Labour Statement

State: Odisha District: Mayurbhanj Block: Baripada Gram Panchayat: Sankhabhanga
Work Code: OD/365/3490/120107/389194/00013473 (CONSTRUCTION OF GUARDWALL FROM PWD ROAD TO JAMBHIRDIHA VILLAGE)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Baripada Bill Status: Final Bill
Proposal Date: 15-07-2021 Date of Commencement: 15-02-2025
Date of Completion: 25-03-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: ASHOK KUMAR DAS
Administrative Approval Details
Approval No.: OD/365/3490/120107/389194/00013473/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3490/120107/389194/00013473/TS
Fund Sanction No.: 11088/PR&DW
Fund Sanction Amount (in Rs.): 175808
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) : Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 16.565328 Cubic Meter 0.43 7.12309104 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 2.760888 Cubic Meter 0.1236 0.3412457568 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 24.82958608 Cubic Meter 3.9 96.835385712 - - 0.18 4.4693254944
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.58898944 Cubic Meter 4.6 2.709351424 - - 0.68 0.4005128192
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 66.425645 Square Meter - - 0.05 3.32128225 0.05 3.32128225
Total Qty 107.0090739328 8.1911205636 3.32128225
Rate Per Man Day 452 552 502
Total Amount 48368.101417626 4521.4985511072 1667.2836895
Total Labour Amount (in Rs.): 54556.883658233