Labour Statement

State: Odisha District: Kalahandi Block: Dharamagarh Gram Panchayat: Kadalimunda
Work Code: OD/358/3410/275646/423975/00017147 (IMPROVEMENT OF ROAD FROM KDALIMUNDA TO CG BORDER)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Dharamagarh Bill Status: Final Bill
Proposal Date: 12-07-2024 Date of Commencement: 14-05-2025
Date of Completion: 03-07-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Padmabati Senapati
Administrative Approval Details
Approval No.: OD/358/3410/275646/423975/00017147/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3410/275646/423975/00017147/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 250000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) : Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 5.372 Cubic Meter 0.43 2.30996 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 21.9805 Cubic Meter 0.1236 2.7167898 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 27.1825 Cubic Meter 3.9 106.01175 - - 0.18 4.89285
4 R.C.C. Work (AR0403A) : Reinforced cement concrete work of M-15 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-15 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 15.773475 Cubic Meter 1.33 20.97872175 0.06 0.9464085 0.1 1.5773475
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 12 Square Meter - - 0.05 0.6 0.05 0.6
Total Qty 132.01722155 7.0701975 1.5464085
Rate Per Man Day 462 562 512
Total Amount 60991.9563561 3973.450995 791.761152
Total Labour Amount (in Rs.): 65757.1685031