Labour Statement

State: Odisha District: Kandhamal Block: Phulbani Gram Panchayat: Minia
Work Code: OD/359/3430/118986/415535/00013534 (Const. of Guard wall on the road from Daadisahi to Talasahi)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Phulbani Bill Status: Final Bill
Proposal Date: 20-04-2021 Date of Commencement: 05-06-2025
Date of Completion: 10-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Guard Wall or Retaining Wall or Protection Wall
Project Type: New Work Name of Executant: ANANDA KUMAR MEHER
Administrative Approval Details
Approval No.: OD/359/3430/118986/415535/00013534/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3430/118986/415535/00013534/TS
Fund Sanction No.: 10076 & 2459
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 14.51236 Cubic Meter 0.516 7.48837776 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 2.902472 Cubic Meter 0.1236 0.3587455392 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 30.1857088 Cubic Meter 3.9 117.72426432 - - 0.18 5.433427584
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.592104288 Cubic Meter 4.6 2.7236797248 - - 0.68 0.40263091584
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 91.416552 Square Meter - - 0.05 4.5708276 0.05 4.5708276
Total Qty 128.295067344 10.40688609984 4.5708276
Rate Per Man Day 452 552 502
Total Amount 57989.370439488 5744.6011271117 2294.5554552
Total Labour Amount (in Rs.): 66028.5270218