Labour Statement

State: Odisha District: Gajapati Block: Gosani Gram Panchayat: Bhusukudi
Work Code: OD/353/3357/117441/414694/00014036 (Maintenance of CC road at Kondi Street, Lingipur)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Gosani Bill Status: 1st Bill
Proposal Date: 25-11-2021 Date of Commencement: 25-12-2024
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: SUBHAM SARANGI
Administrative Approval Details
Approval No.: OD/353/3357/117441/414694/00014036/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3357/117441/414694/00014036/TS
Fund Sanction No.: 4469
Fund Sanction Amount (in Rs.): 100000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai) : Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift - Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 9.9 Cubic Meter 0.473534 4.6879866 - - - -
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.5415 Cubic Meter 4.6 16.2909 - - 0.68 2.40822
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 22.2 Square Meter - - 0.05 1.11 0.05 1.11
4 Earth Work (AR0115a) : Filling foundation and plinth with crusher dust well watered and rammed - Filling foundation and plinth with crusher dust well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.955 Cubic Meter 0.1236 0.983238 - - - -
Total Qty 21.9621246 3.51822 1.11
Rate Per Man Day 452 552 502
Total Amount 9926.8803192 1942.05744 557.22