Labour Statement

State: Odisha District: Balangir Block: Balangir Gram Panchayat: Bhundimuhan
Work Code: OD/345/3285/115780/420117/00015309 (Impvt. Of road at Kankara New Basti near school)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Balangir Bill Status: Final Bill
Proposal Date: - Date of Commencement: 24-03-2025
Date of Completion: 01-06-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Jyotranjan Mohanty
Administrative Approval Details
Approval No.: OD/345/3285/115780/420117/00015309/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3285/115780/420117/00015309/TS
Fund Sanction No.: 13745
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0101aa) : Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 5.8191024 Cubic Meter 0.384 2.2345353216 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.228971168 Cubic Meter 0.1236 2.7475008363648 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 26.302342848 Cubic Meter 3.9 102.5791371072 - - 0.18 4.73442171264
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.896902144 Cubic Meter 4.6 68.5257498624 - - 0.68 10.12989345792
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 80.43913352 Square Meter - - 0.05 4.021956676 0.05 4.021956676
Total Qty 176.08692312756 18.88627184656 4.021956676
Rate Per Man Day 452 552 502
Total Amount 79591.289253659 10425.222059301 2019.022251352
Total Labour Amount (in Rs.): 92035.533564312