Labour Statement

State: Odisha District: Mayurbhanj Block: Baripada Gram Panchayat: Budhikhamari
Work Code: OD/365/3490/120101/390459/00013465 (CONSTRUCTION OF FACILITY CENTRE AT GP OFFICE BUDHIKHAMARI)
Project Category: Building
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Baripada Bill Status: 2nd Bill
Proposal Date: 04-02-2021 Date of Commencement: 08-02-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Provision of Facilities at GP Head Quarter Project Sub-Category: GP Facility Centre
Project Type: New Work Name of Executant: CHAPALA CHANDA PRADHAN
Administrative Approval Details
Approval No.: OD/365/3490/120101/390459/00013465/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3490/120101/390459/00013465/TS
Fund Sanction No.: 2306/PR&DW
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 602 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 80.22545662 Square Meter 0.24 19.2541095888 - - 0.16 12.8360730592 - -
2 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 102.1933 Square Meter 0.12 12.263196 - - 0.14 14.307062 - -
3 Flooring (AR0817b) : Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 27.8709 Square Meter 0.325 9.0580425 - - - - 0.325 9.0580425
4 Flooring (AR0816) : Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 16.4902825 Square Meter 0.216 3.56190102 0.55 9.069655375 - - 0.216 3.56190102
5 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 232.814918 Square Meter 0.053763440860215 12.516931075269 - - - - 0.053763440860215 12.516931075269
6 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 102.1933 Square Meter 0.11776344086022 12.03463464086 - - - - 0.10776344086022 11.01270164086
7 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 85.842372 Square Meter 0.064 5.493911808 - - - - 0.054 4.635488088
8 Iron Work (AR1704) : Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 8 Quintal 6.3976377952756 51.181102362205 1.9685039370079 15.748031496063 3.9370078740157 31.496062992126 3.4448818897638 27.55905511811
Total Qty 125.36382899513 58.639198051326 68.344119442239 24.817686871063
Rate Per Man Day 452 552 602 502
Total Amount 56664.4507058 32368.837324332 41143.159904228 12458.478809274
Total Labour Amount (in Rs.): 142634.92674363