.044 1.15896 - - 0.3 7.902
17 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 73.1655532634 Square Meter 0.24 17.559732783216 - - 0.16 11.706488522144 - -
18 Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 56.1241515868 Square Meter 0.2472 13.873890272257 - - 0.1648 9.2492601815046 - -
19 Plastering (AR1004i) : 12mm thick cement plaster (1:6) over Brick work in outside. - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 56.8508574334 Square Meter 0.12 6.822102892008 - - 0.14 7.959120040676 - -
20 Plastering (AR1004i) : First Floor - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 59.3295094734 Square Meter 0.126 7.4755181936484 - - 0.147 8.7214378925898 - -
21 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 25.18786136 Square Meter 0.17 4.2819364312 - - 0.14 3.5263005904 - -
22 Plastering (AR1027) : First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 26.03606575 Square Meter 0.1751 4.558915112825 - - 0.1442 3.75440068115 - -
23 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 93.1508466234 Square Meter 0.064 5.9616541838976 - - - - 0.054 5.0301457176636
24 Painting (AR0920) : First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 79.4363013768 Square Meter 0.06592 5.2364409867587 - - - - 0.05562 4.4182470825776
25 Painting (AR0918g) : Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work .(Outside) - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 56.8508574334 Square Meter 0.11776344086022 6.6949525872107 - - - - 0.10776344086022 6.1264440128767
26 Painting (AR0918g) : First Floor - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 59.3295094734 Square Meter 0.090051612903226 5.3427180208369 - - - - 0.079551612903226 4.7197581713662
27 Other Building Items. (AR1901B) : First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 25.6991901817 Square Meter 0.2268 5.8285763332096 - - - - 0.2268 5.8285763332096
28 Other Building Items. (AR1911) : Stainless steel of 304 grade in hand railing using 50mm dia of 2mm - Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with cost,conveyance, taxes of all materials, labour,T&P etc. required for the complete in all respect. and as per direction of Engineer in Charge 8.3301837334341 Meter - - 0.27300613496933 2.2741912646492 - - 0.27300613496933 2.2741912646492
29 Plastering (AR1017) : First Floor - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 33.19238384 Square Meter 0.2472 8.205157285248 - - 0.1648 5.470104856832 - -
30 Painting (AR0901bi) : Priming one coat in outer surface with primer of approved quality over iron work - Priming one coat in outer surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 10.405136 Square Meter 0.053763440860215 0.55941591397849 - - - - 0.053763440860215 0.55941591397849
31 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 10.405136 Square Meter 0.17204301075269 1.7901309247312 - - - - 0.18817204301075 1.9579556989247
32 Wood Work (AR1201) : Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) - Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) in burgahs, rafters and posts in dressed seasoned sal wood including cost of materials, labour, conveyance, taxes of all materials, T&P, etc . complete and as per direction of Engineer in charge 0.26567954432 Cubic Meter 11.785714285714 3.1312232009143 - - 11.785714285714 3.1312232009143 - -
Total Qty 284.06145122605 160.11618497259 48.74485861108 78.946476342392
Rate Per Man Day 462 562 612 512
Total Amount 131236.39046643 89985.295954593 29831.853469981 40420.595887305
Total Labour Amount (in Rs.): 291474.13577831
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRMMR0025 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM162 BRM341 BRM140 BRM255 BRM252 BRM143 BRM174 BRM131 BRMMR0024 BRMMR0023 BRMMR0022 BRMMR0021 BRMMR0020 BRM137 BRM141 BRM098
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 52.4552579424 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 4.4165224212032 Cum 1 4.4165224212032 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.897076224 Cum - - 2.29 2.05430455296 0.48 0.43059658752 0.96 0.86119317504 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Earth Work (AR0114a) :.Filling of foundation with escalated earth - Filling in foundation and plinth with excavated materials in Hard soil / Gravelly soil including watering and ramming as directed by the Engineer-in-charge. 52.4552579424 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 4.2612153636864 Cum - - 0.672 2.8635367243973 0.28 1.1931403018322 - - 350 1491.4253772902 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 11.78531623936 Cum - - 0.672 7.9197325128499 0.28 3.2998885470208 - - 350 4124.860683776 1 11.78531623936 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7 Masonry Brick Work (AR0603bi) :.First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 10.7126418752 Cum - - 0.672 7.1988953401344 0.28 2.999539725056 - - 350 3749.42465632 1 10.7126418752 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 6.27487828608 Cum - - 3.4733 21.794534751042 0.45 2.823695228736 - - - - - - 0.36 2.2589561829888 0.54 3.3884342744832 0.004005 0.02513088753575 0.189 1.1859519960691 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.0012069948032 Cum - - 3.4733 13.89739225505 0.45 1.8005431476614 - - - - - - 0.36 1.4404345181292 0.54 2.1606517771937 0.041529 0.16616612528718 - - 4.4196 17.683734434232 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.88911637152 Cum - - 3.4733 3.0881678932004 0.45 0.400102367184 - - - - - - 0.36 0.3200818937472 0.54 0.4801228406208 0.0741335 0.065913308528078 - - - - 3.7695 3.3515241624446 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
11 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 1.93553539872 Cum - - 3.4733 6.7226951003742 0.45 0.870990929424 - - - - - - 0.36 0.6967927435392 0.54 1.0451891153088 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.14798078464 Cum - - 3.4733 14.40718165929 0.45 1.866591353088 - - - - - - 0.36 1.4932730824704 0.54 2.2399096237056 0.0502172 0.20829998065842 - - 6.2216 25.807077249716 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 3.2818993936832 Cum - - 3.4733 11.39902116408 0.45 1.4768547271574 - - - - - - 0.36 1.181483781726 0.54 1.7722256725889 0.0498348 0.16355279990432 - - 5.30352 17.405619072387 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.75985017952 Cum - - 3.4733 2.6391876285268 0.45 0.341932580784 - - - - - - 0.36 0.2735460646272 0.54 0.4103190969408 0.0889602 0.067596423940135 - - - - 4.5234 3.4371063020408 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.14798078464 Cum - - 3.4733 14.40718165929 0.45 1.866591353088 - - - - - - 0.36 1.4932730824704 0.54 2.2399096237056 0.06026064 0.24995997679011 - - 7.46592 30.968492699659 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 26.34 Qntl - - - - - - - - - - - - - - - - - - - - - - - - 0.8 21.072 1.05 27.657 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 73.1655532634 Sqm - - 0.043 3.1461187903262 0.018 1.3169799587412 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
18 Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 56.1241515868 Sqm - - 0.043 2.4133385182324 0.018 1.0102347285624 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
19 Plastering (AR1004i) :.12mm thick cement plaster (1:6) over Brick work in outside. - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 56.8508574334 Sqm - - 0.0358 2.0352606961157 0.015 0.852762861501 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
20 Plastering (AR1004i) :.First Floor - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 59.3295094734 Sqm - - 0.0358 2.1239964391477 0.015 0.889942642101 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
21 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 25.18786136 Sqm - - 0.0372 0.936988442592 0.0075 0.1889089602 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
22 Plastering (AR1027) :.First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 26.03606575 Sqm - - 0.0372 0.9685416459 0.0075 0.195270493125 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
23 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 93.1508466234 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 11.643855827925 - - - - - - - - - - - - - - - - - - - - - - - - - -
24 Painting(AR0920) :.First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 79.4363013768 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 9.9295376721 - - - - - - - - - - - - - - - - - - - - - - - - - -
25 Painting(AR0918g) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work .(Outside) - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 56.8508574334 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 7.106357179175 0.084 4.7754720244056 - - - - - - - - - - - - - - - - - - - - - -
26 Painting(AR0918g) :.First Floor - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 59.3295094734 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 4.9836787957656 0.25 14.83237736835 - - - - - - - - - - - - - - - - - - - -
27 Other Building Items. (AR1901B) :.First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 25.6991901817 Sqm - - 0.1074 2.7600930255146 0.021 0.5396829938157 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.0076 0.19531384538092 1 25.6991901817 - - - - - - - - - - - - - - - -
28 Other Building Items. (AR1911) :.Stainless steel of 304 grade in hand railing using 50mm dia of 2mm - Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with cost,conveyance, taxes of all materials, labour,T&P etc. required for the complete in all respect. and as per direction of Engineer in Charge 8.3301837334341 Rmt - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.30674846625767 2.5552710838755 10.478527607362 87.288060225187 5.101226993865 42.494158124849 1.8773006134969 15.638259033318 3.5 29.155643067019 - - - - - -
29 Plastering (AR1017) :.First Floor - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 33.19238384 Sqm - - 0.0744 2.469513357696 0.021 0.69704006064 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30 Painting(AR0901bi) :.Priming one coat in outer surface with primer of approved quality over iron work - Priming one coat in outer surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 10.405136 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 0.561877344 - - - -
31 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 10.405136 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 0.561877344 0.125 1.300642 - -
32 Wood Work (AR1201) :.Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) - Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) in burgahs, rafters and posts in dressed seasoned sal wood including cost of materials, labour, conveyance, taxes of all materials, T&P, etc . complete and as per direction of Engineer in charge 0.26567954432 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 0.26567954432
Total Qty 4.4165224212032 125.24568215672 25.061289547238 0.86119317504 9365.7107173862 22.49795811456 9.1578413496983 13.736762024547 0.946619502644 1.1859519960691 91.864923455995 6.7886304644854 21.072 27.657 21.573393500025 7.106357179175 9.7591508201712 14.83237736835 0.19531384538092 25.6991901817 2.5552710838755 87.288060225187 42.494158124849 15.638259033318 29.155643067019 1.123754688 1.300642 0.26567954432
Rate Per Unit 979.85 561.987 984.79 1401.46 6.4484 33 1824.88 1788.5 58573.086 229.106 250.166 240.106 90 6210.797 249.58787 195.03787 125.74787 47.83 2041.967 660.6811111 178.42 10 256.62 256.62 240.24 142.94787 205.58787 53234.046
Total Amount 4327.529494416 70386.445178208 24680.107333225 1206.9277870916 60393.848989993 742.43261778048 16711.961522237 24568.198880903 55446.425537644 271.70871801141 22981.480441292 1629.9909063057 1896.48 171772.012629 5384.4573323431 1386.0087676855 1227.1924286453 709.43260952818 398.82442691094 16978.969523616 455.91146678506 872.88060225187 10904.850857999 4013.0900331301 7004.3516904207 160.63833905211 267.39621841254 14143.19708359
Total Material Amount (in Rs.): 520922.75141648
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM341 BRM140 BRM255 BRM252 BRM174 BRM131 BRM137 BRM141 BRM098
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 52.4552579424 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 4.4165224212032 Cum 1 4.4165224212032 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.897076224 Cum - - 2.29 2.05430455296 0.48 0.43059658752 0.96 0.86119317504 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Earth Work (AR0114a) :.Filling of foundation with escalated earth - Filling in foundation and plinth with excavated materials in Hard soil / Gravelly soil including watering and ramming as directed by the Engineer-in-charge. 52.4552579424 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 4.2612153636864 Cum - - 0.672 2.8635367243973 0.28 1.1931403018322 - - 350 1491.4253772902 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 11.78531623936 Cum - - 0.672 7.9197325128499 0.28 3.2998885470208 - - 350 4124.860683776 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7 Masonry Brick Work (AR0603bi) :.First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 10.7126418752 Cum - - 0.672 7.1988953401344 0.28 2.999539725056 - - 350 3749.42465632 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 6.27487828608 Cum - - 3.4733 21.794534751042 0.45 2.823695228736 - - - - 0.36 2.2589561829888 0.54 3.3884342744832 0.004005 0.02513088753575 0.000921 0.0057791629014797 - - - - - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.0012069948032 Cum - - 3.4733 13.89739225505 0.45 1.8005431476614 - - - - 0.36 1.4404345181292 0.54 2.1606517771937 0.041529 0.16616612528718 - - 0.045339 0.18141072393738 - - - - - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.88911637152 Cum - - 3.4733 3.0881678932004 0.45 0.400102367184 - - - - 0.36 0.3200818937472 0.54 0.4801228406208 0.0741335 0.065913308528078 - - - - 0.049542 0.044048603277844 - - - - - - - - - - - - - - - - - -
11 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 1.93553539872 Cum - - 3.4733 6.7226951003742 0.45 0.870990929424 - - - - 0.36 0.6967927435392 0.54 1.0451891153088 - - - - - - - - - - - - - - - - - - - - - - - - - -
12 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.14798078464 Cum - - 3.4733 14.40718165929 0.45 1.866591353088 - - - - 0.36 1.4932730824704 0.54 2.2399096237056 0.0502172 0.20829998065842 - - 0.076659 0.31798005896972 - - - - - - - - - - - - - - - - - - - -
13 R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 3.2818993936832 Cum - - 3.4733 11.39902116408 0.45 1.4768547271574 - - - - 0.36 1.181483781726 0.54 1.7722256725889 0.0498348 0.16355279990432 - - 0.0544068 0.17855764393224 - - - - - - - - - - - - - - - - - - - -
14 R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.75985017952 Cum - - 3.4733 2.6391876285268 0.45 0.341932580784 - - - - 0.36 0.2735460646272 0.54 0.4103190969408 0.0889602 0.067596423940135 - - - - 0.0594504 0.045173397112536 - - - - - - - - - - - - - - - - - -
15 R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.14798078464 Cum - - 3.4733 14.40718165929 0.45 1.866591353088 - - - - 0.36 1.4932730824704 0.54 2.2399096237056 0.06026064 0.24995997679011 - - 0.0919908 0.38157607076366 - - - - - - - - - - - - - - - - - - - -
16 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 26.34 Qntl - - - - - - - - - - - - - - - - - - - - - - 1.05 27.657 - - - - - - - - - - - - - - - -
17 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 73.1655532634 Sqm - - 0.043 3.1461187903262 0.018 1.3169799587412 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
18 Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 56.1241515868 Sqm - - 0.043 2.4133385182324 0.018 1.0102347285624 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
19 Plastering (AR1004i) :.12mm thick cement plaster (1:6) over Brick work in outside. - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 56.8508574334 Sqm - - 0.0358 2.0352606961157 0.015 0.852762861501 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
20 Plastering (AR1004i) :.First Floor - 12mm thick cement plster (1:6) over Brick work in outside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 59.3295094734 Sqm - - 0.0358 2.1239964391477 0.015 0.889942642101 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
21 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 25.18786136 Sqm - - 0.0372 0.936988442592 0.0075 0.1889089602 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
22 Plastering (AR1027) :.First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 26.03606575 Sqm - - 0.0372 0.9685416459 0.0075 0.195270493125 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
23 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 93.1508466234 Sqm - - - - - - - - - - - - - - - - - - - - - - - - 0.125 11.643855827925 - - - - - - - - - - - - - -
24 Painting(AR0920) :.First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 79.4363013768 Sqm - - - - - - - - - - - - - - - - - - - - - - - - 0.125 9.9295376721 - - - - - - - - - - - - - -
25 Painting(AR0918g) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work .(Outside) - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 56.8508574334 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 7.106357179175 0.084 4.7754720244056 - - - - - - - - - -
26 Painting(AR0918g) :.First Floor - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 59.3295094734 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 4.9836787957656 - - - - - - - - - -
27 Other Building Items. (AR1901B) :.First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 25.6991901817 Sqm - - 0.1074 2.7600930255146 0.021 0.5396829938157 - - - - - - - - - - - - - - - - - - - - - - - - 0.0076 0.19531384538092 1 25.6991901817 - - - - - -
28 Other Building Items. (AR1911) :.Stainless steel of 304 grade in hand railing using 50mm dia of 2mm - Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with cost,conveyance, taxes of all materials, labour,T&P etc. required for the complete in all respect. and as per direction of Engineer in Charge 8.3301837334341 Rmt - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
29 Plastering (AR1017) :.First Floor - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 33.19238384 Sqm - - 0.0744 2.469513357696 0.021 0.69704006064 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30 Painting(AR0901bi) :.Priming one coat in outer surface with primer of approved quality over iron work - Priming one coat in outer surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 10.405136 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 0.561877344 - - - -
31 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 10.405136 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 0.561877344 0.125 1.300642 - -
32 Wood Work (AR1201) :.Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) - Supplying, fitting and fixing of wood work framed and fixed (wrought and put up) in burgahs, rafters and posts in dressed seasoned sal wood including cost of materials, labour, conveyance, taxes of all materials, T&P, etc . complete and as per direction of Engineer in charge 0.26567954432 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 0.26567954432
Total Qty 4.4165224212032 125.24568215672 25.061289547238 0.86119317504 9365.7107173862 9.1578413496983 13.736762024547 0.946619502644 0.0057791629014797 1.059524497603 0.08922200039038 27.657 21.573393500025 7.106357179175 9.7591508201712 0.19531384538092 25.6991901817 1.123754688 1.300642 0.26567954432
Rate Per Unit 442.25 0 442.25 552.5 0 552.5 552.5 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Amount 1953.2070407771 0 11083.355302266 475.8092292096 0 5059.7073457083 7589.5610185625 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Royalty Amount (in Rs.): 26161.639936524
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3000 Rs. 3000
2 Any Other Lumpsum @ Rs. 77481 Rs. 77481
3 Contingency @ Rs. 10000 Rs. 10000
4 Provision for survey investigation and quality control @ Rs. 10000 Rs. 10000
Total Addition Component Amount (in Rs.): 100481
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 10000 Rs. 10000
2 Royalty @ Rs. 4119.9769703026 Rs. 4120
3 Additional Royalty @ Rs. 21423.666420676 Rs. 21424
4 EMF @ Rs. 205.99884851513 Rs. 206
5 DMF @ Rs. 411.99769703026 Rs. 412
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 1021.755 Rs. 1021.755
7 Labour Cess @ Rs. 10000 Rs. 10000
Total Deduction Component Amount (in Rs.): 47183.755